Deepgreen
Established Member
An article on BBC News talks of the 700s having an exterior clean and work to make toilets more graffiti-resistant, costing £3.6m. Peter Hendy is quoted as saying it proves nationalisation puts passengers first, to paraphrase. I would have thought a train washer should be able to clean the exteriors adequately, rather than have it done manually. If significant money was to be spent on the 700s, I would have preferred proper, clear permanent signing to sort out the first class debacle, and work to make the destination indicators legible - both of which would actually benefit passengers.
www.bbc.co.uk
Greater Thameslink Railway spends £3.6m on train upgrades
Greater Thameslink Railway is cleaning the exterior of 115 trains, which add up to 46km in length.
Rail operator Greater Thameslink Railway (GTR) is spending £3.6m on refreshing some of its trains.
The operator, which was bought under government control at the end of May, is cleaning the exterior of 115 trains - a total of 46km (28.5 miles) in length.
As well as the outside of trains, toilets onboard will be repainted and new wall vinyls will be fitted in an attempt to deter graffiti. GTR said this measure would also make it easier to clean graffiti from walls.
The trains operate in Kent, Sussex, Surrey, London, Hertfordshire, Bedfordshire and Cambridgeshire, with the majority of the work to be undertaken at the depot in Three Bridges.
The works follow on from a previous upgrade to Southern trains, also operated by GTR.