• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Report of collision Bedford (Elstow) - 19/06/26

Status
Not open for further replies.

joshj00

Member
Joined
7 Oct 2023
Messages
18
Location
St Neots
If a TCB fails its designed to be fail safe? How can 2 trains be in one section together? It would appear that TCOC clips have been applied to the track, perhaps after the incident. But the question remains, was this wrong routing from the the slow to the up fast? or was this a signal and detection failure allowing the trains into the same section ? thoughts? Had the stopped train cleared the previous signal but not passed far enough? Surely a call to the signaller would warrant an emergency broadcast to stop all trains.... the signals are also showing as solid yellow caution aspect... Been far too many incidents on the Bedford section in the last 12 months
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,180
Location
LBK
OTDRs can help fill in the gaps on this however, manner of driving prior, speed of AWS acknowledgements, control inputs and the manner they've been used etc
They can fill in some gaps, but not conclusively.

If a TCB fails its designed to be fail safe? How can 2 trains be in one section together? It would appear that TCB clips have been applied to the track, perhaps after the incident. But the question remains, was this wrong routing from the the slow to the up fast? or was this a signal and detection failure allowing the trains into the same section ? thoughts?
Far too early to speculate, to be fair, and the information from which to speculate is far too thin on the ground to make any speculation worthwhile. What we can say is that the train from Corby is booked to cross at that junction onto the fasts and that would have been an expected move for the driver.
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,574
Location
UK
Very tragic news.

The signal after Bedford South Junction on the up fast is automatic and is not fitted with TPWS, so the train would only have stopped in this situation (if the signal was at danger) if the driver applied the brakes himself.
I would imagine this will be an important factor in the investigation. I think there are legitimate safety questions to be asked about signals not fitted with TPWS. At the moment the industry's response seems to be that ETCS will address these risks, but I don't think there's any current timeline for ETCS rollout on the MML.
 

357

Established Member
Joined
12 Nov 2018
Messages
2,282
OTDRs can help fill in the gaps on this however, manner of driving prior, speed of AWS acknowledgements, control inputs and the manner they've been used etc
To an extent, yes, however there are a lot of units around the age of the 360s that really do not record much at all. Many just record "power", "brake" etc without any further detail
 

name_required

Member
Joined
5 Apr 2021
Messages
14
Location
Beeston
As a reminder of how safe UK railways have become in recent years: in the 20 years up to the year 2000 there were 23 fatal train collisions leading to a total of 111 deaths, whereas in the past 20 years (including today) there have only been two fatal train collisions (the other being at Talerddig in 2024) leading to two deaths.

EDIT: a couple of replies have mentioned derailments, so I'll add the numbers for those. In the 20 years up to 2000 there were seven fatal derailments (not leading to a collision with another train) that led to 23 deaths, whereas in the past 20 years there have been two fatal derailments (Grayrigg and Stonehaven), leading to four deaths.
 
Last edited:

joshj00

Member
Joined
7 Oct 2023
Messages
18
Location
St Neots
If a TCB fails its designed to be fail safe? How can 2 trains be in one section together? It would appear that TCOC clips have been applied to the track, perhaps after the incident. But the question remains, was this wrong routing from the the slow to the up fast? or was this a signal and detection failure allowing the trains into the same section ? thoughts? Had the stopped train cleared the previous signal but not passed far enough? Surely a call to the signaller would warrant an emergency broadcast to stop all trains.... the signals are also showing as solid yellow caution aspect... Been far too many incidents on the Bedford section in the last 12 months
 

Royston Vasey

Established Member
Joined
14 May 2008
Messages
2,992
Location
Cambridge
As a reminder of how safe UK railways have become in recent years: in the 20 years up to the year 2000 there were 23 fatal train collisions leading to a total of 111 deaths, whereas in the past 20 years (including today) there have only been two fatal train collisions (the other being at Talerddig in 2024) leading to two deaths.
There was also Stonehaven.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,984
Location
Surrey
Very tragic news.


I would imagine this will be an important factor in the investigation. I think there are legitimate safety questions to be asked about signals not fitted with TPWS. At the moment the industry's response seems to be that ETCS will address these risks, but I don't think there's any current timeline for ETCS rollout on the MML.
Majority of autos arent fitted with TPWS and its relevant question to be asked given ETCS roll out is a decades long project now if ever delivered but TPWS is a relatively easy overlay on existing signalling. The only rub is there are c 10k+ signals around the network.
 

357

Established Member
Joined
12 Nov 2018
Messages
2,282
As a reminder of how safe UK railways have become in recent years: in the 20 years up to the year 2000 there were 23 fatal train collisions leading to a total of 111 deaths, whereas in the past 20 years (including today) there have only been two fatal train collisions (the other being at Talerddig in 2024) leading to two deaths.
You're right that UK rail has become incredibly safe since the late 90s, but this specific statistic is quite cherry-picked. By explicitly using the word 'collisions' (train-on-train), it excludes fatal derailments - most notably the Stonehaven crash in 2020 that killed three people, and the Ufton Nervet level crossing crash in 2004 (7 deaths). Also, starting the clock exactly 20 years ago conveniently cuts out the cluster of major disasters from 2000–2002, like Great Heck and Potters Bar. The railways are vastly safer today, but those numbers erase several real tragedies through technicalities.
 

Darandio

Established Member
Joined
24 Feb 2007
Messages
11,124
Location
Redcar
As a reminder of how safe UK railways have become in recent years: in the 20 years up to the year 2000 there were 23 fatal train collisions leading to a total of 111 deaths, whereas in the past 20 years (including today) there have only been two fatal train collisions (the other being at Talerddig in 2024) leading to two deaths.

There was also Grayrigg. Still, remarkable safety record.
 

Trackman

Established Member
Joined
28 Feb 2013
Messages
4,246
Location
Lewisham
My thoughts and prayers to everyone involved.

And a big thanks to our emergency services, second to none.
I've been on emergency exercises, these pose questions like 'How do I get through this 12ft steel fence, in an emergency?'
Today it was a case of cutting through hedges, so I've read.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
There was also Stonehaven.
There was also Grayrigg. Still, remarkable safety record.
Strictly speaking, neither of those were collisions.

Grayrigg was a derailment on a crossover due to poor maintenance.

Carmont was a derailment caused by weather-related conditions, exacerbated by inadequate oversight of contractor built drainage and lack of potentially mitigating blanket speed restriction being imposed.
 

tpfx89

Member
Joined
1 Dec 2019
Messages
180
Location
Teesside
To an extent, yes, however there are a lot of units around the age of the 360s that really do not record much at all. Many just record "power", "brake" etc without any further detail
Certainly there have been massive increases in the granularity of the data available, a comparison between both units involved in this incident will reveal a gulf in the data which is available between the two. Hopefully however the data available from a class 360 will be similar in nature to that from 185s, another Desiro of a similar era, which can certainly deliver information related to the amounts of breaking and power in use. I've never seen a 360 OTDR but I'm relatively familiar with those of 185s, and lets hope their PBC position can be read in the same way.
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,180
Location
LBK
Majority of autos arent fitted with TPWS and its relevant question to be asked given ETCS roll out is a decades long project now if ever delivered but TPWS is a relatively easy overlay on existing signalling. The only rub is there are c 10k+ signals around the network.
I'm surprised this one doesn't have TPWS. It's straight after a junction and may well be a risk signal for simply notching up on "autopilot" expecting clear greens. Still, the report when it eventually comes will give some clarity.
 

CalderRail

Member
Joined
21 Aug 2013
Messages
281
A friend who works for the London emergency response teams tells me that the London HEMS unit has been sent north, and London emergency services are running part of East of England (presumably Essex) so that EofE can focus on Bedford. All of this is stuff they have pre-prepared plans for ofc.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,196
Location
Yorkshire
This thread will shortly be locked overnight.

Also, until further notice, please can we only submit posts that contain actual updates and/or new information.
 

Omnishambles

Member
Joined
13 Jul 2019
Messages
204
A very, very good point. Those people are almost always disregarded when considering who fits within the definition of “those affected”. They are very much within that definition and it’ll be a very difficult time for them.
Fully applauded, from a Control have been involved in incidents that have been declared major and 2 where staff members were killed on duty and can attest you fall into the “affected” category. Thoughts with all of those with dealings in this incident in any capacity
 

Strathclyder

Established Member
Joined
12 Jun 2013
Messages
3,819
Location
Clydebank
Had a numb, sinking feeling in my gut when I came across the BBC News live feed for this eariler (much like I had when news of Carmont first started emerging), which has only deepened the more photos/videos & details have emerged.

Truly horrible incident. My heartfelt condolences to all those affected, in and out of the railway family and to the family, friends and close colleagues of the deceased. Not much else I can or should say really.
 

Steve Harris

Member
Joined
11 Dec 2016
Messages
1,193
Location
ECML
BBC 1 News coverage has just confirmed that the fatality was one of the train drivers (who's family have been informed).

I can't give a link as yet, as their website is behind their presenter Jane Hill.
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,180
Location
LBK
BBC 1 News coverage has just confirmed that the fatality was one of the train drivers (who's family have been informed).

I can't give a link as yet, as their website is behind their presenter Jane Hill.

ITV confirming it was the driver who died.


A train driver has been killed and 33 people have been seriously injured after two trains collided near Bedford.

In a statement, British Transport Police said they responded to a call about a collision at 5.15pm, and they now know "a number of people have been injured, and one person has very sadly died."

Deputy Chief Constable Stuart Cundy said: "We've declared a major incident and a significant emergency service response is ongoing. We're working at pace to establish exactly what's happened and will provide further information as soon as we are able to."
 

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,788
Location
West is best
Majority of autos arent fitted with TPWS and its relevant question to be asked given ETCS roll out is a decades long project now if ever delivered but TPWS is a relatively easy overlay on existing signalling. The only rub is there are c 10k+ signals around the network.
It should be noted that the now obsolete GWML ATP system is far easier to overlay on an existing signalling system than TPWS is for plain line signals like automatic signals.

I'm surprised this one doesn't have TPWS. It's straight after a junction and may well be a risk signal for simply notching up on "autopilot" expecting clear greens. Still, the report when it eventually comes will give some clarity.
TPWS is normally only fitted to signals where there is a junction or points ahead (beyond) the signal. That's one of the reasons why it's cheaper than ATP systems. Hence by definition, an automatic signal will not normally be fitted.

Only where there is some other requirement (double blocking maybe) would an automatic signal be fitted.
 

rmHawk765

Member
Joined
8 Apr 2025
Messages
708
Location
ECML South
It should be noted that the now obsolete GWML ATP system is far easier to overlay on an existing signalling system than TPWS is for plain line signals like automatic signals.
I imagine ETCS Limited Supervision is just as easy to roll out though and it would solve this issue of overspeeding under restrictive aspects definitively.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
I imagine ETCS Limited Supervision is just as easy to roll out though and it would solve this issue of overspeeding under restrictive aspects definitively.
Level 1 Limited supervision would only eliminate the problem at fitted signals (by definition).
To eliminate the problem definitively would require L1 Full Supevision or L2 (overlay or no-signals).

Ive no idea how installing L1 LS compares to Western ATP but I suspect it's not as simple due to the fact NR havent rolled it out as a 'first step' and it wasn't mandated for the replacement of Chiltern ATP.
 

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,788
Location
West is best
I imagine ETCS Limited Supervision is just as easy to roll out though and it would solve this issue of overspeeding under restrictive aspects definitively.
The GWML ATP uses small current transformers to replace the 2BA (or 0BA) links in the location cupboard in the aspect feed to the signal. That means that it's easy to add without any significant modifications to the existing signalling system.
I'll add details in a separate topic.
 
Last edited:

rmHawk765

Member
Joined
8 Apr 2025
Messages
708
Location
ECML South
Level 1 Limited supervision would only eliminate the problem at fitted signals (by definition).
I am assuming here that it is actually fitted at all signals... it would of course share an issue with TPWS if not.

Now personally I am not an advocate for a halfway-done rollout again, like we saw with ATP. I'd rather L2 is just slowly rolled out everywhere but I fear we are decades away from even the beginnings of such a project.

The GWML ATP uses small current transformers to replace the 2BA (or 0BA) links in the location cupboard in the aspect feed to the signal. That means that it's easy to add without any significant modifications to the existing signalling system.
I see, didn't know about it at that level. I'm assuming ETCS L1 LS cannot be set up like this?
 

Javelin_55

Member
Joined
9 Apr 2020
Messages
156
Location
South East
The forward facing camera does not record why things happened, for example, if the driver was distracted, or became incapacitated.

Excellent point. Even with any camera footage, the worst outcome I can think of for the investigation is if all the data is reviewed and shows no signalling irregularities and the train being controlled appropriately to the conditions, up to the point of collision. Under those circumstances the only person who could explain the incident would be the driver themselves.
 
Status
Not open for further replies.

Top