Freightmaster
Verified Rep
- Joined
- 7 Jul 2009
- Messages
- 4,409
It hasn't seen a stone train since March 2020!How often is Langley Redlands used?
Last edited:
It hasn't seen a stone train since March 2020!How often is Langley Redlands used?
What will this be carrying?Realtime Trains | 6X08 2344 Dollands Moor Sdgs to Hessle Va Ttuk Hub | 08/06/2026
Real-time train running information for 6X08 2344 departure from Dollands Moor Sdgs to Hessle Va Ttuk Hub on 08/06/2026. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
First train to the new yard for HS2 in hull is running on tuesday
Not sure, i think its things like rails and sleepers for HS2, pretty sure its mainly railsWhat will this be carrying?
I wonder whether it will be an interesting consist, with vans for bundles and boxes of parts, besides bogie bolsters/flat wagons or shallow open wagons for rail lengths?The rails for HS2 are being produced 'at home' in Scunthorpe, the imports via the Channel Tunnel to the works at Hull are turnouts and turnout components from, I understand, Voest-Alpine in Austria
Thanks, i wasnt really sure but i knew it was some sort of component for HS2The rails for HS2 are being produced 'at home' in Scunthorpe, the imports via the Channel Tunnel to the works at Hull are turnouts and turnout components from, I understand, Voest-Alpine in Austria
That's nice to read and really good news for Hull, but I'm still wondering what the vehicles used will be?Here you go....
![]()
Port of Hull a winner as HS2 hires voestalpine for turnout contract
The UK’s new High Speed 2 (HS2) rail project has commissioned voestalpine Railway Systems to supply critical components for the London to Birmingham line. The global leading supplier of complete railway systems, has won a significant contract worth around 210 million pounds (about 237 million...www.railwaygazette.com
I'm still wondering what the vehicles used will be?
It already had 66192 allocated to it, and i had set my alarm for 4:30 so im a little agitated with it, i doubt ill be able to see it if it runs any other morning this weekIt seems to have been cancelled for tonight - am hoping this might mean it goes in daylight tomorrow instead...
Realtime Trains | 6X08 2344 Dollands Moor Sdgs to Hessle Va Ttuk Hub | 08/06/2026
Real-time train running information for 6X08 2344 departure from Dollands Moor Sdgs to Hessle Va Ttuk Hub on 08/06/2026. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
Has the area ben modified in the last 10 years?
So where will the actual assembly/construction process happen, somewhere directly on that site? There appears only to be a small temporary building although maybe the aerial view isn't up to date.The area where the new terminal is has been completely relaid/remodelled,
as can be seen in this Google Maps link:
![]()
Google Maps
Find local businesses, view maps and get driving directions in Google Maps.maps.app.goo.gl
I thought it was just a real time trains renaiming thing, because gbrf one is still called ditton occonor, but if u saw containers on rails, im probably wrong in my assumptionDoes anyone know what the situation is with the container port at Ditton O'Connor/Stobart rail? I went passed there the other day on the train and the tracks seemed to have the containers stacked on the tracks, I've also noticed according to RTT, Freightliner have been operating out of Widnes terminal. Is this the sidings further up from the Stobart terminal?
Realtime Trains | 4L52 2358 Widnes Freight Terminal Fl to London Gateway Frghtliner | 08/06/2026
Real-time train running information for 4L52 2358 departure from Widnes Freight Terminal Fl to London Gateway Frghtliner on 08/06/2026. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
Does anyone know what the situation is with the container port at Ditton O'Connor/Stobart rail? I went passed there the other day on the train and the tracks seemed to have the containers stacked on the tracks, I've also noticed according to RTT, Freightliner have been operating out of Widnes terminal. Is this the sidings further up from the Stobart terminal?
I was never totally clear about what was on it or whether there were two different cargoes on it - it was half cargowaggons and half curtain sided containers but maybe both had the same thing inside. As I understood it aluminum ingots from uk to germany and then the back load was aluminium coil like you say...for Jaguar Landrover (for whom some of the containers were branded). I think the stuff for jaguar landrover got offloaded at Daventry and then the train continued on to Ditton? But I always wondered if the whole train went on to ditton or just half of it.
As per above post, I think the renaming to "Widnes Freight Terminal" is just a side-effect of the changes involved with the splitting of Freightliner and Heavy Haul. Not sure why they've gone with a new location in the system rather than renaming the old one,
Freightliner stopped serving the O'Conner terminal a couple of months ago, with their two daily trains moving to the former Foundry Lane sidings
I believe Newell and Wright Transport have something to do with the move to Foundry Lane... if I recall correctly a hard standing went in near the start of the year with the gantry cranes coming shortly after.
I’m not 100% sure why but it seemed to be really badly affected by the Maersk switch a year or so ago. There were 3 trains from Felixstowe a few years back, this went down to 2 at some point in the last few years and then down to 1 (with a further split train coming off the Gateway - Coatbridge at Crewe) - a significant decline there.Thank you for the response and clarity on that. I wonder why Freightliner have reduced their trains there so much, I'm sure there used to be at least 4 trains into Ditton a day a few years ago.
Is there less garston freight aswell?I’m not 100% sure why but it seemed to be really badly affected by the Maersk switch a year or so ago. There were 3 trains from Felixstowe a few years back, this went down to 2 at some point in the last few years and then down to 1 (with a further split train coming off the Gateway - Coatbridge at Crewe) - a significant decline there.
According to RTT+ the following worked into Ditton in 2021:
4M89 Felixstowe (16:13) to Ditton (04:05)
4M73 Felixstowe (21:41) to Ditton (05:36)
4M88 Felixstowe (09:32) to Ditton (19:41)
and out of:
4K40 Ditton (01:18) to Crewe (03:25) forming into 4L89 Crewe (04:10) to Felixstowe (13:04)
4L92 Ditton (14:03) to Felixstowe (00:29)
4L82 (?) Ditton (21:30) to Felixstowe (07:23)
In late 2024, into Ditton:
4M42 Felixstowe (21:52) to Ditton (06:15)
4M88 Felixstowe (09:32) to Ditton (19:46)
and out of:
4K40 Ditton (01:00) to Crewe (02:52) forming into 4L89 Crewe (04:09) to Felixstowe (13:04)
4L92 Ditton (13:49) to Felixstowe (00:27)
….even from then, it’s been a decline. It’s a shame to see this.
It can join the likes of "York Thrall Europa" (which closed in 2002 and has been Network Rail's York Holgate Works since 2009) or "Sellafield BNF" (which transitioned to NDA ownership in 2005) in the ranks of long-extinct railway names still used by enthusiasts because they blindly believe what shows up on timetable websites as nobody bothered to change the TOPS location names (or even get rid of ones that were turned into retail parks decades ago).As per above post, I think the renaming to "Widnes Freight Terminal" is just a side-effect of the changes involved with the splitting of Freightliner and Heavy Haul. Not sure why they've gone with a new location in the system rather than renaming the old one, but the former O'Connors terminal is generally referred to as Widnes despite being previously known as "Ditton FLT" on schedules. I've seen a previous drone video where containers had been stacked on at least one of the sidings, but the terminal was still very much operational.
It can join the likes of "York Thrall Europa" (which closed in 2002 and has been Network Rail's York Holgate Works since 2009) or "Sellafield BNF" (which transitioned to NDA ownership in 2005) in the ranks of long-extinct railway names still used by enthusiasts because they blindly believe what shows up on timetable websites as nobody bothered to change the TOPS location names (or even get rid of ones that were turned into retail parks decades ago).
6X08 is operating with RT3973 form LDS036EXL, which is for BQA/IGA/IGB/YEA wagons loaded with continuous welded rail. Would be interesting to know if this is actually the case, if the yard is meant for turnout components.Should be a mixture of 804736xxxx IGA and 843523xxxx IWA wagons. These types are bogie flats, with the IWAs being former vans, like the ones GBRF have used on their LUL stock moves (pale blue with 8 chunky stanchions down each side).
Does anyone know if the GBRf Drax Aes to Tyne Coal Terminal Vv services have ended or on a break?
There is still the odd train, like this one last Friday:I've noticed none have seem to ran lately normally used to get a handful of services a day.