The latest RAIL edition has an item on Network Rail warning there is only one spare path every 2 hours along this stretch of the mainline and that it's close to being declared "congested". What would be the best options for alleviating this?
The article mentions they've tried to get more electric traction on freight, which can accelerate out of loops faster, though this doesn't do much. Other ideas floated include extending existing loops and signalling enhancements. IIRC this section is mostly 3-aspect; what difference would 4-aspect make?
The article mentions they've tried to get more electric traction on freight, which can accelerate out of loops faster, though this doesn't do much. Other ideas floated include extending existing loops and signalling enhancements. IIRC this section is mostly 3-aspect; what difference would 4-aspect make?