• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by sjoh

  1. S

    Airbus A321, different emergency exit positioning

    Usually because there need to be a certain number of exits per no. of passengers. If they squeeze in an extra row of seats or 2 it sometimes tips the balance towards needing another exit. Easyjet's A319s have an additional exit on each overwing for this reason.
  2. S

    EMR intercity - As bad as xc?

    Would be particularly poor taste to blame EMR for that anyway...
  3. S

    Examples of stations that have an 'unpaid' footbridge/subway and have ticket gatelines leading to each platform

    Quite a few on the underground if they count - Leytonstone springs to mind! Pedestrian subway with access to ticket hall/barriers off to the side.
  4. S

    WCML South, evening of 22/04/25

    2Y76 21:36 Birmingham to Euston (22.04.25) This service seemed to run fine as far as Bletchley before turfing everyone off, running ECS to Euston, turning around, and running ECS to Northampton. For the poor folks left at Bletchley, there was an hour and 20 minute wait for the next train as it...
  5. S

    Passengers stranded after being let off train for fresh air

    I think there may have also been a driver change, which probably added to the confusion. Possible second driver wasn't told to double check with guard about passengers on platform?
  6. S

    WMR Reduced Class 172 Formations

    170s probably not terrible on Herefords, but they're definitely a drag on the Shrewsburys and indeed everywhere else with lots of short spaced stops. They're just not designed for it. And keeping a fleet of 170s just to run to Hereford doesn't make a whole lot of sense.
  7. S

    Does anyone know if this is true about the bins at New Street?

    I would assume that a station like New Street would have its waste collected by commercial contractors such as Biffa or Veolia rather than the local authority, no?
  8. S

    WMR Reduced Class 172 Formations

    Do Chiltern currently really require all 6 of the 196s for east-west rail traction learning? How feasible would it be for them to loan 3 (or so) of them back to WMR until EWR starts?
  9. S

    Trivia: Most interesting bit of timetabling?

    I'm always impressed by the overall neat hourly timetable pattern on the West Anglia mainline between Liverpool St/Stratford and Bishops Stortford which accommodates 4 cambridge (in the peaks), 2 bishops, 4 stansteds, and 2 hertfords all with a mix of stopping/semi patterns every hour on a 2...
  10. S

    Oldest departure screens

    There's one very annoyingly small crt type monitor on the eastbound electrics platform at Maryland station that must date back to the 90's. Frankly I'm surprised it wasn't gotten rid of when the liz line started. As far a I know, it's still there. What's more, it is the ONLY departure board on...
  11. S

    Leyton station upgrade

    I assume this was before the A12 was built alongside and the Langthorne Road footbridge is the bridge you're referring to? I'd assumed the northern entrance/exit people were referring to was the emergency exit along an alleyway out onto Goodall Rd! Had no idea it was a fairly significant structure!
  12. S

    CCTV on trains

    CCTV is a broad term in itself. There are many different CCTV systems with different functions. Train door cameras for DOO, forward/rear facing "dashcams" for accident investigations/(sometimes) track/line side monitoring, OHLE cameras to monitor pantographs, internal cameras to both deter and...
  13. S

    Oxford Corridor Phase 2 & Platform 5 updates

    On a practical note, is anyone able to explain how they plan to use platform 5? I.e. to terminate services from the south before they turn in the sidings? or will platform 5 be the main "through" platform with 4 being used to terminate and restart services going south again?
  14. S

    Is it a practical solution to build a second line that operates like Victoria Line? What would be the issues? How might it help in London?

    You've gotten the combination stations mixed up, but agreed. I suppose adding an additional platform face on the opposite side to the Victoria line platforms might be a potential not-quite-so-horrendously expensive option, and potentially a little less disruptive too, but would still be ... a...

Top