The instruments came in both hands. When BR replaced older instruments with its standard type, it matched the orientation of TOL (left or right) with the replaced instruments so that the signaller would see no difference.
Network Rail's CP7 plan at https://www.networkrail.co.uk/wp-content/uploads/2024/03/Southern-CP7-Delivery-plan.pdf includes this brief mention "Renewal of the SIMIS-W signalling system in Havant which is facing an obsolescent risk" on page 25.
NR plans to use Healey Mills as a local distribution centre for TRU work from spring 2025. Stock stabling for Northern is planned for a five-road depot at Hillhouse, closer to Huddersfield, with commissioning expected end Sept 2025
DfT approves Network Rail plans for Leeds-Micklefield section of TRU. Mainly closure of level crossings and rebuilding of bridges to allow for electrification.
https://assets.publishing.service.gov.uk/media/66fbfc84e84ae1fd8592ec22/network-rail-leeds-micklefield-order-decision__1_.pdf
If memory serves, this style of commutator doesn’t reverse polarity. It needs two batteries connected in series with a common centre tap and then uses positive or negative voltage (in relation to the common centre at 0V) to swing the needle to TOL or LC.
RAIB Statement: Salisbury rail accident
The following statement was given this afternoon by Andrew Hall, Deputy Chief Inspector, Rail Accident Investigation Branch.
"A team of RAIB inspectors arrived on site on Sunday evening and were joined yesterday by additional inspectors and our support...
He told me he had to run to get his train from Glasgow so decided to even things up by walking from Haymarket. Had he missed that Glasgow train he would have been 15 minutes behind the Lumo. In the end, it was pretty much a draw.
It's vague because NR and TS haven't yet decided what to do. It's likely to involve signalling upgrades to increase capacity and shorten journeys. There's likely to be work at Dundee, Arbroath, Montrose and Aberdeen stations that could include longer platforms. There might be extra freight loops...