Recent content by PartyOperator

  1. P

    Should the GBR Livery be Neutral Colours?

    Could have just copied the LNER livery because it already exists and it looks fine and it's England flag coloured without having annoyed anyone so far.
  2. P

    Freight growth to 2040 - how might this be achieved)

    For a 'single large nail' solution to government targets - you could double current freight tonne-km using a 100,000 tonne train going round and round a 5 mile long circular track at 25mph for roughly half of the year. Put it somewhere flat and unpopulated. Electrify the line and run when power...
  3. P

    Fantasy - GWML west of Old Oak Common

    Why would a broke railway funded by a broke government have built a tunnel from OOC to Northolt?
  4. P

    The woes of the Cotswold line and Oxford station

    I quite like the current arrangement. The tickets are usually free after delay repay and it's easy to make plans because the delays are so predictable. I can imagine it would be frustrating for a regular commuter though.
  5. P

    What does the term "no brainer" mean in the context of ideas for reopenings etc?

    Birmingham to Manchester is the most no-brainer candidate for electrification. The UK's 2nd and 3rd largest cities, with a string of large towns/cities between them. Unpleasantly crowded diesel trains. Constant discussion about the need to increase capacity. Oh, and someone seems to have fitted...
  6. P

    Should GBR have a freight business? Is the sale of DB Cargo UK an opportunity to acquire one?

    Is there a long-term future for DRS under the Nuclear Decommissioning Authority? AGR defuelling should be complete by the mid 2030s assuming no further life-extension, and all future reactors will use interim dry storage on site. The need for transport to a central disposal facility is many...
  7. P

    Off the road at Paddington

    Well... It's nice to see we have some spare capacity, at least on an otherwise uneventful Sunday. Hopefully they learn from this. Perhaps worth reviewing the risks and benefits of operating these rather bulky vehicles on platforms. Paddington always seems to have a lot of them squeezing through...
  8. P

    Off the road at Paddington

    The cart is apparently called Robert, if that is of any use...
  9. P

    Climate adaptation challenges facing a railway built for a very different world?

    A few simple things - paint the rails white, increase the stress-free temperature (winter minimums are up too), get better at cutting back flammable vegetation. Develop a hot weather timetable and try to announce it a couple of days in advance so people can make plans. Trying to run the best...
  10. P

    New Northern line (London Underground) depot

    There's a large disused site near Totteridge and Whetstone that used to be a railway horse hospital. https://www.ianvisits.co.uk/articles/northern-line-upgrade-could-bring-a-new-train-depot-to-a-former-horse-hospital-86396/
  11. P

    Optimising use of capacity

    How about building a new station in Birmingham with seven 400m long platforms for... 4tph?
  12. P

    Was an Elizabeth Line-Victoria Line interchange ever considered?

    Remember Crossrail 2 is/was planned to have a station at Tottenham court road, and would provide an express service relieving the Victoria line between Victoria and Euston/St Pancras and on to Tottenham Hale.
  13. P

    “Along track conductor” question.

    Sounds like you're noticing the difference between traditional 25kV OHLE and the newer 2x25kV autotransformer system. With 2x25kV there's a negative feeder out of phase with the catenary so power is transmitted at 50kV. Booster transformers aren't needed.
  14. P

    HS2 Construction Updates -Long Itchington to Great Missenden / Chilterns North Portal

    Building a 1.5 mile cut and cover tunnel through a disused airfield/industrial estate is an astonishing way to use public money. How did this happen?
  15. P

    Failures in hot weather. What needs to change?

    HS2, so we can run slower trains with more slack in the timetable on existing lines and keep the fast, long distance trains running on infrastructure that can handle it. It should cost less, but it's the infrastructure we need (also for flooding etc.)