• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by mr_jrt

  1. M

    West London Orbital - Future Interchange Aspirations

    If you left the Neasden platforms as they are, I wonder if you could knock the siding/headshunt north of the platform though under the road as a new running line, which would then give you your cross platform dual island layout. Alternatively, shift the Chiltern lines south, and have the same...
  2. M

    West London Orbital Consultation

    You know, I read this the other day, and largely agreed, I think it would be nice, but won't happen. But you know what, this is a forum of intelligent reasonably-informed people, so why not ask the questions and have a discussion? :) ...but for once in my life, I'll be good and do so in the...
  3. M

    West London Orbital - Future Interchange Aspirations

    From: https://www.railforums.co.uk/threads/west-london-orbital-consultation.307477/post-7960948 You know, I read this the other day, and largely agreed, I think it would be nice, but won't happen. But you know what, this is a forum of intelligent reasonably-informed people, so why not ask the...
  4. M

    West London Orbital Consultation

    Indeed. If you want West Hampstead from most of the line, there's always the existing LO Richmond-Stratford service, though the interchange at OOC will need to be good. Serving Cricklewood on its own given the existing Thameslink service provision was never going to wash its face in a MVP...
  5. M

    My proposal for railcard reform under GBR

    Surely that's no different to a day shift worker having to buy a peak single to get to work and an off-peak single to get home? Arguably paying key workers better would be the ideal solution there? As for the earlier point about simplification being worse...I don't see it as a necessary...
  6. M

    My proposal for railcard reform under GBR

    I appreciate it's a bit glib, but my personal opinion is that the railway serves a valuable-but-difficult-to-quantify social benefit, so the obsession over revenue is problematic, to say the least. With that in mind, my proposal is simple. Ideally, reduce off-peak fares to the railcard...
  7. M

    Upgrading the Chiltern Line

    Hard agree, but I can see how it was an easy thing to cut to reduce costs. It would be horrendously disruptive, but it could presumably be added at a later date by reconfiguring the southernmost turnback into a through line to permit the other lines to be taken OOU whilst the flyover was...
  8. M

    Upgrading the Chiltern Line

    An older design had the three turnbacks extending up the NNML corridor under a flyover for the up Crossrail line, with two of them intended for linking to the WCML via the Dudding Hill line. The flyover was removed when the link was cancelled. You can see one of the designs (abet a low-res...
  9. M

    Strange pricing for short journey

    I suspect I already know the answer to this (TfL want you using contactless, even though it doesn't play nice with more complex situations), but figured I'd ask here anyway for confirmation and to vent a bit. :) The other day I made a trip from Brighton to Watford to meet some friends, with an...
  10. M

    Re–Opening of main–line local services?

    Another MML candidate I'd like to throw in would be Burton Latimer. It's quite a gap between Kettering and Wellingborough, it's a four-track electrified section, and has the EMR connect service already running over it.
  11. M

    Didcot-Swindon "getting full" - possible capacity improvements?

    Recalled having this discussion in the past, and have the info (with links to maps) in my old post: https://www.railforums.co.uk/threads/great-western-electrification-progress.83452/page-184#post-3103125
  12. M

    Oxford Station - complete rebuild suggestions

    ..and here's my concept from an even older one, 10 years ago! https://www.railforums.co.uk/threads/new-oxford-station-design-concepts.124180/page-2#post-2487694 &tldr; I proposed abolishing the through roads and using the space to get 6 through platforms and possibly even 2-3 bays.
  13. M

    Brighton Mainline 4G/5G upgrades

    Oh, thank jeebus, at last, some movement. The reception along there is shockingly bad, made all the worse by, at most, only half the Thameslink trains actually having their wifi installed.
  14. M

    What if the Greenwich Park and Crystal Palace High Level branches remained open?

    I like to imagine that there would now be a LO service branching south at Victoria Park, heading south through Poplar, running down into a tunnel at Mudchute, and popping back up in Greenwich Park and running to Clapham Junction. :)

Top