  1. M

    Transpennine Route Upgrade and Electrification updates

    Thanks Josh - good point :)
  2. M

    Transpennine Route Upgrade and Electrification updates

    Hi all Ref Stalybridge to Marsden works If you have not already seen this then this weblink is towards the initial 'public consultation' which is now closed (I guess a pre requisite to the TWAO/public inquiry?) https://stalybridgetodiggle.consultation.ai/ It lists interventions between...
  3. M

    Transpennine Route Upgrade and Electrification updates

    Seems some planning notices have been issued in the local free Tameside advertiser newspaper in regards the Stalybridge-Diggle works. (these are not the full plans just the notification) Right hand side of this page https://online.flippingbook.com/view/243075816/30/#zoom=true (page 31 of the...
  4. M

    Transpennine Route Upgrade and Electrification updates

    and for clarity the 'Stockport Road Level Crossing' - is just a farm track, a car would get stuck well before it got any where near (i dont believe there are any 'real' road (barrier /lights) level crossings between ashton and somewhere east of huddersfield ) 1739899717 it looks simple on...
  5. M

    Transpennine Route Upgrade and Electrification updates

    As a local commuting daily almost in parallel by car (starting near the ex heyrod power station) i would say the road overbridge at Greenfield station will be the most difficult / disruptive (outside of the railway) if it really is a rebuild
  6. M

    Transpennine Route Upgrade and Electrification updates

    It seems the spillway was replaced recently (2018) with a plastic one allowing Electrification https://www.amcogiffen.co.uk/downloads/53/AMCO_Standedge_Tunnel_Data_Sheet_A4.pdf