Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Apologies if I've missed a response to this. LU (and before that LT) practice is to number sidings from 1 upwards. HOWEVER where access to sidings is authorized by shunt signals with (so-called) theatre type route indicators then the number 20 is added such that sidings are numbered 21 upwards...
When the Great Northern & City was built (it opened in 1904), it was shield driven and entirely lined with cast iron and cement grouted in usual way. As each section was driven forward, the lower cast iron segments were removed in short sections and replaced by a number of rings of brickwork...
I found the site on Friday, in East Road, near junction with New North Road. The railway runs well behind the building line owing to road curvature. The attached link goes to a plan showing the location (it is the left hand tunnel (northbound), the one further from the arrow). Depth below ground...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.