Summit Tunnel on the L&Y is similar, but there's a reduction in permissible speed which is signed at the entrance to the tunnel in the down direction. The actual reduction commences much further in advance, about 7/8 the way through the tunnel, at 16m 40ch which is about 24ch on approach to the...