• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by Goldfish62

  1. G

    Class 175s to GWR

    According to post #4091 above GWR are taking all 22 remaining Class 158s. Meanwhile, GWR have issued a stakeholder update re the 175s. I can't elaborate because without access to the source material I'd be in breach of forum roles merely pasting the quote with no link here. Hopefully someone...
  2. G

    'Upgraded' GWR IET seats

    Maybe if some forum members did a bit of travelling around Europe they'd realise what an insult the IET seats (and ride quality) are. We always seem to be all too ready to accept mediocrity in this country with everything.
  3. G

    Southeastern metro fleet replacement/improvement

    Depends which suppliers they all go with. If they all go for the same supplier I imagine that could present issues, but there's all the usual suspects in the bidding. I can't see any TOC going, "we're not going to bother ordering now in case someone else chooses the same supplier and delays...
  4. G

    Class 175s to GWR

    GWR doesn't have any spare stock end of! Even assuming a full 175 deployment it will still be short of Turbos for its Thames Valley services and running chronically overcrowded 5-car IETs on long distance services.
  5. G

    Southeastern metro fleet replacement/improvement

    The September Modern Railways reports that South Eastern have reached a decision on the Networker replacement and hope to place an order by the end of this year...
  6. G

    All cross country services suspended 23/08/26

    Yes, Virgin did, and had regular exercises utilising it. This was highlighted by Chris Gibb on Green Signals yesterday, also pointing out that having a contingency control centre should be part of the standard business continuity plan for any relevant business, not just the railways.
  7. G

    Go Cornwall Bus

    Yet single decks are very common on the 17. I wonder how the 19 has done. Most times I've looked on Bustimes.org everything has been running 30-45 min late. A symptom of too tight running time, too long a route through too many summer traffic blackspots and insufficient recovery time. Can't...
  8. G

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Even with everything allocated as it should be Reading/Weybridge services are still roughly 3 x 450 for every 4 x 701. Depending on what time of day and where you'll often see either all 450s or all 701s on Reading services. SWR has long been a relative island of sanity in the Yellow Line...
  9. G

    SWR Class 458/4s: fleet status and withdrawal updates

    That must have been some fire given that Reading services were diverted via Weybridge for the rest of the day. The last arrival at Reading didn't reach there until 02:04! I imagine there's been a fair bit of rolling stock displacement.
  10. G

    SWR Class 458/4s: fleet status and withdrawal updates

    And they look better for it!
  11. G

    Class 701 'Aventra' trains for South Western Railway: progress updates

    You have inside information to be able to make that statement?
  12. G

    SWR Class 458/4s: fleet status and withdrawal updates

    A matter of opinion whether the front ends were iconic. Pig ugly springs to mind more. :lol:
  13. G

    SWR Class 458/4s: fleet status and withdrawal updates

    There was a farewell tour for the 458/0s in 2015 which was fully booked and very popular with younger enthusiasts.
  14. G

    SWR Class 458/4s: fleet status and withdrawal updates

    Now on its way into Waterloo, running late.

Top