Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
As usual, no thought of passengers from the Largs line. The hourly train is being terminated at Kilwinning at 32 minutes past the hour. There is an hourly service from Ayr to Paisley, which leaves Kilwinning at 27 minutes past the hour, so a 55 minute wait at Kilwinning. The return journey...
There are several properties that can only be accessed by a level crossing in Corpach near Fort William. Some are accessed by a private level crossing with a sign saying Authorised Users Only.
A much better idea would be to redouble the entire route and run fast expresses from Waterloo to Exeter, Barnstaple , Plymouth and Penzance. It would allow slow trains from Paddington via Bristol to connect at Exeter.
Catching a train into Glasgow Central can be really annoying if the ticket inspector stays in the back cab for the entire journey. I travel from a unstaffed station with no ticket machine, and if I can’t buy a ticket on the train, I have to queue up to buy a ticket to exit the barrier. Not good...
Tonight is the last night of Stagecoach operations from Stranraer, Dumfries and Whithorn depots. Only a few Stagecoach buses based at Dumfries and Stranraer as outstations of Cumbernauld and Ayr. Let’s hope the changeover to the new operators goes well and passengers aren’t left stranded.
It would be more sensible for the coach to Cairnryan to connect with trains from Girvan or Stranraer. However, the train and ferry timetables are such that no connections are possible without a very long wait.
So from Glasgow to London will require Scotrail from Glasgow to Carlisle via Dumfries, Trans Pennine from Carlisle to Preston, then Avanti from Preston to London. Avanti are extracting the michael as usual.
When I used it to travel from Glasgow to Bristol for a morning meeting, I used to get the sleeper to Taunton and another train back to Bristol, in order to arrive at a sensible time.
The Scottish Government has hopefully learned lessons from the Calmac Ferry fiasco, and is allowing sufficient time for the HST replacements to be designed, sourced, built and commissioned in time for the planned 2030 replacement. Six years seems sensible. Of course, journalists, particularly...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.