Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
On the Underground the end came with the implementation of OPO/OMO One Person Operation, previously Guards were able to switch lights off in open sections and switch them on for long tunnels. With OPO it became mandatory for lights to be on while the train was in passenger service.
Paths are now available for empty late evening test runs, from Northfields depot to Barons Court siding and back. So you may witness one after 22.30 Mon-Thur evenings. These are not guaranteed to operate.
Also, to aid testing during cancelled engineering hours and planned closures, the tunnel...
Signal failure caused by defective block joint, later thought to be defective insulation of temporary track clamp.
Southbound train stalled approaching Brixton for 25min.
service suspended 08.35-11.30
Nothing at Neasden, there was however a report of smoke on the track at Kilburn which required the suspension of MET and Jubilee services from 0805, fire brigade requested. An initial ride-through failed to locate the issue. LFB attended and traction current off for 20min. Both Lines resumed...
A rather long drawn out SPAD incident of a westbound PICC train, which required a wrong direction movement at Rayners Lane.
incident from 0730-0840.
corrected.