• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by boxerdog

  1. B

    Class 730 LNR & WMR Delivery/test Updates

    Coventry works will include stabling/tanking and so will Northampton. Maintanance is carried out at Bletchley.
  2. B

    Class 730 LNR & WMR Delivery/test Updates

    Coventry is having further works for stabling more Class 730/0 units. This will free up space elsewhere to stable units. Northampton was being looked at for stabling more units, which would be the green ones.......
  3. B

    Class 730 LNR & WMR Delivery/test Updates

    Currently it's on hold, Coventry Carriage is having works done to stable units there
  4. B

    Class 730 LNR & WMR Delivery/test Updates

    It's possible to be faster than you want to be at the top of the Lickey-I'll leave that to you to understand what I mean. They're certainly (quite a bit) faster than 323s (although we're mandated to use less power on starting away than a 323-so it'll be rare that you see a 'launch control'...
  5. B

    What is happening with the Royal Mail 325s left at PRDC?

    No, not as far as I am aware, I was thinking aloud.....
  6. B

    What is happening with the Royal Mail 325s left at PRDC?

    Maybe it's something to do with the Class 93?
  7. B

    Almost got trapped inside Leamington Spa station for the night

    WMT have fitters and cleaners at Leamington for at least part of the night.
  8. B

    WMR Class 196 Build and Implementation

    90mph isn't ECO, ECO is an operating mode which is to do with gear changes & engine revs - if I remember correctly. Unit operational modes are: ECO = Economic NOR = Normal PW = Power SPW = Super Power As for the 90mph limit being in place still, depends on the timings as the 196 is quite...
  9. B

    WMR Class 196 Build and Implementation

    No, WMR 196s are limited to 90mph and are set up to run in 'ECO' mode as there are other operational modes available.
  10. B

    WMR Class 196 Build and Implementation

    WMR Class 196s are limited to 90mph
  11. B

    Class 730 LNR & WMR Delivery/test Updates

    I believe it was going to have an upgrade in line speed to 90mph (I think) probably around 10 years ago. I think there was too much work to be done to the trackbed, as allegedly it's very difficult to maintain, possibly due to being clay. I believe that's what I was told a 'little' while ago.
  12. B

    5 Class 350s Flood Damaged

    The units that I was on about were the ones in platform 4 & 5 as stated in my post
  13. B

    5 Class 350s Flood Damaged

    Hate to say it again, see post #22
  14. B

    5 Class 350s Flood Damaged

    Again, post #22, the information was there since Sunday

Top