Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
The NR DVTs (there are four) have got 60kVA three-phase generators, the Chiltern DVT's have 250kW, 850V DC - very different and for completely different uses.
The Nightstar generator was considered in the very early days of the Chiltern DVT concept but was discarded as totally unsuitable. If I remember rightly, it's the wrong voltage, way over size and installation would have meant taking the roof off - something we went a long way round to avoid...
For those who like this sort of thing:
6264 Gen Van
6263 Gen Van
6262 Gen Van
6261 Gen Van
977995 NMT BV
977984 NMT MC2
975984 NMT MC1
975081 SGT
975280 SGT
999600 TRU
999601 TRU
999605 UTU2
999602 UTU3
999606 UTU4
977869 RSC2
975091 Mentor
9701 DBSO
9708 DBSO
9714 DBSO...
The NMT surveys the main line network over a two-week pattern. It's regular presumably because being hauled by an HST, it can run with main traffic and doesn't interfere.
The slower stuff (UTUs, RSCs, TIC, MENTOR etc) get in the way of "normal" traffic so have to be specifically arranged to...
The Network Rail vehicles will have 60kVA, 400V, three-phase machines fitted.
--- old post above --- --- new post below ---
It could. I started talking about this in 2002 and it's come back three or four times since then. We also got into discussions over a similar idea in Ireland on the...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.