• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by AFJF

  1. A

    Brighton Mainline 4G/5G upgrades

    The new mast at Haywards Heath Ashenground bridge is progressing well.
  2. A

    Brighton Mainline 4G/5G upgrades

    Cellnex are currently running a consultation on a new mast just off of Rocky Lane in Haywards Heath. Mid Sussex application DM/25/1495 - The installation of a 22.5 metre lattice mast, mounted with 9No. antennas, 12No. cabinets, 1No. Electrical meter cabinet located within a compound comprised...
  3. A

    Thameslink Services / Timetable from 18 May 2019

    In the Thameslink consultation, I’m sure I recall the Brighton<>Cambridge services as being 2tph all evening south of the Thames, but they currently reduce to 1tph after the PM peak. I haven’t got a copy of the consultation proposals, so can anyone tell me if I imagined this or not. The reason I...

Top