Tim R-T-C
Established Member
- Joined
- 23 May 2011
- Messages
- 2,143
Don't tell AVRUG, they complained enough about the 322s coming down because they are so 'old'.
How do you know that London Midland won't open a base at piccadilly and take on surplus northern guards?![]()
Because they spent enough time trying to get rid of the things in favour of the more powerful 321s. Corridor connections aren't much use in a DOO zone. How about, why don't we get the 321s an someone else get's lumbered with our 317s?![]()
Incidentally are the new LM 350s going to be 350/3s? I thought they were going to have the same spec as the 350/2s and the 350/3s would be a revised spec for the TPE services.
All operators would like more stock. Being required to run more services does not always result in more stock being allocated - just look at the TPE franchise
And that level of seating makes sod all difference to the peak capacity to the units![]()
Didn't Siemens state that the order was too small to have two different versions of the fleet for the money on the table so they are same spec? I've used the term 350/3 as that's what respected rail press have used.
Not as far as I recall. I recall Siemens telling them to hurry up if they wanted units in service in 2013 because a small order will mean a small production line will be set up which will take longer per unit to procure.
The LM press release only mentions the TPE units have the revised internal layout:
Negotiations with the preferred supplier in respect of the units destined for the Manchester to Scotland service are likely to include certain interior design changes which reflect the longer distance journey patterns on this route.
http://www.londonmidland.com/news/l...n-midland-and-for-first-transpennine-express/
I must admit I've heard the 365's will also be replaced.. shame really, they're by far my favourite class of EMU - I'll no doubt prefer them to these delightful replacements from Siemens..The Current "FCC" 317's and 321's will be available by 2018 anyway when the Thameslink stock is all delivered and the non-Thameslink services outer suburban services on the ECML are solely run by 365's (leaving 313's on the Moorgate services).
Why would anyone swap stuff around for a couple of years
What is the current status of the 317/7s?
Are they all off-lease now?
Are they all stored or is one still lingering covering for an unreliable 317511?
Where are they stored?
The LM press release only mentions the TPE units have the revised internal layout:
Negotiations with the preferred supplier in respect of the units destined for the Manchester to Scotland service are likely to include certain interior design changes which reflect the longer distance journey patterns on this route.
http://www.londonmidland.com/news/l...n-midland-and-for-first-transpennine-express/
Agreed. Or in the extreme case more seats = less capacity as people hate the 3+2 so more stand in less available room.
I must admit I've heard the 365's will also be replaced.. shame really, they're by far my favourite class of EMU - I'll no doubt prefer them to these delightful replacements from Siemens..
The Guardian suggested that the 365s would be refurbished and put on North TPE after electrification. I hope not, unless they were referring to the additional Leeds-Manchester semi-fasts, as the introduction of those services should mean the North TPE services will carry less commuter traffic meaning a higher proportion of passengers will be long distance travellers.
Would Leeds-Manchester semi fast be just the current Leeds Dewsbury Huddersfield Stalybridge Piccadilly, or some others as well? Would it be Northern or FTPE (or successors to either)?
The Guardian suggested that the 365s would be refurbished and put on North TPE after electrification. I hope not, unless they were referring to the additional Leeds-Manchester semi-fasts, as the introduction of those services should mean the North TPE services will carry less commuter traffic meaning a higher proportion of passengers will be long distance travellers.
They accelerate very quickly, but I am not sure how they would work on steep hills.
The 365s are fantastic trains - anyone who got them would be very lucky. I'm sure they'd prove more reliable (and comfortable) than any new build train to replace them. The only thing they lack is air conditioning.
They accelerate very quickly, but I am not sure how they would work on steep hills.
The 365s are fantastic trains - anyone who got them would be very lucky. I'm sure they'd prove more reliable (and comfortable) than any new build train to replace them. The only thing they lack is air conditioning.
Agreed.
They would be ideal for the GW routes to Oxford and Newbury, in preference to the 319s that have been mooted for the line. The fleet size of forty sets would be about ideal too.
So if I've got this right.... Hayes & Harlington to Oxford/Swindon/Newbury and also the little gap between Manchester and Wigan are being wired now (well, I mean schemes fully approved, and commencing shortly?) and at present those routes are planned to receive class 319s displaced by the new Thameslink units?
That's agreed there. If the units are to be displaced by the Thameslink stock replacement, all they need to do is make the fleet size big enough. Ideally, also make it big enough to replace the old 313s
I think 313 replacement ought to be tied to 507/508 replacement (which ought to be in the next five years)
The Morgate - Welwyn/Hertford services are not part of Thameslink, but will become an even poorer relation once the new TL stock starts running alongside. By that time, the 313s will be 40 years old. Given that the journey time for these services is in the region of forty minutes, would a batch of 378s not be suitable? Assuming there are no gauging issues in the Moorgate tunnel then they would offer a step change from the 313s, which could be retired.
At one point, FCC had suggested/assumed that class 319s would go to operate these services, though as platforms are 6 coaches long they would need to loose the toilet coach.