What would you include in a 10-15 year franchise specification starting towards the end of 2013?
Let's also assume North TPE electrification gets the go ahead and the 319s are split between the North West and Thames Valley.
I'd include:
* Full class 319 refurbishment. To include 2+2 seating, fold down tables, air conditioning and full DDA compliance.
* Either 153s to be reformed as 155s or 155s to be spilt and 153s and 155s to form additional centre carriages of 156s. Refurbishment to same standard as 319s, by the end of 2019.
* Ex-FNW 150s to be made fully DDA compliant by the end of 2019. Ex-ATN and LM 150s to be withdrawn in 2019 together with any Pacers not replaced directly/indirectly by EMUs.
* Any issues with DDA compliance on units not already mentioned (excluding Pacers) to be addressed.
* Order of new 6 car EMUs for North TPE to include intercity style interiors.
* Additional EMUs for newly electrified routes - may be in the form of a new order or receiving a cascade of additional 319/321/321s to be worked out in conjuction with other franchise specs. A new order may also replace an existing class e.g. 321s or 323s allowing a cascade of those units to another operator.
* New order of 3 car commuter DMUs in service by 2019 as Pacer/non-DDA compliant 150 replacement and for extra capacity. (Note: some will be replaced by EMUs or DMUs cascaded down as a result of electrification.)
* Follow on order to replace ex-FNW 150s post-2019.
* All stations to which at least 250,000 journeys are made per annum to have both LED platform displays and PA announcements. Ones with under 250,000 journeys to have remote PA announcements.
* All stations with at least 250,000 journeys per annum to have either ticket office with at least 2 members of staff at peak times or to have ticket office with 1 member of staff plus TVM(s).
Let's also assume North TPE electrification gets the go ahead and the 319s are split between the North West and Thames Valley.
I'd include:
* Full class 319 refurbishment. To include 2+2 seating, fold down tables, air conditioning and full DDA compliance.
* Either 153s to be reformed as 155s or 155s to be spilt and 153s and 155s to form additional centre carriages of 156s. Refurbishment to same standard as 319s, by the end of 2019.
* Ex-FNW 150s to be made fully DDA compliant by the end of 2019. Ex-ATN and LM 150s to be withdrawn in 2019 together with any Pacers not replaced directly/indirectly by EMUs.
* Any issues with DDA compliance on units not already mentioned (excluding Pacers) to be addressed.
* Order of new 6 car EMUs for North TPE to include intercity style interiors.
* Additional EMUs for newly electrified routes - may be in the form of a new order or receiving a cascade of additional 319/321/321s to be worked out in conjuction with other franchise specs. A new order may also replace an existing class e.g. 321s or 323s allowing a cascade of those units to another operator.
* New order of 3 car commuter DMUs in service by 2019 as Pacer/non-DDA compliant 150 replacement and for extra capacity. (Note: some will be replaced by EMUs or DMUs cascaded down as a result of electrification.)
* Follow on order to replace ex-FNW 150s post-2019.
* All stations to which at least 250,000 journeys are made per annum to have both LED platform displays and PA announcements. Ones with under 250,000 journeys to have remote PA announcements.
* All stations with at least 250,000 journeys per annum to have either ticket office with at least 2 members of staff at peak times or to have ticket office with 1 member of staff plus TVM(s).