The current South to East curve at Carstairs was originally the Dolphinton Branch I believe.
one of the reasons I've heard suggested for Queens Curve being abandoned was that the dolphington branch was built and cut through the formation. That would certainly suggest a branch which joined facing Carstairs with the primary service towards Carstairs or Glasgow.

The whole area seems to be weirdly buried in railway folklore though, where we usually have a fairly concrete idea of what lines went where in other locations
 

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
After submitting an FOI, I can confirm that the scheduled EIS (entry into service)
for the new overhead equipment between Haymarket and Dalmeny will be March 2027.

It does baffle me that it'll take seven months between completion of wiring and EIS...
 
Last edited:

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,595
After submitting an FOI, I can confirm that the scheduled EIS (entry into service)
for the new overhead equipment between Haymarket and Dalmeny will be March 2027.

It does baffle me that it'll take seven months between completion of wiring and EIS...
Thanks - is that FoI available anywhere online?
 
Joined
29 Nov 2018
Messages
780
one of the reasons I've heard suggested for Queens Curve being abandoned was that the dolphington branch was built and cut through the formation. That would certainly suggest a branch which joined facing Carstairs with the primary service towards Carstairs or Glasgow.

The whole area seems to be weirdly buried in railway folklore though, where we usually have a fairly concrete idea of what lines went where in other locations
Now you're just doing it on purpose:s!

The disused railway line near Carstairs is Dolphinton, with no G. Its Caley and North British stations mentioned by @ian1944 are shown on the old map supplied by @najaB. There is no electrification here. In fact there's no railway here either.

However Haymarket to Dalmeny electrification work has reached Dolphington, with a G. I'll attach a copy of the relevant map showing the bridge and spelling convention for this area.

Unfortunately Network Rail's signs (both pre- and post-electrification) call overbridge 24 at Dalmeny "Dolphinton" like the place near Carstairs instead of Dolphington which is where the bridge is located. I'll attach a photo of the sign below.

I'm pretty sure this is a straightforward mistake on Network Rail's part due to the name similarity and the unusual railway history of the place near Carstairs.
 

Attachments

  • 1779396422499.png
    1779396422499.png
    337.8 KB · Views: 125
  • 1779396754155.png
    1779396754155.png
    543.3 KB · Views: 122
  • 1779397033284.png
    1779397033284.png
    1.7 MB · Views: 121

ajwffc

Member
Joined
30 Sep 2023
Messages
72
Location
Scotland
After submitting an FOI, I can confirm that the scheduled EIS (entry into service)
for the new overhead equipment between Haymarket and Dalmeny will be March 2027.

It does baffle me that it'll take seven months between completion of wiring and EIS...
probably testing and other work to the power supply
 
Joined
5 Aug 2015
Messages
911
Location
Norfolk
They also need time to actually correct any issues identified in testing, there also really is no rush because LNER don't strictly need to use the wires and Scotrail's bimodes are not even vector art. Reminds me of York-Church Fenton wiring.
 

och aye

Member
Joined
21 Jan 2012
Messages
1,014
Now you're just doing it on purpose:s!

The disused railway line near Carstairs is Dolphinton, with no G. Its Caley and North British stations mentioned by @ian1944 are shown on the old map supplied by @najaB. There is no electrification here. In fact there's no railway here either.

However Haymarket to Dalmeny electrification work has reached Dolphington, with a G. I'll attach a copy of the relevant map showing the bridge and spelling convention for this area.

Unfortunately Network Rail's signs (both pre- and post-electrification) call overbridge 24 at Dalmeny "Dolphinton" like the place near Carstairs instead of Dolphington which is where the bridge is located. I'll attach a photo of the sign below.

I'm pretty sure this is a straightforward mistake on Network Rail's part due to the name similarity and the unusual railway history of the place near Carstairs.
Have you contacted Network Rail? A simply tweet to @networkrailscot with your images may be all that's required to have them correct it.
 

ajwffc

Member
Joined
30 Sep 2023
Messages
72
Location
Scotland
Is it a long enough stretch of track that timetable adjustments would be required?
The E&G ran with the old 158/170 timings for a while after the wires went up.
Have you contacted Network Rail? A simply tweet to @networkrailscot with your images may be all that's required to have them correct it.
I doubt it would get changed as there is a lot of documents that would need to be changed.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
This is the latest update of progress I’ve seen in the past few weeks, showing Edinburgh Gateway now having both lines with partially installed wires.
 

Attachments

  • IMG_2397.jpeg
    IMG_2397.jpeg
    318.2 KB · Views: 203

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
Edinburgh Gateway is now fully wired, and a new TTC mast has been installed next to the bridge at South Gyle station on the car park side.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
South Gyle now has some wires in place on the up line, however none have been registered yet.
 

Attachments

  • IMG_2830.jpeg
    3.4 MB · Views: 126
  • IMG_2833.jpeg
    5.4 MB · Views: 97

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
The short section of masts on both lines next to the northern terminus of the section near Dolphinton now have SPS, but I'm unsure if they have wires yet. Just passed on the X59 to Edinburgh so wasn’t the best view.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
The up line at South Gyle is now registered, and the down line has been installed but not registered yet.
 

Attachments

  • IMG_3052.jpeg
    IMG_3052.jpeg
    563.8 KB · Views: 141

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
It looks like the overhead lines at South Gyle and towards Edinburgh are now registered, as shown in this photo by John Webb on Flickr:

 

Attachments

  • Screenshot 2026-08-09 155601.png
    Screenshot 2026-08-09 155601.png
    6 MB · Views: 144

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
As of the 5th of September, all works relating to the installation and registration of the Haymarket West Jn - Dalmeny electrification have been completed.

All that awaits now in the next six months is the testing and commissioning of the overhead line equipment into public service.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,009
Location
Surrey
As of the 5th of September, all works relating to the installation and registration of the Haymarket West Jn - Dalmeny electrification have been completed.

All that awaits now in the next six months is the testing and commissioning of the overhead line equipment into public service.
Will LNER take advantage for a few miles given its drivers on this leg are probably trained on diesel only operation?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,817
Is that the case? Do no LNER drivers cover both north and south of Edinburgh?

AIUI Edinburgh drivers go both ways if you’ll pardon the expression. Newcastle used to do the Highlander and Lodge but I seem to remember that changing in December (could be wrong).
 