• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

TfW class 398 Stadler Citylink tram trains

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AdamWW

Established Member
Joined
6 Nov 2012
Messages
5,954
It's not a new design though, is it? Stadler boast on the website page for the Citylink that they have sold over 500 examples.

It would be interesting to know just how similar it is to previous models. They certainly look quite different to the Sheffield variant.
 

Cardiff123

Established Member
Joined
10 Mar 2013
Messages
1,652
Location
South Wales
I don't think any of the relentless criticism towards that forum member - who was ultimately bullied off the forum - was valid. As far as I can see, nothing that VR494 posted here has been shown to be untrue. In fact a great deal of it has been shown to be correct.
It was some of the more outlandish claims that were being made that made their contributions unbelievable - eg. That a shower screen and a bucket were being kept on board to use as a makeshift toilet if a 398 got stranded.
Or that the entire 398 fleet should be abandoned, along with the depot at Taff's Well, and a new fleet should be ordered, or the 150s be kept going indefinitely instead. TfW and Welsh Govt were never going to abandon a multi million pound fleet of brand new vehicles and a brand new depot and control centre, that would've also involved handing hundreds of millions of pounds back to the EU.

Many of their claims were believable, but others just came across as a disgruntled, now retired employee who was opposed to any change on the Valleys. And the 398s are the biggest change on the Valleys in generations.
 

positron

Member
Joined
18 Oct 2022
Messages
708
Location
Cardiff
It's not a new design though, is it? Stadler boast on the website page for the Citylink that they have sold over 500 examples.
It is though, the UK system makes these quite unlike any before except maybe the 399s but even then I suspect there's quite a lot of differences.
 

Northerngirl

Member
Joined
16 Aug 2023
Messages
510
Location
Wirral
It is though, the UK system makes these quite unlike any before except maybe the 399s but even then I suspect there's quite a lot of differences.
The body is new but surely the electrics carried over from previous projects just moved around
 

bahnause

Member
Joined
30 Dec 2016
Messages
1,037
Location
bülach (switzerland)
The body is new but surely the electrics carried over from previous projects just moved around
The first Citylink was built 2003 (Vossloh) as standard electric, metre-gauge tram-trains. Very unlikley that any of the electrics or electronics will still be in the class 398. Electrical components may vary even between different production runs of otherwise identical vehicles if these are manufactured over a prolonged period.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,659
Location
Croydon
It's not a new design though, is it? Stadler boast on the website page for the Citylink that they have sold over 500 examples.
Lots of differences in how the 398s were implemented.

We must not lose sight of the fact that implementation of these 398s might not have been held up by the 398s themselves but more by the electrification not being ready sooner. It is perhaps only now that serious quantities of running are showing the teething problems.
It would be interesting to know just how similar it is to previous models. They certainly look quite different to the Sheffield variant.
There seem to be enough difference.
It was some of the more outlandish claims that were being made that made their contributions unbelievable - eg. That a shower screen and a bucket were being kept on board to use as a makeshift toilet if a 398 got stranded.
Or that the entire 398 fleet should be abandoned, along with the depot at Taff's Well, and a new fleet should be ordered, or the 150s be kept going indefinitely instead. TfW and Welsh Govt were never going to abandon a multi million pound fleet of brand new vehicles and a brand new depot and control centre, that would've also involved handing hundreds of millions of pounds back to the EU.

Many of their claims were believable, but others just came across as a disgruntled, now retired employee who was opposed to any change on the Valleys. And the 398s are the biggest change on the Valleys in generations.
Yes. The comment about toilet bucket and screen suggested to me a desire to just see the 398s in a bad light come what may OR just as likely some gossip or idle chat that got blown out of all proportion. There was to much.

I think angrily defending said person against all comments that were not all aggressive is a sign.
The first Citylink was built 2003 (Vossloh) as standard electric, metre-gauge tram-trains. Very unlikley that any of the electrics or electronics will still be in the class 398. Electrical components may vary even between different production runs of otherwise identical vehicles if these are manufactured over a prolonged period.
Indeed. 23 years have elapsed and it would be worrying if there were no differences.

I still wonder, looking back, if the hold ups were down to the pace of electrification ?.
Certainly the Bay area has only just been implemented.
We have in the meantime had 231s working the route and more recently 756s. Maybe there was some good forward planning allowing the routes to start using the electrification with the 756s version of Flirts.

Meanwhile, as I said before, we have eleven out of thirty six 398s available for service, almost one third. A fairly steady growth not unlike other fleet introductions. A few stutters at first and of course crew have to get used to them.

Compare with the 701 introduction which, maybe a year about 2 1/2 years ago looked like it would never happen. And that was with a design that was very "current" and yet introduction of this SWT version of the 710, 720 and 730 has been fraught. That has been for various reasons.

EDIT 12:17 - correction First 701 in service was 701037 on 09/01/2024. There were six introduced in the whole of that first year (12%), Then in 2025 a further 56% entered service. The 398s are already at 30% after only three months. So overall I would say progress is good right now - perhaps a bit to ambitious !.
 
Last edited:

positron

Member
Joined
18 Oct 2022
Messages
708
Location
Cardiff
398029 left the depot this morning and ran into Cardiff Central, then operated a service to Pontypridd.


I believe this is the first 398 to run in public service from Network Rail infrastructure (albeit briefly)
Interesting how has this diagram previously been running? Or have they just not been running a service from central at that time for a while.

Thats a good step to be taken though, it shows that there's some acceptance of them on network rail infrastructure beyond testing.

Did the ORR officially approve them yet?
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,370
Interesting how has this diagram previously been running? Or have they just not been running a service from central at that time for a while.

Thats a good step to be taken though, it shows that there's some acceptance of them on network rail infrastructure beyond testing.

Did the ORR officially approve them yet?
Surely they must be approved as otherwise they wouldn't be allowed to carry passengers on NR infrastructure?
 

positron

Member
Joined
18 Oct 2022
Messages
708
Location
Cardiff
Surely they must be approved as otherwise they wouldn't be allowed to carry passengers on NR infrastructure?
I'm not familiar with the specifics of the rules. Like I could see it being possible for these sorts of fridge beginning/end of service movements. Though I could also see it being an absolute requirement.
 

chargesmith

Member
Joined
14 Nov 2023
Messages
274
Location
South Wales
Interesting how has this diagram previously been running? Or have they just not been running a service from central at that time for a while.

Thats a good step to be taken though, it shows that there's some acceptance of them on network rail infrastructure beyond testing.

Did the ORR officially approve them yet?
I think it's a modification of one of the 3 diagrams for the Pontypridd - Bay service, I believe it was previously running to Cardiff Bay and then beginning the service from there but today it ran from Central instead.

It's popped up in the timetable before but it never came to fruition until today.

It's due to happen again tomorrow so could be a soft launch of sorts?
 

ic31420

Member
Joined
23 Aug 2017
Messages
399
Location
United Kingdom
It's not early days, though, is it? It's 3½ years since the first 398 was delivered to Taffs well, and 3 months since they were first used on the Bay line.

Is that not an issue in itself. We see with the 175s how much of an issue parking them up for a couple of years can be.
 

chargesmith

Member
Joined
14 Nov 2023
Messages
274
Location
South Wales
Is that not an issue in itself. We see with the 175s how much of an issue parking them up for a couple of years can be.
The 175s are now around 25 years old.

I also believe there is a difference between so-called warm and cold storage. The 398s presumably have had their condition carefully managed by TfW and Stadler while they were awaiting entry to service, I don't think this happened with the 175s after they got taken out of service with TfW.
 

Prime586

Member
Joined
26 May 2023
Messages
292
Location
Knowsley
It is though, the UK system makes these quite unlike any before except maybe the 399s but even then I suspect there's quite a lot of differences.

The first Citylink was built 2003 (Vossloh) as standard electric, metre-gauge tram-trains. Very unlikley that any of the electrics or electronics will still be in the class 398. Electrical components may vary even between different production runs of otherwise identical vehicles if these are manufactured over a prolonged period.
The traction 9same 100kph top speed) and 25kV electrical systems are probably very similar to the Class 399, which are only 10 years old. I imagine the battery hybrid system has some similarity to the Class 777/1 (and the 777s were built with the capability to add a pantograph and 25kV transformer/rectifier onto the power bus at a later date).

Stadler's whole spiel when bidding for these contracts is their modularity and capability to plug together proven subsystems they already have on the shelf to build whatever the customer wants - they aren't redesigning the wheel for each contract.
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,599
Ultimately we are still in the early days of them being used for passenger services. I really don't see how you can argue against that.

And we do see that new rolling stock tend to have issues upon their introduction, even ones heavily based on existing stock. The 810's are a good current example of that too.

Obviously that isn't good for passengers, and yes the introduction has been delayed several times amongst less than clear comms. But really what do the people whinging want? It is clear TfW are getting on with it as fast as they can now, and a third of the fleet in passenger service is pretty decent.
 

bahnause

Member
Joined
30 Dec 2016
Messages
1,037
Location
bülach (switzerland)
Stadler's whole spiel when bidding for these contracts is their modularity and capability to plug together proven subsystems they already have on the shelf to build whatever the customer wants - they aren't redesigning the wheel for each contract.
The first generation Stadler FLIRT for SBB for example were built over 15 years and have a lot of differences. Oil-cooled transformers have been replaced by dry-type transformers. Many electronic components vary depending on the year of manufacture. Often, different components are used for subsequent orders, for example in converters where the models originally used are no longer manufactured. In addition, there are also adjustments resulting from changes to the approval requirements.
 

Markdvdman

Member
Joined
14 Aug 2011
Messages
500
Location
Merthyr Tydfil / Gorslas
I was lucky to get from Central to Greyfriars Road to get the X4 to Merthyr. Utterly rammed full. Luckily accepted my weekly ticket and he did accept somebody who tapped on. Trains appear to be running now although not 100%
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,370
Anyone know which unit failed? If it was 22 again then someone needs a head wobble for sending it back out.
They could fix it, all appears good and then the fault reappears.
Not a lot they can do of that happens.
Same thing happened day in day out across the network.
 

Sterre

Member
Joined
19 Dec 2023
Messages
19
Location
Cardiff
Interestingly, I caught 024 to work this morning and overheard the driver switching at Queen Street saying that it was a good unit with no yellow lights / errors on display.
 

VR494

Member
Joined
22 Jan 2026
Messages
237
Location
United Kingdom
Well it’s been a while, I thought I’d take some time away and monitor the progress. See how they settled in etc.

And before we start, the toilet comment was not a joke, there are still plans I believe to have an emergency toilet onboard. It was voiced as a “Bucket and shower screen” by the conductor instructors. Laughing aside, the mess rooms were not impressed with it either.

I do have some information regarding today’s disruption on the TAM and it was apparently due to brake fault on 398024. The rescue unit also had the fault transferred.

One unit is able to assist providing the electrical battery supply is available, two needed for a dead unit with no brake continuity. That’s max 5mph too. Expect that to become the norm in the months ahead.

Training is progressing, however the reliability of the units is still very much under scrutiny. Daily cancellations and unit swaps are the way it’s going.

A few units have already become donors for spares, and 398001 is currently parked up apparently missing various bits waiting to be rebuilt. It is missing various parts from lights, air conditioning units and front ends. They have a parts supply issue with the manufacturer and the 398 may now be an obsolete class. They did mention an order for an additional 12, I don’t have anything further on this.

There is also an ongoing issues with the TCU or train control units, and overheating of the traction motors which is causing the loss of dynamic braking stability. There have been brake failures and one unit on training earlier this month failed in its attempt to stop at a station because of this. It ran through.

At current time, when this fault is occurring they are swapping the unit out for another, if availability is there.

The cause is apparently linked to when not under the wires the regeneration braking is dispersing the excess energy as heat into the brake resistors. Operating at higher speeds in train mode, on discontinuous electricity, is not going well. It overheats and cuts out. They ideally need to be under 25k all the time as designed. One of the fixes being proposed is to overcharge the batteries with excess heat from the brakes. This will reduce the life of the battery and possibly have other effects too!

Sadly the 4tph in the Treherbert line has now also been put back and won’t be happening in December from the 14th. Realtime trains has the updated schedule reflecting this. The units are in not fit state to accommodate the service increase, and won’t be anytime soon. They aren’t ready and there is a struggle now to cover the three on the Cardiff Bay daily.

Multiple running also won’t be happening testing has again failed. In one instance the doors on the front unit opened on the correct side and the rear on the wrong side. You can also apparently have no brakes working on the rear and only on the front set! Without a review of the coupler I can’t see how software will change that.

I know you think I’m sceptical of these, I did voice my opinion after leaving the industry and I still don’t see these things happening on the scale they planned.

It’s time they came out and told the truth, the project is in a serious state of affairs and the lack of communication from the CEO in the last couple of months only makes me think there’s something wrong behind the scenes.

The door procedure is also proving to be a disaster and cameras are unable to be used in rainy conditions or heavy sunlight due to bleaching. To get around this they are switching the units to full conductor mode at crew discretion.

And finally your favourite the air conditioning. It can only adjust marginally by a few degrees up and down over the outside air temperature. Crew have no control over it whatsoever, the windows can be opened or closed in the saloon. It’s an urban metro system design for city centre use and not that you’d get with a new modern train.

We have had a hot summer which has not helped. Like the Mk4 sets it is what it is, and the software update has not changed it.

It’s not going to change they are going to be hot in the summer and cold in the winter. It’s what they’ve bought!

Happy tram-training and make sure you make alternate arrangements if you plan to catch a CVL service anytime soon. It’s a mess.
 
Last edited:

Top