810013
Member
Not sure if this is the correct thread but it is construction related
Do we Think 015 will be repaired or 810034 is built with 015 used for spares?
Do we Think 015 will be repaired or 810034 is built with 015 used for spares?
Far far too early to be knowing what they will do.Not sure if this is the correct thread but it is construction related
Do we Think 015 will be repaired or 810034 is built with 015 used for spares?
Not sure if this is the correct thread but it is construction related
Do we Think 015 will be repaired or 810034 is built with 015 used for spares?
Modern crumple zones are designed to absorb energy. To early to say, but with production lines open it might be easier to build new body shell, than try and fix existing one. Parts could be transferred over.Not sure if this is the correct thread but it is construction related
Do we Think 015 will be repaired or 810034 is built with 015 used for spares?
EMR have recently posted an update here:I am presuming they’ll take 820015 away by lorry when the initial investigations at Bedford are done , but can this be confirmed? Also, will it return to Etches or go all the way back to Newton Aycliffe?
All vehicles are being recovered by road it seems, and I suspect they'll head to wherever the RAIB wants to hold them for now.Recovery operation
A complex recovery operation has begun to remove the damaged trains and carriages from the railway before engineers assess any damage and complete necessary repairs. The Overhead Line Equipment – the electrical wires that provide power to the electric trains – must be removed while a temporary access road and concrete foundation is constructed to support the operation of a crane.
Two 110 tonne rail-mounted Kirow Cranes will then lift the trains and carriages from the site before a road-mounted crane moves them onto a low loader – a heavy-duty, specialised trailer designed to carry extremely heavy equipment – to be transported away by road. Following this, engineers will then assess the track and make any repairs before reinstating the overhead lines and completing final safety checks ahead of reopening the railway.
810015 and the 360 will most likely go to a secure location of the RAIBs choosing.I am presuming they’ll take 820015 away by lorry when the initial investigations at Bedford are done , but can this be confirmed? Also, will it return to Etches or go all the way back to Newton Aycliffe?
Could well end up at the RAIB secure site at Farnborough Airport. Wherever it is, I'm certain that it'll be in the middle of the night with covers on.810015 and the 360 will most likely go to a secure location of the RAIBs choosing.
Unlikely to go to Etches Park or Merchant Park.
Long Marston would also be a good bet, even though it's Porterbook owned, it's a secure site with plenty of spaces to put the carriages inside a building.Could well end up at the RAIB secure site at Farnborough Airport. Wherever it is, I'm certain that it'll be in the middle of the night with covers on.
Was the TPE 802 coach repaired or replacedLong Marston would also be a good bet, even though it's Porterbook owned, it's a secure site with plenty of spaces to put the carriages inside a building.
I seem to recall the carriage from the TPe unit that detailed at Heaton depot was sent there for a period of time.
Repaired.Was the TPE 802 coach repaired or replaced
I believe they are still producing 030-033 although i could be wrong on thatIf 810015 is written off, is the production line still capable of producung a replacement, or has the factory line now irrevocably switched to 820s?
Far too early to say.Considering how new 810 is will it be repaired and if not what will happen, will EMR get a replacement new train built to replace it?
Doesn't that depend on what damage has been done? And, like a car, a consideration would be whether it is economical to carry out repairsConsidering how new 810 is will it be repaired and if not what will happen, will EMR get a replacement new train built to replace it?
No-one knows. Until EMR, Hitachi and Rock Rail have had a good look at it they won't know either. The unit may well be impounded by RAIB currently and access will be limited.Will Hitachi have to build a replacement unit for the 810 involved at Bedford, or is it likely to get repaired?
I'd expect it to get repairedWill Hitachi have to build a replacement unit for the 810 involved at Bedford, or is it likely to get repaired?
I'd expect it to get repaired
Would the majority of it not just be body work though, maybe replace the cab frame with new panels, surely not the need for a whole new driving end to be made?Possibly not the end vehicle that took the brunt of the impact, it looked clearly distorted if you look at the area above the first passenger door, I'd be surprised if that one didn't need replacing.
Would the majority of it not just be body work though, maybe replace the cab frame with new panels, surely not the need for a whole new driving end to be made?
Surely still cheaper than building a new carriage. Most of the carriage is fine, just the 5 metres or so around the rear cab. Another question, was it Cab 1 or Cab 2 that took the impact, never can remember which end is which with EMR as they change ends all the time (unlike LNER who always have first class facing London I believe)If the bodyshell has become distorted then there it will have weakened the structure of it too, I can't see it being worth repairing.
All carriages have been welded, and the final couple of carriages are in production shed getting fitted out.The 810 production line is presumably running like a slick operation now; so, financial aspects aside, it would probably be easier (and possibly quicker?) to replace rather than repair if there are concerns about the structural integrity.
The 810 production line is presumably running like a slick operation now; so, financial aspects aside, it would probably be easier (and possibly quicker?) to replace rather than repair if there are concerns about the structural integrity.
Talking of what remains of the 810 production line, I presume another set would need constructing if 002 still can’t be found?All carriages have been welded, and the final couple of carriages are in production shed getting fitted out.
In a kind of morbid way it's actually perfect timing if they do decide that one (or more) carriages need replacing and the production line is still set up assembling the final few EMR carriages
However everything depends on the insurance people and Hitachi who ultimately will decide if repair is possible or wether replacements are needed.
My source within the factory stated that 810002 was discovered to have very bad welds on several carriages and they were indeed building replied it.Talking of what remains of the 810 production line, I presume another set would need constructing if 002 still can’t be found?
Clearly the missing Danish IC4 set that ended up in Libya needs replacing by newer stock!