Not sure if this is the correct thread but it is construction related
Do we Think 015 will be repaired or 810034 is built with 015 used for spares?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

800001

Established Member
Joined
24 Oct 2015
Messages
7,303
Not sure if this is the correct thread but it is construction related
Do we Think 015 will be repaired or 810034 is built with 015 used for spares?
Far far too early to be knowing what they will do.
A full thorough assessment will need to take place, however the damage at the rear does look significant.
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,806
Not sure if this is the correct thread but it is construction related
Do we Think 015 will be repaired or 810034 is built with 015 used for spares?

Probably far too early to speculate at this point, but the LNER unit that was in a collision at Neville Hill was back in service quickly. Obviously 015's collision involves greater forces but solely going off the public images it looks to have stood up well, what looks bad is where it's meant to crumple.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Not sure if this is the correct thread but it is construction related
Do we Think 015 will be repaired or 810034 is built with 015 used for spares?
Modern crumple zones are designed to absorb energy. To early to say, but with production lines open it might be easier to build new body shell, than try and fix existing one. Parts could be transferred over.

There will be clauses in lease, regarding write off value each year. EMR would have to settle the lease for any vehicles (might be written as whole sets, rather than individual vehicles) that are destroyed during lease term, unless they replaced them.

I don't know what 810 lease actually says if unrepairable
 

dosxuk

Established Member
Joined
2 Jan 2011
Messages
2,428
The issue with crumple zones is that what looks like superficial damage to just the end panels actually is far more serious and results in the whole vehicle being written off. Once key structural members have been taken past their design loads, that's basically it for the vehicle, even if the passenger parts look mostly ok.

What would concern me here with the 810 is not the nose damage, but that the third carriage completely derailed and has made a significant sideways movement. In the case of the LNER incident, all the carriages stayed in line, so the impact forces remained along the strongest axis. With the amount of force demonstrated, I would also have concerns about vehicle twist.

We won't know for a long while, but it wouldn't surprise me in the slightest if the whole set is written off due to damage, despite visually only the rear carriage looking significantly damaged.
 

Amos390

Member
Joined
22 Jan 2025
Messages
675
Location
Nottingham
I am presuming they’ll take 810015 away by lorry when the initial investigations at Bedford are done , but can this be confirmed? Also, will it return to Etches or go all the way back to Newton Aycliffe?
 
Last edited:

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,885
I am presuming they’ll take 820015 away by lorry when the initial investigations at Bedford are done , but can this be confirmed? Also, will it return to Etches or go all the way back to Newton Aycliffe?
EMR have recently posted an update here:

Recovery operation

A complex recovery operation has begun to remove the damaged trains and carriages from the railway before engineers assess any damage and complete necessary repairs. The Overhead Line Equipment – the electrical wires that provide power to the electric trains – must be removed while a temporary access road and concrete foundation is constructed to support the operation of a crane.

Two 110 tonne rail-mounted Kirow Cranes will then lift the trains and carriages from the site before a road-mounted crane moves them onto a low loader – a heavy-duty, specialised trailer designed to carry extremely heavy equipment – to be transported away by road. Following this, engineers will then assess the track and make any repairs before reinstating the overhead lines and completing final safety checks ahead of reopening the railway.
All vehicles are being recovered by road it seems, and I suspect they'll head to wherever the RAIB wants to hold them for now.
 
Last edited by a moderator:

800001

Established Member
Joined
24 Oct 2015
Messages
7,303
I am presuming they’ll take 820015 away by lorry when the initial investigations at Bedford are done , but can this be confirmed? Also, will it return to Etches or go all the way back to Newton Aycliffe?
810015 and the 360 will most likely go to a secure location of the RAIBs choosing.
Unlikely to go to Etches Park or Merchant Park.

When LNER 800109 from the Neville Hill crash was recovered after a certain period it was taken by road (the damaged cab) to a company called Millenium Site Services at Derby for structural repairs, and only returned to to Aycliffe to be made back to its complete set and undertake some testing before being returned to passenger service.
 

adc82140

Established Member
Joined
10 May 2008
Messages
3,395
810015 and the 360 will most likely go to a secure location of the RAIBs choosing.
Unlikely to go to Etches Park or Merchant Park.
Could well end up at the RAIB secure site at Farnborough Airport. Wherever it is, I'm certain that it'll be in the middle of the night with covers on.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,303
Could well end up at the RAIB secure site at Farnborough Airport. Wherever it is, I'm certain that it'll be in the middle of the night with covers on.
Long Marston would also be a good bet, even though it's Porterbook owned, it's a secure site with plenty of spaces to put the carriages inside a building.

I seem to recall the carriage from the TPe unit that detailed at Heaton depot was sent there for a period of time.
 

31160

Established Member
Joined
18 Mar 2018
Messages
1,268
Long Marston would also be a good bet, even though it's Porterbook owned, it's a secure site with plenty of spaces to put the carriages inside a building.

I seem to recall the carriage from the TPe unit that detailed at Heaton depot was sent there for a period of time.
Was the TPE 802 coach repaired or replaced
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,657
Location
SW London
If 810015 is written off, is the production line still capable of producung a replacement, or has the factory line now irrevocably switched to 820s?
 

M60lad

Established Member
Joined
31 May 2011
Messages
1,552
Considering how new 810 is will it be repaired and if not what will happen, will EMR get a replacement new train built to replace it?
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,303
Considering how new 810 is will it be repaired and if not what will happen, will EMR get a replacement new train built to replace it?
Far too early to say.
It will need to be fully assessed by Hitachi who will have had no access to the unit, and won't for some time.
Also insurance company will get involved.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,479
Considering how new 810 is will it be repaired and if not what will happen, will EMR get a replacement new train built to replace it?
Doesn't that depend on what damage has been done? And, like a car, a consideration would be whether it is economical to carry out repairs
 

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,751
Location
St Helens, Merseyside
mods note - split from this thread

Will Hitachi have to build a replacement unit for the 810 involved at Bedford, or is it likely to get repaired?
 
Last edited by a moderator:

43096

On Moderation
Joined
23 Nov 2015
Messages
18,727
Will Hitachi have to build a replacement unit for the 810 involved at Bedford, or is it likely to get repaired?
No-one knows. Until EMR, Hitachi and Rock Rail have had a good look at it they won't know either. The unit may well be impounded by RAIB currently and access will be limited.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
I'd expect it to get repaired

Possibly not the end vehicle that took the brunt of the impact, it looked clearly distorted if you look at the area above the first passenger door, I'd be surprised if that one didn't need replacing.
 

Amos390

Member
Joined
22 Jan 2025
Messages
675
Location
Nottingham
Possibly not the end vehicle that took the brunt of the impact, it looked clearly distorted if you look at the area above the first passenger door, I'd be surprised if that one didn't need replacing.
Would the majority of it not just be body work though, maybe replace the cab frame with new panels, surely not the need for a whole new driving end to be made?
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
Would the majority of it not just be body work though, maybe replace the cab frame with new panels, surely not the need for a whole new driving end to be made?

If the bodyshell has become distorted then there it will have weakened the structure of it too, I can't see it being worth repairing.
 

Amos390

Member
Joined
22 Jan 2025
Messages
675
Location
Nottingham
If the bodyshell has become distorted then there it will have weakened the structure of it too, I can't see it being worth repairing.
Surely still cheaper than building a new carriage. Most of the carriage is fine, just the 5 metres or so around the rear cab. Another question, was it Cab 1 or Cab 2 that took the impact, never can remember which end is which with EMR as they change ends all the time (unlike LNER who always have first class facing London I believe)
 

QSK19

Member
Joined
29 Dec 2020
Messages
1,143
Location
Leicestershire
The 810 production line is presumably running like a slick operation now; so, financial aspects aside, it would probably be easier (and possibly quicker?) to replace rather than repair if there are concerns about the structural integrity.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,303
The 810 production line is presumably running like a slick operation now; so, financial aspects aside, it would probably be easier (and possibly quicker?) to replace rather than repair if there are concerns about the structural integrity.
All carriages have been welded, and the final couple of carriages are in production shed getting fitted out.
In a kind of morbid way it's actually perfect timing if they do decide that one (or more) carriages need replacing and the production line is still set up assembling the final few EMR carriages

However everything depends on the insurance people and Hitachi who ultimately will decide if repair is possible or wether replacements are needed.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
The 810 production line is presumably running like a slick operation now; so, financial aspects aside, it would probably be easier (and possibly quicker?) to replace rather than repair if there are concerns about the structural integrity.

That's my thoughts on it, they could possibly reuse some undamaged components from the original vehicle, seats for example.
 

Amos390

Member
Joined
22 Jan 2025
Messages
675
Location
Nottingham
The other question is if it were to be repaired, where would that be done. Could it be done in Etches (Like how 810006 had its nose cone replaced or how a 222 had its whole front cab pan swapped out) or would it be a job for the factory. At that point then you can consider is it easier to repair or rebuild, if it can be done at Etches probably repair, if it’s got to go back to the factory anyways, why bother and just rebuild it.
 

QSK19

Member
Joined
29 Dec 2020
Messages
1,143
Location
Leicestershire
All carriages have been welded, and the final couple of carriages are in production shed getting fitted out.
In a kind of morbid way it's actually perfect timing if they do decide that one (or more) carriages need replacing and the production line is still set up assembling the final few EMR carriages

However everything depends on the insurance people and Hitachi who ultimately will decide if repair is possible or wether replacements are needed.
Talking of what remains of the 810 production line, I presume another set would need constructing if 002 still can’t be found?

Clearly the missing Danish IC4 set that ended up in Libya needs replacing by newer stock!
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,303
Talking of what remains of the 810 production line, I presume another set would need constructing if 002 still can’t be found?

Clearly the missing Danish IC4 set that ended up in Libya needs replacing by newer stock!
My source within the factory stated that 810002 was discovered to have very bad welds on several carriages and they were indeed building replied it.

How true that is I do not know.

But no one will publicly say where the original 002 is, whether Italy or UK.
 