A very sad day for the railway. Thoughts go out to everyone involved in the incident and to everyone at EMR.
With respect, both of those things cannot be simultaneously true - either of them (or both) must have become an issue at some stage before ‘the point of collision’ - but hopefully of course the investigation will clarify.Excellent point. Even with any camera footage, the worst outcome I can think of for the investigation is if all the data is reviewed and shows no signalling irregularities and the train being controlled appropriately to the conditions, up to the point of collision. Under those circumstances the only person who could explain the incident would be the driver themselves.
Without going into too much detail, and I'm sure more info will become available soon about this, this won't be a problem and there will be good evidence here.Sadly, this will also make it harder to find out what caused this accident, as the driver of the moving train would otherwise have been a vital witness to the state of the signals and the behaviour of the train.
A train driver has died and 89 people have been injured after two trains collided in the Bedford area, with emergency services working into the night.
Eddie Dempsey, general secretary of the RMT union, said: “We are devastated to learn that a train driver and former RMT rep has tragically died as a result of today’s crash between Luton and Bedford. The thoughts of RMT are with their family, friends, colleagues and the ASLEF trade union at this awful time.”
While the circumstances remain unclear, the scale and nature of the crash, involving new trains on the upgraded Midland mainline, will be a deep shock for the rail industry.
It is the first fatal collision between two passenger trains on a British mainline this century, with what appears in early reports to involve the highest number of serious injuries in any UK rail accident in two decades.
Accident investigators will be examining why one train had halted and the other failed to stop, given the safety systems put in place in the wake of a series of crashes in the late 1990s and early 2000s.
RIP to one of our colleagues on this dark day. HeartbreakingThe Guardian confirming it is one of the drivers who has sadly died, in the first fatal collision between two trains on a Mainline in this century. The RMT have issued a statement. https://www.theguardian.com/uk-news/2026/jun/19/two-trains-collide-bedford
Officers were called to a collision between two East Midlands Railway trains on the railway line in Elstow at around 5.15pm yesterday (19 June).
Tragically, one person was pronounced dead at the scene. He is the driver of one of the trains involved and his family have been informed. Our thoughts are with his loved ones and with our colleagues at East Midlands Trains.
33 people were taken to hospital with 11 of those in a serious condition. 56 other people were treated for injuries.
We are being supported by colleagues from Bedfordshire Police, the local Fire and Rescue and Ambulance Services. We are also receiving invaluable support from colleagues in the National Police Air Service, Network Rail, East Midlands Railway and the local authority.
We know how concerning this incident will be and can assure people that officers will do everything we they can to establish.
We are working with Network Rail and East Midlands Railway colleagues to keep disruption to a minimum as much as we possibly can, and we are grateful for people’s patience.
I believe the ATP on the GWML is still being used by the class 80Xs.It should be noted that the now obsolete GWML ATP system is far easier to overlay on an existing signalling system than TPWS is for plain line signals like automatic signals.
Railway Emergency Calls are not triggered automatically in any circumstancesI believe the ATP on the GWML is still being used by the class 80Xs.
On another note. Signallers, when a train SPADs a signal is it automatically sent a GSMR Emergency stop message or is this sent manually by the signaller to the train concerned?
In many locations there’s little to no indication a SPAD has even taken place. Modern VDU units have SPAD alarms, or TC occupation alarms, but I’ve had a SPAR before due to a TPWS fault (signal reverted), and there was no indication on the panel at all. First I knew of it was the driver calling me up as I’d been dealing with an issue at the other end of the panelI believe the ATP on the GWML is still being used by the class 80Xs.
On another note. Signallers, when a train SPADs a signal is it automatically sent a GSMR Emergency stop message or is this sent manually by the signaller to the train concerned?
Wow thank you for the insight I did not know that. I had assumed all SPADs (at least on major routes) were picked up almost instantly by the signaller with a plethora of bells and whistles as I witnessed many years ago on a visit to Liverpool Street IECC.In many locations there’s little to no indication a SPAD has even taken place. Modern VDU units have SPAD alarms, or TC occupation alarms, but I’ve had a SPAR before due to a TPWS fault (signal reverted), and there was no indication on the panel at all. First I knew of it was the driver calling me up as I’d been dealing with an issue at the other end of the panel
Yes, let's not go into any unanswered questions right now.So it's likely that the 360 passed a signal at danger, right? An IET doesn't stop on a dime so the signal protecting it should have been red for some time, and the one before it at caution. Anyone have an idea of how up the line the 810 was from the last signal?
The track layout is such that the 360 saw the caution? At what speed would a driver normally proceed at on that route at that time? The 360 clearly was far below line speed (damage suggests 20-30 mph relative impact speeds; I assume the 810 was stationary), but I haven't read much eye witnesses talk of the train being under heavy braking (unless I've missed it).
Obviously such an event like this, which should never happen, raises many questions. Those are mine right now. (And yes I will wait for the RAIB report, I've been reading the Cambrian line crash report this week.)
Some context on the events at Elstow/Bedford this evening. There is a lot you can tell from train describer data on @OpenTrainTimes , however there is a lot of information that you cannot determine. The purple trace is the Class 360's movements, the green is the 810's.

(and if anyone is wondering, this information has been confirmed as correct by multiple people in the industry)From the signalling replay I've seen on an internal system (Berth Maps), the 360 was approaching a red at WH356, which stepped up on approach to a single yellow; WH154 was held at danger as the section ahead was occupied by the 810 and WH154 was passed at danger.
(And yes, if anyone is wondering, the statement by bengley correcting Nigel Harris is correct, and confirmed by multiple sources)@railnigel Hi Nigel. You seemed to suggest that TPWS stops trains passing red signals on Sky News just now. Just to make you aware that the signal protecting the EMR 810 (the front train) is not fitted with TPWS as it's an automatic signal (most of which are not fitted).
Yes, the GWML ATP is still operational, both the track mounted and track side equipment and the class 80X trains. I use the term obsolete because it's not realistic to fit it anywhere else (the technology is out of date and it would have to be re-engineered using modern semiconductor parts), the better solution is to fit ETCS/ERTMS.I believe the ATP on the GWML is still being used by the class 80Xs.
SPAD alarm equipment is a relativity new thing. Unless there has been a determination of a requirement to provide it because a signal has been identified as high risk, there will be no such equipment or systems fitted to conventional interlocking systems (relay / route relay / geographical etc.).On another note. Signallers, when a train SPADs a signal is it automatically sent a GSMR Emergency stop message or is this sent manually by the signaller to the train concerned?
So it's likely that the 360 passed a signal at danger, right? An IET doesn't stop on a dime so the signal protecting it should have been red for some time, and the one before it at caution. Anyone have an idea of how up the line the 810 was from the last signal?
The track layout is such that the 360 saw the caution? At what speed would a driver normally proceed at on that route at that time? The 360 clearly was far below line speed (damage suggests 20-30 mph relative impact speeds; I assume the 810 was stationary), but I haven't read much eye witnesses talk of the train being under heavy braking (unless I've missed it).
Obviously such an event like this, which should never happen, raises many questions. Those are mine right now. (And yes I will wait for the RAIB report, I've been reading the Cambrian line crash report this week.)
So it's likely that the 360 passed a signal at danger, right?
An IET doesn't stop on a dime so the signal protecting it should have been red for some time, and the one before it at caution. Anyone have an idea of how up the line the 810 was from the last signal?
The track layout is such that the 360 saw the caution? At what speed would a driver normally proceed at on that route at that time? The 360 clearly was far below line speed (damage suggests 20-30 mph relative impact speeds; I assume the 810 was stationary), but I haven't read much eye witnesses talk of the train being under heavy braking (unless I've missed it).
WH356 with junction indicator position 4 will have some form of approach control on it given speed differential is >20mph so I wouldn't be surprised to see this open up another can of worms about how junction signalling operates in the UK and its impact on train handling.From the signalling replay I've seen on an internal system (Berth Maps), the 360 was approaching a red at WH356, which stepped up on approach to a single yellow; WH154 was held at danger as the section ahead was occupied by the 810 and WH154 was passed at danger.
A few drivers have said WH154 is a signal that 'normally' clears pretty quickly, but I'm not going to speculate.
The amount of time the signal was at red is irrelevant - the signal won't go back to red because the 810 stopped, it goes to red when the 810 passes it and only steps up through the aspects as the train progresses along the line.An IET doesn't stop on a dime so the signal protecting it should have been red for some time
I'd far rather be on a Hitachi than a Voyager, and rather be on a Voyager than a HST in any sort of collision.The other thing I find worrying is how the Hitachi trains react to a shunt - the low speed one at Neville Hill caused that one to derail and this seems to have done the same, but to a larger extent (obviously with the larger forces involved) and as has been mentioned by someone earlier in the thread, it was just lucky nothing was coming the other way as the derailed 810 coach could have been fowling another line.
I know it’s hard to say for sure but would, for example a 222 or HST have reacted differently and more likely stayed on the track?
The data recorder definitely hasI'm assuming that both the data recorder and forward facing camera from the 360 have been downloaded overnight and the information is available to the correct people, that information will give the facts of the situation and negate the need for any speculation
If Berth Maps was showing a single yellow, then unless it has access to real-time data logging either trackside or from the interlocking, it's inferring what it expects the signal aspect to be.From the signalling replay I've seen on an internal system (Berth Maps), the 360 was approaching a red at WH356, which stepped up on approach to a single yellow; WH154 was held at danger as the section ahead was occupied by the 810 and WH154 was passed at danger.
Has it been absolutely confirmed that 154 was displaying a Red? Obviously it should have been, but note on the OTT map there is no aspect information.From the signalling replay I've seen on an internal system (Berth Maps), the 360 was approaching a red at WH356, which stepped up on approach to a single yellow; WH154 was held at danger as the section ahead was occupied by the 810 and WH154 was passed at danger.
A few drivers have said WH154 is a signal that 'normally' clears pretty quickly, but I'm not going to speculate.
Correct, but the longer it takes to produce a preliminary or interim statement, speculation will continue (on other media and forums, if not this heavily moderated forum).I'm assuming that both the data recorder and forward facing camera from the 360 have been downloaded overnight and the information is available to the correct people, that information will give the facts of the situation and negate the need for any speculation
I understand that this has not yet been confirmed.Has it been absolutely confirmed that 154 was displaying a Red? Obviously it should have been, but note on the OTT map there is no aspect information.
RAIB after more recent incidents have been fairly quick recently with a shortform overview of what they've found and intended course of their investigation as they are mindful of the wider social environment in todays world.Correct, but the longer it takes to produce a preliminary or interim statement, speculation will continue (on other media and forums, if not this heavily moderated forum).
These days with rapid information dispersal (and lot of it unverified facts), there is a trade off time wise between stating not possible scenarios and investigating further