My view is that HS2 is an exercise in how not to build a railway,
it's wrong on every level, the entire route should have been purchased and planned from day one, before a single bit of earth dug,
It should have included a chord line linking it with HS1, possibly with an interchange station, so that passengers could change, if necessary, between transcontinental services and domestic, so that some services can run without having to stop at a London terminus,
The line should have been a high-speed route between England and Scotland, and depending on Route taken, if east coast, direct to Scotland, If it instead used a Westerly route, had a branch to Cardiff, could have linked the Wesh capital also,
My preferred route would have been a route across the Chilterns, then westward, along the west side of the UK, a HS3 line going to Cardiff, whilst the HS2 ran up towards the Scottish border then into Edinburgh, and Glasgow.
I don't know much about the landmass, how much would need to be tunnelled, of where the main centres of population are en- route but apart from key places enroute, does it really need to call anywhere other than the main destinations that are not already covered by the UK rail network?