JasonL
Member
Maybe it's to do with the fact of how Andy Burnham grew up and was educated in Newton-le-Willows. I know it sounds biased but still it's an opinion or suggestion.Not very nice of you to say due to a difference of opinion. Constructive criticism is welcome. Here is the thrust of my argument. The 360 will be run under a permit as the Liverpool City Region won't take it on come October so Arriva to keep a foothold in Manchester will move it and run it from their Runcorn depot. The permit could be refused and the bee network take over the route and run it according to it's standards as it is a key corridor and is the only route that runs currently between Abram and Golborne. This is similar to what was done with the x5 from warrington to the airport which was axed due to a disagreement in funding when franchising was new. Two new routes were then introduced. One from Altrincham to the airport and one from Altrincham to Lymm. I disagreed with this but that's what transpired and should happen here with the 360.
What is clueless is creating a new link when there is enough service provision within Merseyside between Newton and St Helens making the creation of a new route outside of Greater Manchester redundant. With my proposal above, the 360 would be improved and the neighboring authority could improve services at Newton station to allow for onward connections. There is only one way that the new route from Newton to St Helens could be competitive is by bypassing Earlestown alltogether. Any other route, such as following the 34 or the 20 down vista road towards haydock will cause unnecessary overlaps with existing routes. My takes on things is based on my observations and intricate knowledge of passenger flows. What needs to be answered is why this link is more important than improving the frequencies on routes in in the 10 boroughs which are two hourly at certain times.
