Closure of Bransty Tunnel (near Whitehaven) expected until further notice

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,362
Location
Yorks
It probably isn't. It'll be hugely expensive and for very small benefit. I suspect it'll make the formerly bi-annual rebuild of the Conwy Valley (not been necessary since those rocks were dumped there to protect it) look cheap.

Compared to many road schemes I'm sure it won't be that much. Well worth it to keep the railway service running.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,005
Location
Up the creek
At the end of January the Whitehaven MP said in his column in the local papers that an announcement on the work required to open Bransty Tunnel would come in the coming weeks. Since then I can find nothing. (In case anyone is going to have a go at the MP, the original column was of a much higher standard, more realistic and properly considered than the usual waffle that MPs put out.)
 

Ridgeblog

Member
Joined
20 Apr 2021
Messages
63
Location
Welling
Did they maybe get stuck on who they will allocate the whole project and be put in charge of due to lack of interest and/or funding?
 

JModulo

Member
Joined
17 Nov 2013
Messages
588
Location
67A
At the end of January the Whitehaven MP said in his column in the local papers that an announcement on the work required to open Bransty Tunnel would come in the coming weeks. Since then I can find nothing. (In case anyone is going to have a go at the MP, the original column was of a much higher standard, more realistic and properly considered than the usual waffle that MPs put out.)
Was that per chance from the same MP who pledged to have it open last year, and then again this year (unlikely).
 

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,511
Did they maybe get stuck on who they will allocate the whole project and be put in charge of due to lack of interest and/or funding?
Id heard something similar in that a firm was appointed & then withdrew for whatever reason.
 
Joined
3 Mar 2020
Messages
673
Location
Furness
I read somewhere in one of the magazine last month said that the EA want the iron ore brown sludge sorting out so the railways hands are tied if there was a plan in place but doesn't fit the specification or timescale of the EA.
 

thenorthern

Established Member
Joined
27 May 2013
Messages
4,714
Was that per chance from the same MP who pledged to have it open last year, and then again this year (unlikely).

He must be annoyed as Whitehaven since 2017 has been a marginal seat. Every day the tunnel is closed he loses more votes.
 

Straus

Member
Joined
20 Jun 2025
Messages
116
Location
Manchester
I don't think the MP has much sway here to be honest, they're obviously important in discussions but I don't think they'll alter the direction of travel at all
 

ChilliSauce

On Moderation
Joined
28 Oct 2025
Messages
328
That's Rail issue 1058, I think - I read it a couple of days ago.
What is annoying is the failure of Northern to run the same level of service between Barrow and Corkicle that existed prior to the tunnel closure.

This failure does nothing for retention of passenger numbers between say Millom and Barrow.

At this rate by the time the tunnel is fixed there will be no great passengers numbers left to use it or other sections of the Cumbrian coast line as most will of found other means of transport.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,534
Location
"Marston Vale mafia"
What is annoying is the failure of Northern to run the same level of service between Barrow and Corkicle that existed prior to the tunnel closure.

This failure does nothing for retention of passenger numbers between say Millom and Barrow.

At this rate by the time the tunnel is fixed there will be no great passengers numbers left to use it or other sections of the Cumbrian coast line as most will of found other means of transport.

I doubt it will make much difference to the one man and his dog and bicycle in the middle to be honest.

I suspect the reason is that they require more units/crews to operate it this way.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,362
Location
Yorks
I doubt it will make much difference to the one man and his dog and bicycle in the middle to be honest.

I suspect the reason is that they require more units/crews to operate it this way.

It was always well used when I've been on it (admittedly this was before the tunnel problems. Not sure what effect this is all having).
 
Joined
3 Mar 2020
Messages
673
Location
Furness
I doubt it will make much difference to the one man and his dog and bicycle in the middle to be honest.

I suspect the reason is that they require more units/crews to operate it this way.
On at least one or two occasions last month the timetabled service went to Corkickle in service but came back to Barrow ECS. In order to maintain some semblance of a service instead of binning the whole lot. So it must be one guard works out and another back.

The Transport Trust are filling in with RRBs on some occasions when this happens.

Think they are duty bound to get folks home if the last train is binned. So that's possibly why this has happened.
 
Joined
9 Dec 2012
Messages
838
What is annoying is the failure of Northern to run the same level of service between Barrow and Corkicle that existed prior to the tunnel closure.

This failure does nothing for retention of passenger numbers between say Millom and Barrow.

At this rate by the time the tunnel is fixed there will be no great passengers numbers left to use it or other sections of the Cumbrian coast line as most will of found other means of transport.
Back in the 90s a lot of the trains only went as far as Millom whether they started from Barrow or Lancaster (pacers or 153's) and the timetable was nearly half what it meant to be now. You now have a 9.26 from Millom.to Barrow which continues to Lancaster then nothing until nearly midday!
 

StoneRoad

Member
Joined
6 Jan 2010
Messages
485
Location
Haltwhistle
It was always well used when I've been on it (admittedly this was before the tunnel problems. Not sure what effect this is all having).

The few trips I've made since the tunnel closure have been about the same loadings as prior.
How busy depends on the time of day - and, as you know, some traffic is heavily directional at certain times ...
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,362
Location
Yorks
The few trips I've made since the tunnel closure have been about the same loadings as prior.
How busy depends on the time of day - and, as you know, some traffic is heavily directional at certain times ...

Sounds promising, in terms of demand holding up.

Thinking of the coast geographically, I find it hard to imagine any meaningful justification for permanent severance.
 

StoneRoad

Member
Joined
6 Jan 2010
Messages
485
Location
Haltwhistle
FYI

Rail 1058 [15April2026] has piece on page 17 ---

Network Rail claim to have a solution designed, but are now waiting for a permit from the Environment Agency because of the "iron Ochre" from historic mine workings ...

The estimated £49 million cost can only increase the longer it takes to do the work !
 
Last edited by a moderator:

37069

Member
Joined
11 Jun 2025
Messages
258
Location
Cumbria
My hope is that someone (the EA ideally) is actually interested in finding out where this iron ochre is actually coming from (so that it can be dealt with permanently), rather than just managed for now.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,534
Location
"Marston Vale mafia"
Prohibitive cost and very very little income

Also probably operationally easier to run the top bit using 15x from the Newcastle side and the bottom bit using 195s from Barrow if it was permanent.

However indications at the moment do seem to be that it will get fixed, it will just take a while as it is major work.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,362
Location
Yorks
FYI

Rail 1058 [15April2026] has piece on page 17 ---

Network Rail claim to have a solution designed, but are now waiting for a permit from the Environment Agency because of the "iron Ochre" from historic mine workings ...

The estimated £49 million cost can only increase the longer it takes to do the work !

This would be a case where central Government needs to lean on the EA to get a permit provided ASAP.

== Doublepost prevention - post automatically merged: ==

Also probably operationally easier to run the top bit using 15x from the Newcastle side and the bottom bit using 195s from Barrow if it was permanent.

Chopping railways for operational convenience would set a very poor precedent.
 

185143

Established Member
Joined
3 Mar 2013
Messages
5,360
This would be a case where central Government needs to lean on the EA to get a permit provided ASAP.

== Doublepost prevention - post automatically merged: ==



Chopping railways for operational convenience would set a very poor precedent.
Understatement of the millennium!
 

35B

Established Member
Joined
19 Dec 2011
Messages
5,485
This would be a case where central Government needs to lean on the EA to get a permit provided ASAP.
I suspect the legislation puts the power in the hands of the EA, and they have a number of legal obligations to check before they can grant the permit - the days of "because the minister said so" are waning.
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,503
Location
DTOS A or B
Strange question to ask, but given its been closed for a long time, when/if it reopens, will crews have to relearn?
It depends on a multitude of factors.
Do crews taxi across to the other side, to operate at the other end. And if so how often is this done once a week, once every two weeks.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,427
Location
Somerset
I suspect the legislation puts the power in the hands of the EA, and they have a number of legal obligations to check before they can grant the permit - the days of "because the minister said so" are waning.
Indeed - we should be thankful that no one in our government can rule by presidential decree (at least not officially).
 

185143

Established Member
Joined
3 Mar 2013
Messages
5,360
It depends on a multitude of factors.
Do crews taxi across to the other side, to operate at the other end. And if so how often is this done once a week, once every two weeks.
Surely once it's been the specific period, which I believe is generally 6 months, crew will have to re-sign the route.

Even if they've had taxis to the other side, that won't cover them for the tunnel.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,362
Location
Yorks
I suspect the legislation puts the power in the hands of the EA, and they have a number of legal obligations to check before they can grant the permit - the days of "because the minister said so" are waning.

One would have thought that it would be for the EA to sort out its leaky water problem, rather than holding up the travelling public.
 

35B

Established Member
Joined
19 Dec 2011
Messages
5,485
One would have thought that it would be for the EA to sort out its leaky water problem, rather than holding up the travelling public.
The EA have a number of legal duties, none of which concern the ability of the travelling public to go about their business. And, bluntly, where this tunnel is concerned, I suspect those duties are of greater public interest than the disrupted journeys.
 

Top