Because it would need significant ongoing subsidy, and would have been the only one of the big privatisations where that was the case.
Which was how it turned out anyway.
Realistically, a service requiring subsidy was still going to need subsidy somewhere along the line privatised or not. You'd have thought the Government of the time would have worked that out.
But then these were the same geniuses that brought us water privatisation.
== Doublepost prevention - post automatically merged: ==
Running rights did exist but they were the exception rather than the rule as in most the time rail companies would have their own seprate lines, sometimes in duplicate with other lines to avoid having to use another operator's line.
Yes, but the concept would still be fine for today's cross boundary routes.
Last edited: