Xmas Day and Boxing Day only.Does anyone the details of the Christmas closure? Or point me to a link?
Xmas Day and Boxing Day only.Does anyone the details of the Christmas closure? Or point me to a link?
Thanks. That's helpful for meXmas Day and Boxing Day only.
Because if you remove road capacity the traffic magically disappears.But that has been discussed in previous posts and locals are saying its a small inconvenience. Repeating it doesn't make it true.
Actually it does, as least in part. The reverse of if you build a road it not only eases current traffic but attracts new journeys too. So if you were to 'create' congestion some people would simply not travel as much. For example one trip to the shops by car instead of two.Because if you remove road capacity the traffic magically disappears.
In the case of the missing roundabout atop the Greek Street bridge, the bus, car and van traffic does not disappear. but is diverted to the right along the narrow Booth Street, then a right-turn along Shaw Heath, then a left-turn along Longshut Lane to its junction with the A6 (Wellington Street).Because if you remove road capacity the traffic magically disappears.
Having travelled a couple of times under the bridge, I think all the columns are still there - maybe one or two are missing, but they are all truncated and none of them are supporting the bridge deck. Some of the concrete panels between the columns are also still in place, as is the base.Thank you for these. Disappointing to see that the central pier is still in place, despite the visualisation video suggesting that it would be removed. Are the columns still supporting the bridge structure, I wonder?
Not every journey needs to make such a direct diversion.In the case of the missing roundabout atop the Greek Street bridge, the bus, car and van traffic does not disappear. but is diverted to the right along the narrow Booth Street, then a right-turn along Shaw Heath, then a left-turn along Longshut Lane to its junction with the A6 (Wellington Street).
The problem more affects the traffic coming into Stockport from the other direction to the one you describe, the one that passes through Edgeley.Not every journey needs to make such a direct diversion.
In my own case, coming from the Buxton direction, I can divert long before the problem using Marple Rd, St Marys Way and even the M60. I am sure many longer distance car journeys do similar moves.
It mostly affects traffic coming from Edgeley, specifically. Anything coming from further afield that needs to reach Stockport centre can divert through Cheadle Heath and down past the Pyramid building.The problem more affects the traffic coming into Stockport from the other direction to the one you describe, the one that passes through Edgeley.
Having used buses into Stockport from the south and west regularly over the last 15 years ago, missing services happen all the time for many reasons, such as mechanical failure, no driver or being delayed by a road traffic accident for example. Are you saying you know definitively that your missing bus was down to disruption caused by the Greek St project?You ask if a recent journey was disrupted and the answer to that comment was a missing 368 service which caused me to be late for a podiatry appointment some weeks ago, which I reported to TfGM.
It seems tome as an outside observer to be a reasonable assumptionAre you saying you know definitively that your missing bus was down to disruption caused by the Greek St project?
See my earlier comments about buses and the reasons that their diagrams can be disrupted and missing at any time (and in any part of the country), even when there is no rail infrastructure works causing diversions.It seems tome as an outside observer to be a reasonable assumption
Exactly my point. Traffic like me, that would use that route, eg going to Pets at Home, will divert long before Greek St, thereby easing the strain on the immediate diversions close to the closed roundabout.The problem more affects the traffic coming into Stockport from the other direction to the one you describe, the one that passes through Edgeley.
I did notice that traffic heading towards Edgeley on Bird Hall Lane towards the Morrisons roundabout now has a large sign advising HGV traffic for Stockport to turn left on Edgeley Road and proceed via Cheadle Heath.Exactly my point. Traffic like me, that would use that route, eg going to Pets at Home, will divert long before Greek St, thereby easing the strain on the immediate diversions close to the closed roundabout.
Heaton Norris follow up tamp and some work at Macclesfield station.There was a 12 hour block on services through Stockport overnight 30/31 August.
Was this connected with the Greek St works, or was it something else?
I don't recall seeing it being announced as part of that project.
I was at Macc this weekend for the football ( sigh) lots of nice new track and ballast in the station area.some work at Macclesfield station.
ThanksHeaton Norris follow up tamp and some work at Macclesfield station.
NoneSlightly off-topic, but could anyone advise if there are any plans to finally replace the five signalboxes at Stockport? (Last discussed in 2021)
Goodness! (Other stronger expletives are appropriate!) Railtrack certainly messed up that procurement, but I didn't know it was that bad.I understand that the replacement of the Ansaldo signalling between Cheadle Hulme and north of Crewe is a higher priority.
It completely failed for days a few years ago (https://www.railforums.co.uk/threads/crewe-delays-16-sep.209188/) whereas all the Stockport area boxes were working fine.Goodness! (Other stronger expletives are appropriate!) Railtrack certainly messed up that procurement, but I didn't know it was that bad.
Being done in a couple of years time.I understand that the replacement of the Ansaldo signalling between Cheadle Hulme and north of Crewe is a higher priority.
It's been chaos, but Stockport's year of disruption is about to end
A major project is coming to an end
It has caused 12 months of disruption and diversion, but Stockport’s Greek Street bridge is finally set to reopen soon as a mammoth £20m project comes close to completion. The roundabout closed in March 2025 so Network Rail engineers could replace the ageing bridge, first built in 1958, which runs over the West Coast Main Line.
Around 200 concrete beams held together the former structure which was demolished along with the road above it before being rebuilt. The work led to closures on surrounding roads including Greek Street and Mercian Way, with the roundabout being a key interchange which connects Stockport town centre, Edgeley, and Shaw Heath, and is near to numerous shops along Castle Street.
Trains have also been impacted during periods of the work when services couldn’t pass through Stockport. The bridge replacement was described by Edgeley councillor Matt Wynne in 2024 as ‘the most significant civil engineering project that we've seen in this borough in the central Stockport area since the M60 was built.’
Network Rail has confirmed the works are on track to be finished by late March, with a specific date to be announced closer to the time.
Coun Caton added that the works have ‘not been as disruptive as expected’, but said some streets in Edgeley have suffered from ‘rat runs’ and heavy traffic.
He said: “Chatham Street and York Street have been battered by traffic because the roundabout has been closed, and are now covered in pot holes and damaged kerbs.”
Network Rail said the bridge replacement has been ‘carefully planned’ to make sure train services running along the tracks can continue to run reliably for years to come, with the new structure in place set to last for 120 years.