The inference from above is that the Bakerloo tunnels may be tighter than the Picc. Bearing in mind the gauge issues and infrastructure works to make the 24 stock fit on the picc. I really hope the surveying and computer gauging model is now developed enough that the BLU team can use it to assess whether a modified version of the train is required or it is better to modify the infrastructure. IIRC shorter end cars had already been mentioned.
To some extent the throw on corners at car ends, and the overhang on inside at car centres depends on bogie pivot spacing. Some tunnel easing work was done in 1970s on Piccadilly line ahead of 1973 stock
To put it into perspective
1938 stock cars were 15.6-15.9m long
1959 stock cars were 15.3-15.6m long
1973 stock cars are 17.5-17.7m long (but taper in at ends)
1972 stock cars on Bakerloo are 16.0m long
The new 2024 stock lengths are : driving motor end cars 15.637m, motor cars 3&7 10.268m, key motor car 5 13.938m, intermediate cars 2,4,6,8 are 9.978m
So individual cars are not longer than existing Bakerloo, but possibly end throw is more if bogies are further in, or intermediate bridging sections will be close to inside wall at centres.
Infrastructure modifications could also relate to depot or siding length
1972 stock 113.5m long
1973 stock 106.8m long
2024 stock 113.0m long
The new trains should be faster to board as doors are 1690mm wide (1370mm on 73 stock)
They axle weight is higher on new stock
2024 stock, Tare 155.4t, crush loaded estimate 259.7t on 10 bogies
1973 stock, Tare 156.9t, crush loaded estimate 233.9t on 12 bogies
Data copied from a FOI request
FOI request detail
tfl.gov.uk