Given the history of Vivarail and the other units, I'm sadly forced to agree. When Vivarail collapsed into administration, it had clearly been struggling with both finances and product quality for some time. This was confirmed by the fact that, ultimately, no-one was interested in purchasing Vivarail as a going concern to convert more D78s into Class 230s.I doubt we will ever see further Class 230 Battery conversions. This exercise simply frees up a 165 and allows GWR to confirm BEMU performance and costs with real passenger use. Yes GWR have other class 230 units and D Stock collecting dust but the cost of converting them to BEMU use, is probably close to what would be spent on ordering BEMUs with all the latest bells and whistles rather than seeking exemptions from various accessibility compliance requirements.
The only reason why the GWR battery train project survived was because it was well advanced and there was a political desire for it to continue. Thus, GWR (who were under DfT control at this point) purchased the assets and IP relating to the battery train project, specifically to trail the fast charge aspect of the technology. It's understood that the remaining assets of Vivarail (the other 230s, unconverted D-stock and stock of spare parts) were included by the administrators at close to scrap value, probably because they saw it as the most expeditious method of returning cash to creditors.
Given that a train operator is a very different type of organisation from a rolling stock manufacturer, the mostly likely scenario is that GWR either license or sell the fast charge technology, proabably as part of the forthcoming rolling stock replacement programe. I'm afriad the mostly likely destination for the 230s and D78s will be scrap.
Indeed. When the project was announced in 2022, there may well have been thoughts about building a 230 mini-fleet to release Turbos from the Thames Valley branches. However, subserquent events means that the only outcome is to prove the fast charge technology in the real world, with a bit of positive PR as bonus. In hindsight, the fact that Vivarail were publicly comitted to start the trail in 2022 says something to why they struggled to survive.The exercise doesn’t currently free up a 165, one is stationed in West Ealing Sidings while the 230 is running incase it breaks down. Obviously in theory this could change in the future.