I think your arithmetic has gone a bit awry, I make it 3 years and 4 months to 4th June 2029.Here we have a station which, in February 2026, has been proposed to be closed in (almost exactly) 5 months time. Excluding any engineering works or, unusually for this station, an extended service on match days - there will be approximately 22 more trains between now and its closure.
No one ia aware of any formal plan amd google searches and Network Raik web site some up blank.Are there any known high-level plans for how this will all be done?
Is platform 4 reopening at Snow Hill one of the first things in the plan?
I did it in 2025 and hung around on the station with the security staff for about 5 trains.Would barely fill a 3 car 172 on a Saturday, so we're talking 100-150 passengers. So not many fans actually use it.
Coincidence.I am interested in the timing of this announcement. Unless I am very much mistaken, posters went up almost immediately the station operator changed to (nationalised) WM Trains. Is this timing coincidental (it would have happened anyway under old West Midlands Trains) or indicative of the way we will do things in the brave new future (some stations could be seen as expendable)?
But it’s proposed for 2029 as per the poster, and also mentioned in reply #6.
It’ll likely take that long for the changes to the viaducts to be designed in any case…
Oops! I didn't notice the year!I think your arithmetic has gone a bit awry, I make it 3 years and 4 months to 4th June 2029.
That would be pretty close to Small Heath, which is hardly busy anyway.I have seen elsewhere (I think it was a youtube vid) that once works have been completed to build the Bordesley Chord a station will be built just south of it's present location.
Coincidence.
I am interested in the timing of this announcement. Unless I am very much mistaken, posters went up almost immediately the station operator changed to (nationalised) WM Trains. Is this timing coincidental (it would have happened anyway under old West Midlands Trains) or indicative of the way we will do things in the brave new future (some stations could be seen as expendable)?
Google comes up with enough results for it.Where are the latest plans for the Midland Rail Hub?
Getting a bit confused as to what is actually happening...
Google comes up with enough results for it.
I know, but I’m greedy and want both.There should be a Midland Metro station very close to there by the end of next year.
Nothing has changed. Chords from Bordesley to the Camp Hills. New platforms at Moor St. P4 at Snow Hill. Kings Norton remodeling, extension of the slows towards Barnt Green. That is pretty much it.Many of which may not be the most up to date proposals.
Nothing has changed. Chords from Bordesley to the Camp Hills. New platforms at Moor St. P4 at Snow Hill. Kings Norton remodeling, extension of the slows towards Barnt Green. That is pretty much it.
Bits of it have, there were meant to be tweaks at Stoke Works and the other side of Worcester, not sure those have survived.Thanks.
Surprising to see nothing has changed though, these sort of projects usually get watered down over time.
The most recent update - from December - has a render of the extension on the Up side of Moor Street, so presumably the lot is getting done.I think services towards the East are at a later phase - not sure if watered down or delayed - with the Camp Hill migration and the 'west' services (1 x extra to each of Bristol, Cardiff, Hereford as I recall) as first up.
Moor St might only get the one existing bay (5?) reinstated, vs the old side (6?) - but p4 Snow Hill seeing Chiltern extended out of the bays to open up more. Can't remember if the east-side bays (zero/minus) made the cut. They might be for Leicester etc anyway.
Eastern part will definitely be later.Yes I was also under the impression that the north and south Bordesley chords were being built and the whole thing done at once.
Why though? There's plenty of capacity at Snow Hill/Moor St with a little expansion. It's not wasting money, it would allow for SW/East Midlands connections to be removed from New St which IS at capacity.The Eastern part is already under construction over the road at Curzon Street, plenty of spare platforms so why waste yet more money expanding Moor Street for the eastern works. Link HS2 to the Water Orton route, install conventional signaling and it's done, Curzon Street might even see trains before the mid 2030's if they do.
The £123 million granted to Midlands Hub is now nearly two years ago so must be running out, NPR got £1.1Billion for three years, lets hope there's some more money made available soon.
Where and how?The Eastern part is already under construction over the road at Curzon Street, plenty of spare platforms so why waste yet more money expanding Moor Street for the eastern works. Link HS2 to the Water Orton route, install conventional signaling and it's done, Curzon Street might even see trains before the mid 2030's if they do.
The £123 million granted to Midlands Hub is now nearly two years ago so must be running out, NPR got £1.1Billion for three years, lets hope there's some more money made available soon.
"Future HS growth to the North" currently sometime in the mid 2040's, so about 20 years time until Curzon Street see's more than a few trains per hour to Old Oak Common?Why though? There's plenty of capacity at Snow Hill/Moor St with a little expansion. It's not wasting money, it would allow for SW/East Midlands connections to be removed from New St which IS at capacity.
Curzon St obviously won't be anywhere near capacity on launch, but that should be used for future HS growth to across the North.
HS2 is running alongside the existing route for a good distance so they could find a solution, if they can't find someone who can.Where and how?
You know what HS2 could really do with? Another respec and redesign, just to make it take even longer to materialise and cost even more...HS2 is running alongside the existing route for a good distance so they could find a solution, if they can't find someone who can.