TfL has issued papers for TfL Board Finance Committe next week

There is a paper for Chairs Action re third Overground concession starting 3rd May 2026. Basically to allow a standstill period, time for signing, and minimum 3 months mobilisation have had to go ahead before the meeting.

Appears to be for 8 years (with optional 2 year extension)

Includes use of class 378 and 710 trains
Managing 82 stations (of 113 stations served)

Looks like winning bidder was notified early Dec, and will be announced mid December, there were 4 pre qualified bidding operators.

Some changes from current one in that annual changes will be based on CPI (rather than RPI which is scheduled to be discontinued in 2030)


There are some updates on service levels from May 2026 and December 2026 in sections 4.6 and 4.7

(quite long document includes some tabular info, so not practical to quote it)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Done a bit more digging in TfL Board papers and it seems that although rail fares are frozen, mayor and TfL will be raising fares CPI +1% for at least 5 years (agreed to get Thamesmead DLR extension). Not that it will affect First Group as the revenue risk is on TfL

Per page 21 of TfL finance report, TfL rail usage is fairly stagnant for half year : 2023/24 was 164m journeys, 2024/25 was 160m, 2025/26 is 161m


== Doublepost prevention - post automatically merged: ==

Just had a thought, could this see some senior First Group staff currently working for GWR get transferred to the Overground concession
 
Last edited:

Simon11

Established Member
Joined
7 Nov 2010
Messages
1,389
Just had a thought, could this see some senior First Group staff currently working for GWR get transferred to the Overground concession

Unlikely- most of the senior staff that they bring in will be from the bid team who understand the operation well and of course have worked on all the ideas/ initiatives that will then need to be delivered having spent nearly half a year working on the bid.
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,510
Location
West London
TfL press release:
First Rail London Limited named as TfL’s preferred operator for London Overground

Transport for London (TfL) has today (Wednesday 10 December) announced its intention to award the new London Overground operator contract to First Rail London Limited (FRLL), a subsidiary of FirstGroup PLC.

FRLL will take over from the current operator, Arriva Rail London, on Sunday 3 May 2026 and work closely with TfL over the eight-year contract to deliver further enhancements for customers on this hugely popular network.

Under the new concession, FRLL will introduce a range of service and operational improvements designed to enhance customer experience and support staff, including:

  • Extra peak-time trains on the Mildmay line from May 2026, with shuttle services between Clapham Junction and Shepherd’s Bush during peak hours, providing more capacity and quicker journeys for commuters
  • More frequent trains on the Windrush line from December 2026, with services through the core section of the Windrush line increasing to 18 trains per hour, reducing waiting times and improving flexibility for customers
  • A relentless focus on the safety of customers and staff with upgraded help points and CCTV
  • Strong collaboration with partners such as Network Rail and Alstom, the manufacturer of the London Overground trains, to maintain high performance and customer satisfaction
  • Investment in people and technology to improve reliability, manage disruption, and provide better customer information
  • Targeted upgrades on the Mildmay line infrastructure to boost performance for customers
  • Innovative customer information solutions, including expanding digital screens to display live travel updates for stations and nearby interchange services, such as buses across all operator-managed stations
  • Continued work to improve accessibility in partnership with leading advocacy groups
 

bicbasher

Established Member
Joined
14 May 2010
Messages
1,835
Location
London
So it looks like an extra 2tph on the Windrush to Crystal Palace and 2tph to Clapham Junction both of which are much needed.
 

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,888
Location
London
A shuttle service between Clapham Junction and Shepherd's Bush is useful because it's becoming a popular head office location.

I'm not sure if TfL would want GBR running the London Overground and Elizabeth Line. If anything it''d be better for them to be either inhouse or a joint venture.
 

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,888
Location
London
The RMT have opposed FirstGroup getting the London Overground contract although seems odd to moan given the tender went out a while ago, likewise the Elizabeth Line contract to MTS.
 

fandroid

Established Member
Joined
9 Nov 2014
Messages
2,557
Location
Hampshire
Unlikely- most of the senior staff that they bring in will be from the bid team who understand the operation well and of course have worked on all the ideas/ initiatives that will then need to be delivered having spent nearly half a year working on the bid.
Is there any history to back this assumption up? In other industries the bid teams tend to be quite distinct from implementations teams. I was on several bid teams and never joined the implementation of the successful bids.

My guess is that the best of First Group's rail operations management staff will be shifted over very swiftly.
 

Ian Hardy

Member
Joined
18 Nov 2009
Messages
445
The RMT have opposed FirstGroup getting the London Overground contract although seems odd to moan given the tender went out a while ago, likewise the Elizabeth Line contract to MTS.
Probably because the RMT doesn't a private contractor making profits out of the London Overground contract, they want it to be brought in-house in the same way that the TOCs are being brought back under direct DfT control.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
Probably because the RMT doesn't a private contractor making profits out of the London Overground contract, they want it to be brought in-house in the same way that the TOCs are being brought back under direct DfT control.

London Underground is run in house by TFL, have the RMT seen the state that has been allowed to get into over the last few years?
 

Ian Hardy

Member
Joined
18 Nov 2009
Messages
445
London Underground is run in house by TFL, have the RMT seen the state that has been allowed to get into over the last few years?
That doesn't matter to the RMT, they are only want the railway to be run by the "state" so that no private company can take any profits out of it.

LUL is under the control of a mayor that had a fares freeze for far too long so that there isn't any money to keep the system going in the way it was before those freezes.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Do they even have enough units to increase the service frequency?
Yes, the last order of 710s included a number of units to increase frequency on a number of routes, and most of these increases have not yet happened.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Yes, the last order of 710s included a number of units to increase frequency on a number of routes, and most of these increases have not yet happened.
6 extra 5car units (numbered 374-379) were ordered for higher frequency, they are dual voltage for Watford lines and North London lines (now renamed Lioness and Mildmay)

Some of these effectively cascade some older class 378 units to strengthen stock on other lines.

They have sort of been in use as extra spares, rather than sitting around pending service uplift. So presumably the depots will (from May) need to tighten up on ensuring sufficient stock is ready for each days service.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,253
They have sort of been in use as extra spares, rather than sitting around pending service uplift.
I imagine users on the Watford DC lines have become accustomed to the extra capacity the five car 710s bring, relative to four-car 710s, not realising that their service is intended to be predominantly run by four-car units.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
I imagine users on the Watford DC lines have become accustomed to the extra capacity the five car 710s bring, relative to four-car 710s, not realising that their service is intended to be predominantly run by four-car units.
I just had a quick forum search and that exact point was being discussed around 2019. TfL were saying that some frequency uplifts would be delayed until about 2021. Here we are and it’s about to happen in 2026. No doubt it will come as a surprise when, as you note, the Watford services become 4 car.

I also remember back when the extra 710s were being justified/ordered, wasn’t part of the explanation that the Romford shuttle would use a retained 315 or something? o_O I wonder what happened to that cunning plan…
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
That doesn't matter to the RMT, they are only want the railway to be run by the "state" so that no private company can take any profits out of it.

LUL is under the control of a mayor that had a fares freeze for far too long so that there isn't any money to keep the system going in the way it was before those freezes.

Exactly, the grass isn't always greener.
 

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,888
Location
London
6 extra 5car units (numbered 374-379) were ordered for higher frequency, they are dual voltage for Watford lines and North London lines (now renamed Lioness and Mildmay)

Some of these effectively cascade some older class 378 units to strengthen stock on other lines.

They have sort of been in use as extra spares, rather than sitting around pending service uplift. So presumably the depots will (from May) need to tighten up on ensuring sufficient stock is ready for each days service.
I think that has been the plan for some time that once the 710s were in service, they would cascade the ones from the Lioness and part of the NLL/Mildmay Richmond to Stratford to increase capacity on the Windrush Line.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,728
Unlikely- most of the senior staff that they bring in will be from the bid team who understand the operation well and of course have worked on all the ideas/ initiatives that will then need to be delivered having spent nearly half a year working on the bid.
Bid teams do not “understand the operation well” as a general rule. They are there to win a bid and know what is in that bid. But they do not have on the ground knowledge of the operation, even more so if they are not the incumbent.
 

3141

Established Member
Joined
1 Apr 2012
Messages
2,108
Location
Whitchurch, Hampshire
Bid teams do not “understand the operation well” as a general rule. They are there to win a bid and know what is in that bid. But they do not have on the ground knowledge of the operation, even more so if they are not the incumbent.

Following on from that, members of this forum may recall the discussions that took place after Abellio (now Transport UK) won the Greater Anglia franchise, about how the bid team had included features that the operating side were finding problematic in day-to-day running.
 

bb21

Emeritus Moderator
Joined
4 Feb 2010
Messages
24,445
Probably because the RMT doesn't a private contractor making profits out of the London Overground contract, they want it to be brought in-house in the same way that the TOCs are being brought back under direct DfT control.
But they selectively ignore the fact many union men and women have done very well out of privatisation indeed. Same goes with ASLEF.

I am all for the RMT on many fronts but find their obsession with nationalisation inconsistent with their claim to put their members' interests first.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
But they selectively ignore the fact many union men and women have done very well out of privatisation indeed. Same goes with ASLEF.

I am all for the RMT on many fronts but find their obsession with nationalisation inconsistent with their claim to put their members' interests first.

Yep, agreed.

For all it's faults, which are plenty, I'm not convinced we'd have anything like the rail network, pay, conditions etc we enjoy today if it wasn't for privatisation.
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,443
Location
Isle of Man
I am all for the RMT on many fronts but find their obsession with nationalisation inconsistent with their claim to put their members' interests first.
They know the gravy train has long since left the station, so now they want nationalisation to harmonise contracts based on the highest-paying TOCs.
LUL is under the control of a mayor that had a fares freeze for far too long
There hasn’t been a fares freeze. Travelcards and caps have gone up every single year.

The reason why TfL are short on money is because pre-Covid about 70% of their entire revenue came from the fare box. And for 2-3 years that revenue dropped off a cliff.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
I am all for the RMT on many fronts but find their obsession with nationalisation inconsistent with their claim to put their members' interests first.
Yes they seem to have a misguided idea that nationalisation improves things, protects jobs, and pays better (which of course it didn't)

We all know that ever since the privatised railway was replaced by state run management contracts nearly six years ago, there has been stagnation, lack of orders, and pay awards that dragged on. Not an improvement by any measure.

So far the nationalised operators have not shown any benefits from their new nationalised status to either customers or staff, or those in rail related manufacturing. So why do RMT daftly think nationalisation is good.
 

bb21

Emeritus Moderator
Joined
4 Feb 2010
Messages
24,445
Yes they seem to have a misguided idea that nationalisation improves things, protects jobs, and pays better (which of course it didn't)

We all know that ever since the privatised railway was replaced by state run management contracts nearly six years ago, there has been stagnation, lack of orders, and pay awards that dragged on. Not an improvement by any measure.

So far the nationalised operators have not shown any benefits from their new nationalised status to either customers or staff, or those in rail related manufacturing. So why do RMT daftly think nationalisation is good.
I know I have some very controversial opinions on this subject but so far from what I have seen it has actually got worse for most nationalised operators, not better. What makes nationalisation (and privatisation too for that matter) tick is properly managed investment and effective regulation/accountability, not who owns a contract to run something. We've had micro-managing by civil servants who barely understand how the industry works for years (sometimes with very perverse incentives and outcomes) and I can't see that changing. That said I do appreciate that changes will take time and I am willing to keep an open mind about it and perhaps give them until the end of the current parliament to see some positive impact.
 