ac6000cw
Established Member
There's an ideal triangular pocket of scrubby undeveloped land between the current alignment and Coldham's Lane, which would be perfect for a Cambridge East station, a car park and a west-facing fan of carriage sidings. It is also currently well separated from any housing and would remain so even when the airport is fully developed.
Where they've put the EWR blob is on top of a small housing estate, a Sainsbury's and a cement works...
![]()
...but the actual likely site would have to be more like here, a little southeast of the blob:
https://www.google.com/maps/@52.1973124,0.1615225,1437m/data=!3m1!1e3?entry=ttu&g_ep=EgoyMDI1MTExNi4wIKXMDSoASAFQAw==
If all they they really need a glorified eastern carriage sidings and turnback, it's an ideal site. I am pleased they are looking to make it somewhat useful to an underserved and soon-growing community.
The:
...is actually the top of an old refuse landfill site, which was originally a clay/chalk pit for the Cherry Hinton cement works (which was situated where the Holiday Inn and David Lloyd buildings are now). The areas of water to the west and south of it on the other side of the railway are flooded ex-clay/chalk pits. The undeveloped areas to the east and north east of the David Lloyd buildings are also old landfill sites. The industrial units to the north of David Lloyd are actually in the bottom of the only pit that wasn't either flooded or landfilled.ideal triangular pocket of scrubby undeveloped land between the current alignment and Coldham's Lane
I assume the landfill issues (e.g. contaminated land and methane production) are why those areas have remained undeveloped to date.
In its later years before it closed in the mid-1980s, IIRC the cement works drying ovens were powered by methane gas produced by the decaying refuse in the covered-over landfill pits.
History of the cement works - https://capturingcambridge.org/barnwell/coldhams-lane/norman-cement-works/