Peter Mugridge
Veteran Member
That looks fantastically good, and presumably the fact of the livery now being applied means a definite start to services cannot be far away?
One would hope so.That looks fantastically good, and presumably the fact of the livery now being applied means a definite start to services cannot be far away?
That looks fantastically good, and presumably the fact of the livery now being applied means a definite start to services cannot be far away?
One hopes they fitted the DOO equipment shortly before wrapping it, in which case its another step on the way.One would hope so.
Glad they’ve matched it with the refreshed colour scheme of the 168s!
One hopes they fitted the DOO equipment shortly before wrapping it, in which case its another step on the way.
Although isnt there still a big issue with the number of trained drivers?
As far as I am aware, a significant number of drivers came across to EWR/Bletchley depot from other depots on Chiltern, which means that a lot of them are already trained and only required route knowledge.One hopes they fitted the DOO equipment shortly before wrapping it, in which case its another step on the way.
Although isnt there still a big issue with the number of trained drivers?
They have to learn to Fenny Stratford as it is the only way of accessing the depot:it means only Gavray to MKC, Bletchley HL and depot (and I think a Fenny Stratford move was mentioned in regards to route knowledge)
How convenientThey have to learn to Fenny Stratford as it is the only way of accessing the depot:
Bletchley High > Fenny Stratford (Reverse) > Bletchley Low (Reverse) > Depot ( passing the depot twice on different levels in doing that short move!)
If they're using the TMD/Cambridge sidings isn't there direct access from Fenny Stratford?They have to learn to Fenny Stratford as it is the only way of accessing the depot:
Bletchley High > Fenny Stratford (Reverse) > Bletchley Low (Reverse) > Depot ( passing the depot twice on different levels in doing that short move!)
no - certainly not into the depot. Only accessible from the Bletchley end. The Cambridge sidings are connected at the Fenny end but am unsure if:If they're using the TMD/Cambridge sidings isn't there direct access from Fenny Stratford?
absolutely - just more hassle. Fewer trains to annoy at FennyAlternatively you can run Bletchley P7 > MKC (reverse in any platform) > Bletchley P5 > Bletchley TMD. Learning via Fenny Stratford is very helpful in case of a problem at the Bletchley end of the depot but not 100% necessary for service.
not sure there is a capacity for E-W trains to use the carriage sidings. They look pretty full of an evening.If using Bletchley CS alongside the WCML then there's direct access from Bletchley Platform 5 or MKC, so again Fenny Stratford would be helpful but not strictly necessary.
If they're using the TMD/Cambridge sidings isn't there direct access from Fenny Stratford?
Alternatively you can run Bletchley P7 > MKC (reverse in any platform) > Bletchley P5 > Bletchley TMD. Learning via Fenny Stratford is very helpful in case of a problem at the Bletchley end of the depot but not 100% necessary for service.
If using Bletchley CS alongside the WCML then there's direct access from Bletchley Platform 5 or MKC, so again Fenny Stratford would be helpful but not strictly necessary.
not sure there is a capacity for E-W trains to use the carriage sidings. They look pretty full of an evening.

Makes perfect sense to me! Thanks for the clarification!They have to learn to Fenny Stratford as it is the only way of accessing the depot:
Bletchley High > Fenny Stratford (Reverse) > Bletchley Low (Reverse) > Depot ( passing the depot twice on different levels in doing that short move!)
I really don't get why they don't introduce an initial weekdays only daytime introductory service of two or three round trips to start, which you'd think they would have enough drivers trained for. This is normal practice when starting a new service (give it a soft start to iron out problems with low loadings), yet it seems they still want to do a "big bang" to the full half hourly so it can all collapse far more spectacularly on day one.
Technically yes. Either terminate in the eastbound platform and shunt forward over the level crossing, or cross to wrong road at Bicester Depot West Jn.Is there a turnback facility East of Bicester Village? If you can't make DOO work East of Bicester Village for the moment, then surely the next best thing is to double the number of services between Bicester and Oxford and get the drivers accustomed to running the units in passenger service and passengers prepared for the best ever commuter service.
I find it depressing that, as far as I know, there is still no target (let alone firm) date for the start of passenger services from Oxford to Milton Keynes. Although freight trains are running, ahem, south-north: amusingly, between Southampton and Northampton.Chiltern Railways has still to adopt Winslow station on East West Rail, with the final work still being done to finish the only new station on phase one of the route between Oxford and Milton Keynes.
While gate lines and ticket vending machines are being installed, work is also being done to improve the passenger experience in the station building.
Speaking at the Rail Forum annual conference, Chiltern Managing Director Richard Allan said: “That station was designed and built several years ago. When we came to be accounted as the operator, we went to have a look at Winslow and discovered that it’s being built, but it’s not being built fit for purpose."
On the New Stations calendar thread master list, the anticipated opening date for Winslow station is shown as "2025 (unlikely)"Rail magazine is reporting that Chiltern management aren't yet happy with Winslow station.
I find it depressing that, as far as I know, there is still no target (let alone firm) date for the start of passenger services from Oxford to Milton Keynes. Although freight trains are running, ahem, south-north: between Southampton and Northampton.
This is particularly depressing. However it would certainly be possible to run Oxford-MK and just not stop at Winslow until the station is ready.Rail magazine is reporting that Chiltern management aren't yet happy with Winslow station.
I find it depressing that, as far as I know, there is still no target (let alone firm) date for the start of passenger services from Oxford to Milton Keynes. Although freight trains are running, ahem, south-north: between Southampton and Northampton.
Presumably the constraint on service start remains agreeing who's opening the doors? Has there been any more news regarding this?This is particularly depressing. However it would certainly be possible to run Oxford-MK and just not stop at Winslow until the station is ready.
There seem to have been a few more training runs in the last couple of weeks. Hopefully it could be very early next year when service starts.
There has.Presumably the constraint on service start remains agreeing who's opening the doors? Has there been any more news regarding this?
You mean a Government department went for a cheaper short term option with blatant disregard for any long term planning?On hindsight it might’ve been better to have had East West Rail run the service, yes it might’ve been more expensive to initially set up but if Chiltern end up having to recruit around 50 additional guards, it would ultimately have been far better value & future proofed any extension plans.
Why would setting up a completely new TOC have been any better? You're going to have to duplicate everything Chiltern are already doing for all their other services. EWR only exist to deliver the infrastructure.On hindsight it might’ve been better to have had East West Rail run the service, yes it might’ve been more expensive to initially set up but if Chiltern end up having to recruit around 50 additional guards, it would ultimately have been far better value & future proofed any extension plans.
Crossrail for instance didn’t face any similar problems as they recruited from the outset for their desired operating method.There's no guarantee another TOC wouldn't have had exactly the same fight with the unions over the method of operation. The benefit of an existing TOC might be if the drivers already have DCO in their terms.
Did any of the GA/GWR services TfL Rail took over work with guards at the time they were transferred? It's a bit of a different negotiation with the unions if you don't employ any guards in the first place.Crossrail for instance didn’t face any similar problems as they recruited from the outset for their desired operating method.
Indeed. I can't imagine those drivers recruited are earning much overtime at the moment either.. not in their interests to delay.. would there typically be additional pay for DOO, or is it just rolled into the salary by now?The fact of the matter is that as this is a new service so no guards have lost their jobs because of DOO. Existing Chiltern drivers are all passed to work DOO. Chiltern has been or will be recruiting guards for the new Mk 5As as they will be operating more trains on which guards are required for which the unions should be grateful.
It's certainly a very good way of discouraging governments from putting further public money into reopening closed lines. It also damages the cost/benefit calculation for such lines.The fact of the matter is that as this is a new service so no guards have lost their jobs because of DOO. Existing Chiltern drivers are all passed to work DOO. Chiltern has been or will be recruiting guards for the new Mk 5As as they will be operating more trains on which guards are required for which the unions should be grateful.
The unions should be grateful that guards have been provided for LHCS?The fact of the matter is that as this is a new service so no guards have lost their jobs because of DOO. Existing Chiltern drivers are all passed to work DOO. Chiltern has been or will be recruiting guards for the new Mk 5As as they will be operating more trains on which guards are required for which the unions should be grateful.
RMT and ASLEF are standing fast on the fact that there is no platform DOO equipment and no on board DOO equipment and no station staff.
The Class 196s were built with carriage side cameras specifically for DOO use. The equipment was deactivated when these trains were used on WMR but would have been reactivated when the trains were transferred to Chiltern.RMT and ASLEF are standing fast on the fact that there is no platform DOO equipment and no on board DOO equipment and no station staff.