hvshe
Member
Pretty far-fetched question, but how feasible is it for GWR stations to Banbury [Tackley, Heyford, Kings Sutton] to be served by an extension of Chiltern's 1tp2h Birmingham-Leamington stopper, instead of the current GWR 1tp2h extension of Didcot Local?
I'd imagine that when they electrify Didcot-Oxford, it would be a waste of resources to run bi-mode trains just because occasionally some services may venture into diesel land
I know that terminating capacity at Oxford from the North is limited, could that be mitigated by running some EWR trains as through trains? Perhaps temporarily taking over the Didcot local (only when not electrified), or through-running onto the proposed Oxford-Bristol services?
This is even more far-fetched:
Would it be better to pump up the service frequency of Birmingham-Oxford to 1tph, in the process cutting XC's Newcastle-Reading to Newcastle-Birmingham?
Timings from Oxford would be
(XC Manc/XC Newcastle/New) 17/17/27 Banbury, 35/35/45 Leamington, 72/66/83 Birmingham NS/MS
I'd imagine that when they electrify Didcot-Oxford, it would be a waste of resources to run bi-mode trains just because occasionally some services may venture into diesel land
I know that terminating capacity at Oxford from the North is limited, could that be mitigated by running some EWR trains as through trains? Perhaps temporarily taking over the Didcot local (only when not electrified), or through-running onto the proposed Oxford-Bristol services?
This is even more far-fetched:
Would it be better to pump up the service frequency of Birmingham-Oxford to 1tph, in the process cutting XC's Newcastle-Reading to Newcastle-Birmingham?
Timings from Oxford would be
(XC Manc/XC Newcastle/New) 17/17/27 Banbury, 35/35/45 Leamington, 72/66/83 Birmingham NS/MS