I've always been of the opinion, one of the two Manchester - Helsby - Chesters should run via Ellesmere Port and via a new 600 metre single line curve south of Hooton. There's capacity between the electrics. This would remove the need to extend Merseyrail. With the stop at the Port, and occasional stops at Ince / Stanlow would add +/-10 minutes.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,039
Location
Frodsham
Really, I think the days of asking people to get off at some mid- way station like Ormskirk, Ellesmere Port and Kirkby ( now Headbolt) should be forgotten. People dont travel like that just because its an administrational border, I mean in continental Europe trains cross International borders. To continue Merseyrail services to more logical and useful destinations, shouldn't be a big ask if the country is serious about public transport, which it ought to be if we're not going to end up completely gridlocked.
 

TheSel

Member
Joined
10 Oct 2017
Messages
1,168
Location
Southport, Merseyside
Really, I think the days of asking people to get off at some mid- way station like Ormskirk, Ellesmere Port and Kirkby ( now Headbolt) should be forgotten. People dont travel like that just because its an administrational border, I mean in continental Europe trains cross International borders. To continue Merseyrail services to more logical and useful destinations, shouldn't be a big ask if the country is serious about public transport, which it ought to be if we're not going to end up completely gridlocked.
Cue the demands for even larger batteries being fitted to 777s to enable the Wirral Ramblers get to Ribblehead for their annual walk without changing trains. :D
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,663
I feel that putting everything into an enlarged Burscough Bridge station is one of the proposed schemes in the UK that has a “we need to fill this gap in the rail network” approach rather than a boost the transport network approach. I think proposals for creating a Burscough Bridge junction station doesn’t really create the huge boost for the network that some people think it does. It just redraws and locks in the existing limitations of the network.
 

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
Really, I think the days of asking people to get off at some mid- way station like Ormskirk, Ellesmere Port and Kirkby ( now Headbolt) should be forgotten. People dont travel like that just because its an administrational border, I mean in continental Europe trains cross International borders. To continue Merseyrail services to more logical and useful destinations, shouldn't be a big ask if the country is serious about public transport, which it ought to be if we're not going to end up completely gridlocked.
Very few do change trains at some mid-way station like Ormskirk. Most people from Burscough will just drive to Ormskirk and, something many people conveniently seem to forget, there are already direct service between Preston and Liverpool so neither travelling via Ormskirk nor changing trains are required. The same applies to Headbolt Lane. Nobody is going to travel between Wigan and Liverpool via Kirkby when there are 3 direct tph.
 

urbophile

Established Member
Joined
26 Nov 2015
Messages
2,482
Location
Liverpool
Really, I think the days of asking people to get off at some mid- way station like Ormskirk, Ellesmere Port and Kirkby ( now Headbolt) should be forgotten. People dont travel like that just because its an administrational border, I mean in continental Europe trains cross International borders. To continue Merseyrail services to more logical and useful destinations, shouldn't be a big ask if the country is serious about public transport, which it ought to be if we're not going to end up completely gridlocked.
Of course international express trains cross borders. And no-one is suggesting that passengers for London, Manchester and so on from Liverpool should change at the regional boundary. Local (as opposed to express or inter-regional) trains are a different matter. Merseyrail is a 'local service for local people' (couldn't resist the quote, but no xenophobia intended). Metro trains aren't designed for long journeys and Merseyrail, as a more or less self-contained system, would become unmanageable if it had much through running with the national network. There is scope for some expansion but the emphasis should be on infill; large swathes of the city region are not covered by any form of rail, let alone Merseyrail.
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,039
Location
Frodsham
Cue the demands for even larger batteries being fitted to 777s to enable the Wirral Ramblers get to Ribblehead for their annual walk without changing trains. :D

== Doublepost prevention - post automatically merged: ==

Of course international express trains cross borders. And no-one is suggesting that passengers for London, Manchester and so on from Liverpool should change at the regional boundary. Local (as opposed to express or inter-regional) trains are a different matter. Merseyrail is a 'local service for local people' (couldn't resist the quote, but no xenophobia intended). Metro trains aren't designed for long journeys and Merseyrail, as a more or less self-contained system, would become unmanageable if it had much through running with the national network. There is scope for some expansion but the emphasis should be on infill; large swathes of the city region are not covered by any form of rail, let alone Merseyrail.
That's true, but the areas that need Merseyrail where it is not available now, its all built up, with little or no prospect of that happening. Of course if you were in London it would all be possible, but cant see Merseyrail reaching Gateacre for example ( as it was intended) and many other areas with no rail. Besides the was meant to be about where can Merseyrail extend to . The lines mentioned all have track now.

== Doublepost prevention - post automatically merged: ==

Very few do change trains at some mid-way station like Ormskirk. Most people from Burscough will just drive to Ormskirk and, something many people conveniently seem to forget, there are already direct service between Preston and Liverpool so neither travelling via Ormskirk nor changing trains are required. The same applies to Headbolt Lane. Nobody is going to travel between Wigan and Liverpool via Kirkby when there are 3 direct tph.
They used to because they all had through services.

== Doublepost prevention - post automatically merged: ==

Next they will be wanting a toilet to go with those batteries.
Liverpool to Southport or Chester is getting close to the limit for no loos

== Doublepost prevention - post automatically merged: ==

Cue the demands for even larger batteries being fitted to 777s to enable the Wirral Ramblers get to Ribblehead for their annual walk without changing trains. :D
Sorry ??!
 
Last edited:

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,752
Location
"Marston Vale mafia"
However I must admit I don't really see the point in going to Burscough Bridge - from aerial photography it doesn't really seem to be an enormously more advantageous location.

You don't need to look at Google Maps to see the advantage of easy connections to Manchester.

== Doublepost prevention - post automatically merged: ==

Nobody is going to travel between Wigan and Liverpool via Kirkby when there are 3 direct tph.

This is untrue. If Merseyrail operated the route that would become the main Wigan to Liverpool service just as it was before it was lopped at Kirkby.
 

KevinTurvey

Member
Joined
9 Oct 2016
Messages
265
Well they might as well run the Preston-Ormskirk, and Headbolt-Wigan as 777s to Liverpool all the way, 1tph only needed presently, timetabled so it runs ½ hour after the Preston via St Helens departure, for connecting passengers, of which there are many. Minimal infrastructure spend required, and the services and connectivity convenience are transformed. Maybe a charger facility at the Preston and Wallgate ends required.

I think back to when Liverpool-Chester services were operated like this with a split at Hooton or Rock Ferry, you couldn’t fill a 2 car dmu, except at peak times. Trains, now run twice as often and are often full off peak, and this route is rural between Hooton and Bache and crosses county borders.

A 777 must be cheaper to operate than a 40yr old 150/156 surely? And they’re going to have to have new trains on these routes at some point soon anyway so may as well battery up a few more, or even order a few more 777, and kill two birds with one stone.
 

aron2smith

Member
Joined
20 Jan 2025
Messages
699
Location
London
Really, I think the days of asking people to get off at some mid- way station like Ormskirk, Ellesmere Port and Kirkby ( now Headbolt) should be forgotten. People dont travel like that just because its an administrational border, I mean in continental Europe trains cross International borders. To continue Merseyrail services to more logical and useful destinations, shouldn't be a big ask if the country is serious about public transport, which it ought to be if we're not going to end up completely gridlocked.
Agreed, this is all too common with buses too but with rail, Merseyrail is one of the oddest examples I've ever seen of an administrative boundary getting in the literal way of the tracks. Even London Overground doesn't do it!

Headbolt Lane has a pavement and a black corrugated metal sheet across the tracks, it's so odd and cheap looking!

Really these stopping services should run on to Warrington Bank Quay, Preston and Runcorn from their various branches.

I'm not sure if I was meant as a future direct service or just one with a convenient connecting timetable but Transport for Wales is keen on properly connecting Wrexham Central and stations along the way like Shotton and Hope to Liverpool. Again not sure if they meant extending trains beyond Bidston or just making the 2 lines connect more conveniently.

Anyway I drew a rough idea on the Merseyrail Map of what I think should happen for a truly effective regional network.

Ellesmere Port - Extend to Helsby and Warrington Bank Quay. Enables easier access to WCML for areas south of the Mersey.
Lime Street to Warrington Central - 1/2 of these are extension of Hunts Cross trains and 1/2 via Mossley Hill
Lime Street to Wigan North Western - Finally putting St Helens on Merseyrail!
Headbolt Lane to Wigan Wallgate - One through service to end severance
Ormskirk to Preston - As above

And Stopping Services between Lime Street and Manchester Victoria via Earlestown as a joint service ran by both Merseyrail and the Bee Network.

I think any changes to Merseyrail have to make it easier for people living near intermediate and smaller stations to access the mainline, currently every line forces people to go to Lime Street to change trains for further afield.
Manchester always gets mentioned in regardless to Liverpool but I think Liverpool needs better trains and the infrastructure to make it happen improving services to places in Cheshire, Lancashire, North Wales and the Midlands too. I did 1 Liverpool to Birmingham train once and never again, it was a miserable experience, so overcrowded and not often enough for the demand.
 

Attachments

  • Screenshot 2025-08-31 211030.png
    Screenshot 2025-08-31 211030.png
    340.5 KB · Views: 51

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
Well they might as well run the Preston-Ormskirk, and Headbolt-Wigan as 777s to Liverpool all the way,
Yes, they might as well. Just spend £5 million on a footbridge and lifts at Headbolt Lane and £20 or £30 million on 2 or 3 additional 777s. It's only money and might as well is a perfect justification for wasting it.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,752
Location
"Marston Vale mafia"
Absolute no to extending Merseyrail onto the CLC unless it is the ONLY service on the CLC on that section (ie buffer stops at Warrington C and an end to the Lime St CLC service). The punctuality on the route is utterly woeful and serious delay would be imported on a daily basis.

A simple rule must be that Merseyrail remains segregated, so if it takes over a line that is to the exclusion of any other operations thereon.

== Doublepost prevention - post automatically merged: ==

Yes, they might as well. Just spend £5 million on a footbridge and lifts at Headbolt Lane and £20 or £30 million on 2 or 3 additional 777s. It's only money and might as well is a perfect justification for wasting it.

It wouldn't be surprising to me if long term extending to Wigan half hourly would actually save money to the railway as a whole (including the extra revenue) because it is a really awkward service as far as Northern goes and gets in the way of a nice half hourly pattern at Wigan.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,603
Location
Dunham/Bowdon
Absolute no to extending Merseyrail onto the CLC unless it is the ONLY service on the CLC on that section (ie buffer stops at Warrington C and an end to the Lime St CLC service). The punctuality on the route is utterly woeful and serious delay would be imported on a daily basis.

A simple rule must be that Merseyrail remains segregated, so if it takes over a line that is to the exclusion of any other operations thereon.

== Doublepost prevention - post automatically merged: ==



It wouldn't be surprising to me if long term extending to Wigan half hourly would actually save money to the railway as a whole (including the extra revenue) because it is a really awkward service as far as Northern goes and gets in the way of a nice half hourly pattern at Wigan.
I agree.

The service from Liverpool Lime Street to Manchester via the CLC line needs to be retained long-term. The proposed new NPR line between the 2 cities is unaffordable and so indirect that it won't improve journey times between them.

I would extend Merseyrail trains currently terminating at Hunt's Cross to Gateacre, as originally intended.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,365
I agree.

The service from Liverpool Lime Street to Manchester via the CLC line needs to be retained long-term. The proposed new NPR line between the 2 cities is unaffordable and so indirect that it won't improve journey times between them.
Even if we assume NPR is unaffordable and will not be built, does that mean the CLC service needs to be retained?

Buffer stops at Warrington Central would still allow the line to perform an emergency "get me home" function in case of disruption to the Chat Moss. Passengers might be annoyed by a Metrolink or slow train to Warrington and then changing to Merseyrail, but it will still get them home.

In normal operations, one railway is sufficient for the end to end traffic.
 

TheSel

Member
Joined
10 Oct 2017
Messages
1,168
Location
Southport, Merseyside
I would extend Merseyrail trains currently terminating at Hunt's Cross to Gateacre, as originally intended.
As @frodshamfella points out, there is now very little liklihood of Gateacre being served by Merseyrail again. The track has long been lifted, the station demolished and the trackbed is now a popular and well used section of the Trans-Pennine Trail.

Furthermore, in the unlikely event that reinstatement of the track along this section was approved, why stop at Gateacre? Cue the immediate cries for it to go further, to serve Childwall, Broad Green, Knotty Ash, West Derby and the like.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,603
Location
Dunham/Bowdon
As @frodshamfella points out, there is now very little liklihood of Gateacre being served by Merseyrail again. The track has long been lifted, the station demolished and the trackbed is now a popular and well used section of the Trans-Pennine Trail.

Furthermore, in the unlikely event that reinstatement of the track along this section was approved, why stop at Gateacre? Cue the immediate cries for it to go further, to serve Childwall, Broad Green, Knotty Ash, West Derby and the like.
Gateacre could be connected from Hunt's Cross by a relatively cheap short non-electrified single line extension, served by class 777 BEMUs. It is a densely populated suburb within Merseyside, whose current bus services to Liverpool city centre are slow and suboptimal. There would be room to preserve a footpath/cycle path alongside the reopened line, as the original formation was double track.

Most of the other suggestions on this thread are for extensions to rural areas outwith Merseyside, for which BCRs are likely to be very poor. For example, what purpose if any is there for extending Merseyrail from Ellesmere Port to the village of Helsby (population 5,000), which already has a direct train service to Liverpool?
 
Last edited:

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,752
Location
"Marston Vale mafia"
The main obstacle for Gateacre is that some idiot/wilful vandal* decided to plonk a signalling building right across the trackbed at the end of the platform at Hunts Cross and that might have to be relocated if we wanted to keep things segregated. Though I suppose it would be possible for Merseyrail to use the main platforms if just going through.

* Not sure if this was just unthinking or of it was a wilful sabotage of the planned 1970s extension...

== Doublepost prevention - post automatically merged: ==

Most of the other suggestions on this thread are for extensions to rural areas outwith Merseyside, for which BCRs are likely to be very poor.

I'd not call Wigan Wallgate rural. It would also mean a station actually in Skelmersdale (albeit on the southern edge). The line is quiet at present due to the not very useful service, but quite a few places it serves are urban.

Rainford is fairly rural, but an expansion of Rainford Junction with an ecovillage/ecotown could help with planning gain funding.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,377
Location
belfast
Gateacre could be connected from Hunt's Cross by a relatively cheap short non-electrified single line extension, served by class 777 BEMUs. It is a densely populated suburb within Merseyside, whose current bus services to Liverpool city centre are slow and suboptimal. There would be room to preserve a footpath alongside the reopened line.

Most of the other suggestions on this thread are for extensions to rural areas outwith Merseyside, for which BCRs are likely to be very poor. For example, what purpose if any is there for extending Merseyrail from Ellesmere Port to the village of Helsby (population 5,000), which already has a direct train service to Liverpool?
The purpose is to eliminate the useless service between Ellesmere Port and Helsby, replace it with something that is worth using, bringing operational simplification at very limited cost (one extra 777, but you no longer need whatever Northern is currently using, so the net increase is less than 1 unit), giving the intermediate stations a direct link to Merseyside (not just Liverpool), giving Ellesmere port better connections towards the East (as better service to Helsby would enable connections).

Just to highlight this again, no infrastructure works are needed, and the service would be more robust. That is useful if, as @Bletchleyite suggested, the new Helsby service and the Chester service interwork, improving reliability on both. It's a very low cost improvement for the service. I suspect the main issue is that it isn't in Merseyside.
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,039
Location
Frodsham
Gateacre could be connected from Hunt's Cross by a relatively cheap short non-electrified single line extension, served by class 777 BEMUs. It is a densely populated suburb within Merseyside, whose current bus services to Liverpool city centre are slow and suboptimal. There would be room to preserve a footpath/cycle path alongside the reopened line, as the original formation was double track.

Most of the other suggestions on this thread are for extensions to rural areas outwith Merseyside, for which BCRs are likely to be very poor. For example, what purpose if any is there for extending Merseyrail from Ellesmere Port to the village of Helsby (population 5,000), which already has a direct train service to Liverpool?
Its a crying shame that Merseyrail didn't reach Gateacre years back. If it could be done now, and I dont know the area well enough, I'd say do for sure. That whole area Gateacre, Woolton , Childwall, is densely populated , with only buses to the city and a lot of traffic. It would enable people to change at South Parkway easily too for onward connections.

== Doublepost prevention - post automatically merged: ==

Agreed, this is all too common with buses too but with rail, Merseyrail is one of the oddest examples I've ever seen of an administrative boundary getting in the literal way of the tracks. Even London Overground doesn't do it!

Headbolt Lane has a pavement and a black corrugated metal sheet across the tracks, it's so odd and cheap looking!

Really these stopping services should run on to Warrington Bank Quay, Preston and Runcorn from their various branches.

I'm not sure if I was meant as a future direct service or just one with a convenient connecting timetable but Transport for Wales is keen on properly connecting Wrexham Central and stations along the way like Shotton and Hope to Liverpool. Again not sure if they meant extending trains beyond Bidston or just making the 2 lines connect more conveniently.

Anyway I drew a rough idea on the Merseyrail Map of what I think should happen for a truly effective regional network.

Ellesmere Port - Extend to Helsby and Warrington Bank Quay. Enables easier access to WCML for areas south of the Mersey.
Lime Street to Warrington Central - 1/2 of these are extension of Hunts Cross trains and 1/2 via Mossley Hill
Lime Street to Wigan North Western - Finally putting St Helens on Merseyrail!
Headbolt Lane to Wigan Wallgate - One through service to end severance
Ormskirk to Preston - As above

And Stopping Services between Lime Street and Manchester Victoria via Earlestown as a joint service ran by both Merseyrail and the Bee Network.

I think any changes to Merseyrail have to make it easier for people living near intermediate and smaller stations to access the mainline, currently every line forces people to go to Lime Street to change trains for further afield.
Manchester always gets mentioned in regardless to Liverpool but I think Liverpool needs better trains and the infrastructure to make it happen improving services to places in Cheshire, Lancashire, North Wales and the Midlands too. I did 1 Liverpool to Birmingham train once and never again, it was a miserable experience, so overcrowded and not often enough for the demand.
I find it very odd too how Merseyrail just ends at stations when there is a more useful destination not much further on, stopping at an administrations boundary seems something frkm a different age. At least they extended from Hooton, and look how that has done. Again before it was a funny DMU service. People are put off using rail, when changing is involved.
 
Last edited:

TheSel

Member
Joined
10 Oct 2017
Messages
1,168
Location
Southport, Merseyside
Gateacre could be connected from Hunt's Cross by a relatively cheap short non-electrified single line extension, served by class 777 BEMUs. It is a densely populated suburb within Merseyside, whose current bus services to Liverpool city centre are slow and suboptimal. There would be room to preserve a footpath/cycle path alongside the reopened line, as the original formation was double track.
Its a crying shame that Merseyrail didn't reach Gateacre years back. If it could be done now, and I dont know the area well enough, I'd say do for sure. That whole area Gateacre, Woolton , Childwall, is densely populated , with only buses to the city and a lot of traffic. It would enable people to change at South Parkway easily too for onward connections.

It's not just a footpath, though. It's a footpatrh, cycleway and bridleway.

Is it technically possible? Probably.
Is it realistic? Probably not.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,603
Location
Dunham/Bowdon
I'd not call Wigan Wallgate rural. It would also mean a station actually in Skelmersdale (albeit on the southern edge). The line is quiet at present due to the not very useful service, but quite a few places it serves are urban.

Rainford is fairly rural, but an expansion of Rainford Junction with an ecovillage/ecotown could help with planning gain funding.
My previous post referred to most (not all) of the proposed extensions outwith Merseyside. I agree that extending Merseyrail from Headbolt Lane to Wigan Wallgate would probably be worthwhile.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,365
Merseytravel answers to Liverpool City Region now, not Merseyside.

LCR gets rather close to Warrington.
 
Joined
13 Apr 2011
Messages
649
Location
Helsby
I'm not sure that there is an obvious location for a Park and Ride. Railtrack flogged off the obvious land for "exec" homes.
A mate of mine owns the farm behind the station and did mention that many years ago someone from from Network Rail had been to see him regarding land for car parking. We are taking many years ago now. Of course if the price is right........
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
The main obstacle for Gateacre is that some idiot/wilful vandal* decided to plonk a signalling building right across the trackbed at the end of the platform at Hunts Cross and that might have to be relocated if we wanted to keep things segregated. Though I suppose it would be possible for Merseyrail to use the main platforms if just going through.
I would certainly be possible to four track to Hale and put Northern Trains on the northern pair and Merseyrail on the Southern pair.
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,039
Location
Frodsham
My previous post referred to most (not all) of the proposed extensions outwith Merseyside. I agree that extending Merseyrail from Headbolt Lane to Wigan Wallgate would probably be worthwhile.
Absolutely. Friends of mine live at Rainford. They currently go to St Helens to take a train to Liverpool. Using Rainford Station is deemed by them too unreliable. Was a lost opportunity only going to Headbolt Lane.
 

urbophile

Established Member
Joined
26 Nov 2015
Messages
2,482
Location
Liverpool
Its a crying shame that Merseyrail didn't reach Gateacre years back. If it could be done now, and I dont know the area well enough, I'd say do for sure. That whole area Gateacre, Woolton , Childwall, is densely populated , with only buses to the city and a lot of traffic. It would enable people to change at South Parkway easily too for onward connections.

== Doublepost prevention - post automatically merged: ==


I find it very odd too how Merseyrail just ends at stations when there is a more useful destination not much further on, stopping at an administrations boundary seems something frkm a different age. At least they extended from Hooton, and look how that has done. Again before it was a funny DMU service. People are put off using rail, when changing is involved.
I can't see any insuperable obstacle to extending to Gateacre or even further. Unlike in many other cases, the trackbed has not been built over (apart from the signal box which admittedly would be a pain, though possible, to relocate). A single track line would be easily compatible with the present cycle path. Hunts Cross/ west Halewood is a fairly densely populated suburb.

Politically, stepping at or near the authority boundary is understandable if an extension is dependent on local authority funding. The LU Met extension to Watford Junction didn't happen for that reason. In fact, neither of the Merseyrail end-on junctions are at an administrative boundary. Ormskirk is several miles into Lancashire and was always an obvious commuter terminus. Kirkby, and now Headbolt Lane, is one stop before Rainford which is still in Merseyside.
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,039
Location
Frodsham
I can't see any insuperable obstacle to extending to Gateacre or even further. Unlike in many other cases, the trackbed has not been built over (apart from the signal box which admittedly would be a pain, though possible, to relocate). A single track line would be easily compatible with the present cycle path. Hunts Cross/ west Halewood is a fairly densely populated suburb.

Politically, stepping at or near the authority boundary is understandable if an extension is dependent on local authority funding. The LU Met extension to Watford Junction didn't happen for that reason. In fact, neither of the Merseyrail end-on junctions are at an administrative boundary. Ormskirk is several miles into Lancashire and was always an obvious commuter terminus. Kirkby, and now Headbolt Lane, is one stop before Rainford which is still in Merseyside.
Yes i understand that, but these days perhaps authorities ought to be working together a bit more for the greater good. The LU Met continues to Amersham and Chesham and the Central to Epping ( and Ongar at one point) all way out of the London area. A Gateacre extensions would be a very useful addition. Is anywhere else possible on the the north end of that loop line , or all built over now ?
 

KevinTurvey

Member
Joined
9 Oct 2016
Messages
265
Yes, they might as well. Just spend £5 million on a footbridge and lifts at Headbolt Lane and £20 or £30 million on 2 or 3 additional 777s. It's only money and might as well is a perfect justification for wasting it.

My argument was that as the 150s etc date from 1986 and are becoming obsolete, they would need replacing anyway, so one cost would simply offset the other, and in the grand scheme of things a station footbridge at Headbolt La is surely not a major infrastructure project.
 