• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GBRf Class 99 - 30 locomotives now ordered

Rail Quest

Member
Joined
8 Apr 2023
Messages
757
Location
Warrington

Attachments

  • Screenshot_20250826-082808.png
    Screenshot_20250826-082808.png
    443.1 KB · Views: 80
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Class15

Established Member
Joined
30 Dec 2021
Messages
4,140
Location
North London or Mildmay line
Wow! They’ve got the approval to not use Q headcodes for 99 drags very quickly in that case! (I realise the 99s under their own power still need Q headcodes)
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,910
Location
Cambridge, UK
A couple of videos of the overnight/early morning electric test runs on the GEML (not mine):


 
Last edited:

Adrian Barr

Member
Joined
2 Jul 2020
Messages
776
Location
Doncaster
if anyone knows how 99001 got from Whitemoor to Peterborough yesterday I would definitely like to know please, as I'm trying to keep a record of all their movements.

Class 99 loco movements in TOPS for August:

99001
04/08 0Q55 Litchurch Lane - Leicester TMD
21/08 0Q99 Leicester TMD - Peterborough
21/08 0G99 Peterborough - Whitemoor
25/08 0E57 Whitemoor - Peterborough
25/08 4Q90 Peterborough - Ipswich Yard
25/08 4Q91 Ipswich Yard - Temple Mills Loop
26/08 4Q92 Temple Mills Loop - Ipswich Yard
26/08 4Q96 Ipswich Yard - Peterborough

99002
25/08 0Q90 Leicester - Peterborough

History was made for the 99's on Thursday 21st August 2025. 0Q99 Leicester - Peterborough was 99001+47739. The 99 was leading and powered on either diesel or HVO with the 47 trailing, so this was the first movement of a 99 under diesel or HVO power on the mainline.

Nice to know they're out and about on diesel power on the main line. I saw one of the late night electric test runs with 99001 (4Q90 25th July) from the bridge overlooking Doncaster Down Decoy. It arrived on electric power in the former mail platform at Doncaster RMT, pantograph went down, then did the run round on diesel (or HVO...) power. The most noticeable thing was how loud the fans were on the roof (which must have sounded louder due to standing above the loco on a bridge). With a light on inside the part of the loco visible through the bodyside grill, it reminded me of a gaming PC with the cooling fans on full power! It was hard to hear the engine over the fan noise, but the guy next to me on the bridge thought it sounded decent.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,532
Location
Northampton
Wow! They’ve got the approval to not use Q headcodes for 99 drags very quickly in that case! (I realise the 99s under their own power still need Q headcodes)
The 99s are a pretty standard gauging profile so if being dragged is there any reason they'd need to be on 'must run on booked lines unless specially authorised' headcodes? If they were out of gauge, they should be on an X headcode...
 

Rail Quest

Member
Joined
8 Apr 2023
Messages
757
Location
Warrington
With a light on inside the part of the loco visible through the bodyside grill, it reminded me of a gaming PC with the cooling fans on full power!
Haha I like this. Shame the lights aren't RGB!

It was hard to hear the engine over the fan noise, but the guy next to me on the bridge thought it sounded decent.
That sounds promising. I've not seen any footage of the loco powering on diesel yet. I'm hoping someone's caught yesterday's test run departing Peterborough.
 

Suraggu

Member
Joined
23 Oct 2013
Messages
1,083
Location
The Far North
The 99s are a pretty standard gauging profile so if being dragged is there any reason they'd need to be on 'must run on booked lines unless specially authorised' headcodes? If they were out of gauge, they should be on an X headcode...
They don’t have type approval so any moves they partake/haul have to be under a Q head code alongside the appropriate NRSC document.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,910
Location
Cambridge, UK
Both 99001 and 99002 are out on test tonight together.


My video of them passing through Ely station around 22:25, with 69006 and 69008 also along for the ride:


== Doublepost prevention - post automatically merged: ==


Tonight's runs in RTT:


This may be a Thursday night test run to Doncaster, "Pathed as Diesel locomotive, trailing load 1200 tonnes":

 
Last edited:
Joined
7 Aug 2025
Messages
354
Location
Portsmouth
Just wondering, missed seeing the 99 at the Greatest Gathering (I blame the Eurostar - as it was my prime "want to see", and ended up missing that whole area!). Seen the video clips of night running, is there anywhere you can see the 99s at the moment during the day/weekend? Thanks
 

Obar123

Member
Joined
16 Aug 2024
Messages
116
Location
Cambridgeshire
Seen the video clips of night running, is there anywhere you can see the 99s at the moment during the day/weekend? Thanks
Both at Peterborough during the day today and tomorrow and then off to Doncaster Thursday night. There are no onward paths at the moment from there on the system yet.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,910
Location
Cambridge, UK
Both 99001 and 99002 are out on test tonight together.
Same again tonight (plus 69006 and 69008 along for the ride) according to RTT.

== Doublepost prevention - post automatically merged: ==

Same again tonight (plus 69006 and 69008 along for the ride) according to RTT.
...except that now RTT is listing the runs as 'cancelled due to waiting for train preparation or completion of TOPS list (AC)'.

== Doublepost prevention - post automatically merged: ==

A video from '32A Productions' of the Tues/Wed overnight runs, with diesel running through Kennett (0:00) and Stowmarket (0:56):


Also, assuming these are 99 test runs, tonight's 4Q92 to Doncaster:
...now has a 4Q93 return working in RTT:

== Doublepost prevention - post automatically merged: ==

This is a move for both 99s to Leicester LIP (running about 11 minutes late at the moment):


== Doublepost prevention - post automatically merged: ==

Re. timescales for deliveries/testing/entry into service/economics of 99s versus 66s, a couple of quotes from an article by Tony Miles in the September Modern Railways (Mr. Smith = John Smith, GBRf CEO, speaking at the 17th July cl. 99 launch event at Peterborough):

Testing and training for the '99s' is expected to continue for some time, with No 99003 due to arrive in the UK during October (Modern Railways, August 2025) after which deliveries will be ramped up to around two per month.
Mr Smith said entry into service will need at least six locomotives to be available; four working trains and two as cover, noting that once a timing has been adjusted to reflect the improved performance over a Class 66 it would not be possible to substitute a '66'for a '99' without impacting performance.
Their bi-mode capabilities will come at a price as at over £5 million each, the cost of acquiring and using the locomotives is significant - roughly three times the cost of a Class 66 per month. Since the Class 99 was unveiled, Freightliner has indicated that it is looking at the locomotives but according to CEO Tim Shoveller, the tight margins in freight make it very difficult to make a business case for their acquisition

There's a few interesting quotes from John Smith re. electrification, loco design costs and 6 axles versus 4 in the article too.
 
Last edited:

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,374
Location
belfast
I'm not surprised that 99s are more expensive than 66s, and they have features that make up for that to some extend, including the higher power, but triple the cost is a very big delta!
 

Unobrow

Member
Joined
19 Nov 2024
Messages
232
Location
Manchester
Whilst the 99’s are going to obviously be an expensive initial outlay, surely they offer much more than a new locomotive over a 66? The fact they can accelerate heavy trains of 2000+ ton (up) to 75mph, and maintain that would mean new faster paths for freight. I’d like to think more companies would find that attractive and use rail as a preferred option. They must surely be more efficient and hopefully much more reliable (although a 66 is still pretty damned good in that respect considering their age and useage).

Can we deduce Mr Shoveller may be looking at the 93 as a cheaper option? Does anyone know the cost of a 93 over a 99 (no ice cream wisecracks thanks………:lol::))?
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,257
Whilst the 99’s are going to obviously be an expensive initial outlay, surely they offer much more than a new locomotive over a 66? The fact they can accelerate heavy trains of 2000+ ton (up) to 75mph, and maintain that would mean new faster paths for freight.
On electric, a backwards step in performance on diesel.
I’d like to think more companies would find that attractive and use rail as a preferred option. They must surely be more efficient and hopefully much more reliable (although a 66 is still pretty damned good in that respect considering their age and useage).

Can we deduce Mr Shoveller may be looking at the 93 as a cheaper option? Does anyone know the cost of a 93 over a 99 (no ice cream wisecracks thanks………:lol::))?
The 93 isn't operated by GBRf, hence the only options for performance assessment of modern multi-mode locomotive with potential cooperative operator is with ROG, it is that simple...
 

Unobrow

Member
Joined
19 Nov 2024
Messages
232
Location
Manchester
On electric, a backwards step in performance on diesel.

The 93 isn't operated by GBRf, hence the only options for performance assessment of modern multi-mode locomotive with potential cooperative operator is with ROG, it is that simple...
You’d only use the diesel on “last mile” or shunting operations generally though. An example would be in container terminals that aren’t wired, or other yards where you’re shunting at low speed. They could be extensively used on the West Coast to great effect.

I was talking about FL’s options of using them from the articles that ac6000cw had put up, as opposed to GBRf using the 93’s.
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,140
Location
North London or Mildmay line
Can we deduce Mr Shoveller may be looking at the 93 as a cheaper option? Does anyone know the cost of a 93 over a 99 (no ice cream wisecracks thanks………:lol::))?
Freightliner are looking at 93s for container traffic out of London Gateway, and customer trials are, according to ROG, ‘starting soon’.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,257
I was talking about FL’s options of using them from the articles that ac6000cw had put up, as opposed to GBRf using the 93’s.
So was I - GBRf aren't going to loan a 99 to FL are they! Hence a 93 from ROG is the only option...
A 93 will struggle with long container services on the northern WCML due to the large aerodynamic drag /rolling resistance and sustained steep gradients (not tested so far...) but Gateway - Crewe will be fine.

== Doublepost prevention - post automatically merged: ==

But most of the lines where acceleration to 75mph actually matters are already electrified.
Felixstowe - Peterborough via Ely and v/v performance on diesel won't be spectacular and challenging to run in day time.
 
Last edited:

Class15

Established Member
Joined
30 Dec 2021
Messages
4,140
Location
North London or Mildmay line
Is there a link to a reliable source that states that please?
Yes - here regarding 93s and Freightliner:
Freightliner is considering trialling the use of one of Rail Operations Group’s Class 93 tri-mode locomotives on an intermodal service to assess its capabilities, Modern Railways understands, while the operator has also purchased two Class 90 locos put up for sale by DB Cargo.

ROG has ordered 10 ‘93s’ from Stadler as part of a framework agreement for up to 30 new locos. The 110mph locos have overhead electric capability, a Caterpillar C32 diesel engine and two Lithium Titanate Oxide (LTO) traction battery packs to supplement the engine and enable last-mile emission-free shunting operation. So far only one ‘93’ has been delivered to the UK; it moved from Worksop to Crewe for static testing in January, but main line testing had yet to commence, and how the locos will be used is also unclear.

While it had been rumoured Freightliner was looking to take on eight of the 10 ‘93s’, it is understood the operator wishes to explore the ability of the new locos before making a firm commitment. Key requirements would be the ability of the diesel engine/battery combination to haul an intermodal train from Felixstowe over the non-electrified branch to Ipswich, and whether the capability in electric mode would match the performance of a pair of ‘90s’ on the steep climbs on the northern stretches of the West Coast main line.

Freightliner’s only non-diesel traction at present is its Class 90 electric locos. DB Cargo has stood down its ‘90s’ as part of changes being implemented through its ‘transformation plan’ and has put the locos up for sale. Some have been out of use for some time, while others were withdrawn more recently; it is understood Freightliner has secured two of the latter examples which are in a better condition.
More recently I have heard from a source (not public) that they are planned to be trialled out of Gateway and that Felixstowe is going to be difficult for the 93s.

Felixstowe - Peterborough via Ely and v/v performance on diesel won't be spectacular and challenging to run in day time.
I suspect all container trains hauled by 99s out of Felixstowe will have to run via London. Don’t know for sure, but it seems a bit much to use a Class 37 equivalent on 775m intermodals.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,257
Yes - here regarding 93s and Freightliner:

More recently I have heard from a source (not public) that they are planned to be trialled out of Gateway and that Felixstowe is going to be difficult for the 93s.
Felixstowe branch is a non-starter for 93 use.
I suspect all container trains hauled by 99s out of Felixstowe will have to run via London. Don’t know for sure, but it seems a bit much to use a Class 37 equivalent on 775m intermodals.
Class 47 equivalent
 

Richard Scott

Established Member
Associate Staff
International Transport
Railtours & Preservation
Joined
13 Dec 2018
Messages
4,581
On electric, a backwards step in performance on diesel.
I doubt it's a backward step with 3 phase AC drives compared to DC drive. May be down on output power on diesel but won't make a massive difference in the real world. Seem to remember when the 58s came out there was a comment that freight locos spend only around 3% of their time at full power.

== Doublepost prevention - post automatically merged: ==

Class 47 equivalent
I'm willing to bet a 99 has vastly superior performance to a 47 on diesel.
Output power of the diesel engine isn't the only factor in performance.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,257
I doubt it's a backward step with 3 phase AC drives compared to DC drive. May be down on output power on diesel but won't make a massive difference in the real world.
Is is a problem on route where you need max power though.

Seem to remember when the 58s came out there was a comment that freight locos spend only around 3% of their time at full power.

== Doublepost prevention - post automatically merged: ==

Things have move on a lot since the Class 58 era.
I'm willing to bet a 99 has vastly superior performance to a 47 on diesel.
Output power of the diesel engine isn't the only factor in performance.
That is why I used at the wheel comparison.
The 99 will be much better below 20mph but barely any difference above 20mph.
 

Top