• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

TfL possible long term funding settlement @ June Spending Review

Status
Not open for further replies.

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,545
I wonder why it's 2026-2027 and 2029-2030 for funding, what's happening in 2027-2028?
It means April 2026 - March 2030. So that's £550m/year* on average.

* Slightly different quote elsewhere in the SR (difference of £200m):
  • Providing the largest multi-year settlement for London in over a decade, with £2.2 billion of funding between 2026-27 and 2029-30 for Transport for London’s capital renewals programme.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,902
Location
London
I wouldn't be surprised if the Bakerloo order will be announced once the new Piccadilly Line trains are in service. Not sure about the trams as I believe the procurement process is still ongoing but I think they said it'll be announced who won the tender early next year.
 
Last edited:
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
I wouldn't be surprised if the Bakerloo order will be announced once the new Piccadilly Line trains. Not sure about the trams as I believe the procurement process is still ongoing but I think they said it'll be announced who won the tender early next year.
Once the new Piccadilly Line trains what?

== Doublepost prevention - post automatically merged: ==

From reading some comments from Andy Lord, it looks like the Piccadilly Line new signalling won't be happening, which is a shame.

He says:
And it will mean that we can complete the introduction of new trains on the Piccadilly line and DLR and new signalling on 40 per cent of the Tube, can procure a new tram fleet, progress discussions on new Bakerloo line trains and can get to work on renewing some of London’s critical roads, tunnels and flyovers.
No mention of Piccadilly Line new signalling.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,439
Location
Hertfordshire / Teesdale
Once the new Piccadilly Line trains what?

== Doublepost prevention - post automatically merged: ==

From reading some comments from Andy Lord, it looks like the Piccadilly Line new signalling won't be happening, which is a shame.

TfL have got themselves into a difficult position over the Piccadilly Line, as the Thales CBTC system is essentially the only viable product. This isn’t ideal from a bargaining point of view. It absolutely wouldn’t surprise me to see Picc Line resignalling merely placed in the “too difficult” and “someone else’s problem” boxes.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,392
That would cost £1 billion yeah?
Piccadilly line was apparently £1.5bn for 94 trainsets, but in current terms is no doubt more than that. How many Bakerloo trainsets are needed? Would it actually be an increase on the current fleet size? 36 would still hopefully be less than £1bn.
 

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,902
Location
London
Piccadilly line was apparently £1.5bn for 94 trainsets. How many Bakerloo trainsets are needed? Would it actually be an increase on the current fleet size? 36 would hopefully be less than £1bn.
They'd need more than 36 if the BLE gets the greenlight. I think they wanted to have 40 Bakerloo Line trains but they'd have to upgrade the depots to do so,
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,545
Does "progress discussions on Bakerloo line trains" mean they will order them?
If funding for new Bakerloo trains was secured they'd say so. The quote suggests they're closer to getting there but further talks will be needed.

As a reminder - from March last year (Mayor's Question Time):
The existing Deep Tube rolling stock contract with Siemens currently being used for the Piccadilly line upgrade programme contains options for the Bakerloo, Central and Waterloo & City lines. The cut-off date for exercising the option for the Bakerloo line and avoiding an extended break in production is 1 November 2026. Prior to this, Transport for London will need a commitment for capital funding to allow us to begin essential supporting infrastructure and depot works required for the new trains with a commitment from Government sought by Spring 2025 to enable us to begin procurement activities in these areas.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,567
Location
Lichfield
Without signalling upgrades, perhaps a dozen or so of those can be diverted to the Bakerloo (before being built to Piccadilly spec).

Wikipedia states there are 87 sets of 73 stock, so if you divert 12 of the new trains to the Bakerloo, you end up with 82 new trains to replace 87 old trains...

Not sure how realistic that proposal is.
 
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
Without signalling upgrades, perhaps a dozen or so of those can be diverted to the Bakerloo (before being built to Piccadilly spec).
94 trains is the amount for the existing signalling - if CBTC was implemented then an order for some additional would be put in (according to pre-existing plans)
 

Geogregor

Member
Joined
16 Sep 2016
Messages
459
Location
London
Reply from the TfL to the spending review:


It will allow us to deliver a programme of sustainable investment, aligning our suppliers around a longer-term programme. And it will mean that we can complete the introduction of new trains on the Piccadilly line and DLR and new signalling on 40 per cent of the Tube, can procure a new tram fleet, progress discussions on new Bakerloo line trains and can get to work on renewing some of London’s critical roads, tunnels and flyovers.

"Progress discussions", make of it what you will...
 

Sonic1234

Member
Joined
25 Apr 2021
Messages
795
Location
Croydon
The fact is that low income people living in outer zones of London are penalised with incredibly high fares, now around £14 return in peak time from zone 6 into zone 1
And differs depending on the mode of travel. Someone in North London Zone 6 using the tube to get into the centre will pay less than someone in South London using National Rail (and it's even worse if its "mixed mode": National Rail and Tube)
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,795
Location
Somewhere, not in London
Piccadilly line was apparently £1.5bn for 94 trainsets, but in current terms is no doubt more than that. How many Bakerloo trainsets are needed? Would it actually be an increase on the current fleet size? 36 would still hopefully be less than £1bn.
One also needs to consider the current depots could not maintain this new type of train.
 

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,902
Location
London
The preferred supplier for the Trams won’t be announced until Spring 2026 but I assume that since it’s not bespoke, it’ll take less time to manufacture and be tested.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,795
Location
Somewhere, not in London
The preferred supplier for the Trams won’t be announced until Spring 2026 but I assume that since it’s not bespoke, it’ll take less time to manufacture and be tested.
It's not bespoke until TfL get their mits on the spec and add in loads of style choices rather than just going to the likes of Alstom, CAF or Stadler and saying, "30 of them plz, that length."
 

boiledbeans2

Member
Joined
15 Oct 2020
Messages
978
Location
UK
hjalr32pq26f1.jpeg



Why should TfL have to keep trying to fund everything from fares when most other networks in the world get government support?

How does farebox recovery ratio relate to the above diagram?

According to wiki, farebox recovery ratio is defined as "fraction of operating expenses which are met by the fare paid by passengers"
LU is at 129% in the page above, which means the fares more than fully cover the operating expenses.
 

Geogregor

Member
Joined
16 Sep 2016
Messages
459
Location
London
How does farebox recovery ratio relate to the above diagram?

According to wiki, farebox recovery ratio is defined as "fraction of operating expenses which are met by the fare paid by passengers"
LU is at 129% in the page above, which means the fares more than fully cover the operating expenses.

I think the graph, despite the title, shows the whole of TfL, not just underground. LU has surplus but it covers for deficits in other parts of the TfL
 

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,902
Location
London
The Elizabeth Line must generate a surplus as well. I think it's buses and the Tram which has deficits.
 
Last edited:

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,588
Buses generally have the biggest deficits and also stagnant ridership plus rising tender costs at the moment.

Tube and Liz line bring in money. Not sure about rail overall. DLR might have but currently a bit of a sticky situation with new train delays.
 

GFE

Member
Joined
6 Jun 2024
Messages
145
Location
HA4
Suspect the Bus tender costs include the capital cost of the buses (amortised over the contract period) and these are going up as a result of the Mayors policy to actively/rapidly transfer to using electric vehicles.
Does anyone know how much of the £2 Billion is needed to pay for ongoing contracts/Projects? (Picc trains, Picc Infrastructure works, DLR upgrade, 4LM signalling etc ) then we can perhaps calculate what is available to pay for new project work undertaken during that period (ie BLU enabling/design)
 

TrenHotel

Member
Joined
31 Jul 2011
Messages
210
Location
London
London mayor Sir Sadiq Khan has been told that Transport for London fares should rise by the RPI rate of inflation – currently 4.3 per cent – plus one per cent in each of 2026, 2027, 2028 and 2029. This is in return for TfL receiving almost £2.2bn of cash in the Chancellor Rachel Reeves’s comprehensive spending review earlier this month to spend on infrastructure over the next four years.

 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,323
Location
London

As a payer of TfL fares, I can't say I disagree with HMG. The 2016 fares freeze made DfT-set season fares unattractive and ultimately resulted in TfL losing revenue. In general an all-day should be 2 peak singles, and a weekly should be 4 all days. TfL's ratios are way off. Also the £1.75 bus fares are simply unsustainable.
 
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
As a payer of TfL fares, I can't say I disagree with HMG. The 2016 fares freeze made DfT-set season fares unattractive and ultimately resulted in TfL losing revenue. In general an all-day should be 2 peak singles, and a weekly should be 4 all days. TfL's ratios are way off. Also the £1.75 bus fares are simply unsustainable.
London has the most expensive fares in the world….
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,323
Location
London
Paris fares are just hidden in higher taxes especially employer taxes.
 

signed

Established Member
Joined
13 May 2024
Messages
2,388
Location
ROI
Paris fares are just hidden in higher taxes especially employer taxes.
Even if you doubled the Paris fares to account for the employer 50% and others, you still wouldn't break the 200€/month for full network, which is extremely cheap compared to a Z1-6 TC (which is £313, 365.38€)

A Swiss GA Travelcard for the whole country is only 2x the price of a Z1-6 annual
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,323
Location
London
Even if you doubled the Paris fares to account for the employer 50% and others, you still wouldn't break the 200€/month for full network, which is extremely cheap compared to a Z1-6 TC (which is £313, 365.38€)

A Swiss GA Travelcard for the whole country is only 2x the price of a Z1-6 annual

Switzerland the same population as Greater London.

If you measure your utility as a function of the size of market accessed rather than the physical distance you travel to access the said market, then in London you pay half of what you pay in Switzerland for the same privilege.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,392
In general an all-day should be 2 peak singles, and a weekly should be 4 all days.
The all day was set to one-fifth of the weekly price to avoid discriminating against part time workers. That principle is now largely set in stone.

From outer zones, the all-day currently caps two NR scale peak journeys but not two LU scale peak journeys. The all day cap is only defined for zone 1 centric travel, whereas weekly capping applies for a wider range of zonal combinations.
 
Status
Not open for further replies.

Top