Obviously it was planned. But I thought the Waterloo and North Downs trains struggled anyway with only three (4,5,6) platforms available.
They did before SWR switched to using the leaf-fall timetable all year round for the Waterloo - Readings. Other than for events, down Waterloo trains no longer cross up Waterloo trains in the platforms at Reading . Prior to that, SWR required two platforms at Reading.