zwk500
Veteran Member
OK, interesting.As far as the grid or frequency converter is concerned it remains a single phase load, it is just that the traction side of the transformer has a centre tapped winding rated for 50kV end-to-end. The rail return is coupled to the centre tap and the two contact wires are connected to the end windings.
I still don't see why this is going to be worth doing above having fast-charge points with a battery supply trickle-fed from the local grid. 20 Miles just feels like too short a length of OLE to be worthwhile with. The 'discontinuous' electrification ideas should be much more about skipping over gaps or between actually electrified areas, or avoiding the need to wire a low-frequency branch, rather than providing random gaps in an otherwise electrified line. IMO the electrification network should aim to remain contiguous as far as possible.Within an island, no.
But if you use AT feeding you can use an inexpensive distribution line to interconnect all the islands and feed them either with two SFCs at different sites, or with a single SFC and a single phase feed from an existing 25kV installation.
Liverpool-Norwich, Birmingham-Stanstead or Oxford-Cambridge (although this should be fully electrified at it's proposed frequencies) would be examples of the former. Matlock and Windermere would be examples of the latter (although again, Windermere is arguably suitable for actual electrification).