No, 5 sets are planned out Tuesday and Friday as it stands, just that 1 diagram on Wednesday and Thursday.@sd0733 are there any vices planned for Tuesday do you know? TIA.
Many thanksNo, 5 sets are planned out Tuesday, Thursday and Friday as it stands, just that 1 diagram on Wednesday.
Usual disclaimers apply!!
Hoping that continues into Saturday, surprised HD02 is still going quite strongly!No, 5 sets are planned out Tuesday, Thursday and Friday as it stands, just that 1 diagram on Wednesday.
Usual disclaimers apply!!
HD02 has been surprisingly trouble free recently (hopefully not just jinxed it)! HD02 will be out of service on Wednesday and Thursday but should be back Friday. Saturday as things stand should have 6 sets available with a spare at Crewe, 4 normal diagrams plus the rugby special.Hoping that continues into Saturday, surprised HD02 is still going quite strongly!
Oh brilliant, hoping for a comfy ride return to Cardiff aboard 1V46 then... unfortunately a 197 up to Crewe but I'll endure I'm sure...HD02 has been surprisingly trouble free recently (hopefully not just jinxed it)! HD02 will be out of service on Wednesday and Thursday but should be back Friday. Saturday as things stand should have 6 sets available with a spare at Crewe, 4 normal diagrams plus the rugby special.
On Wed is it definitely the diagram which involves the 0853 CDF-MAN that will be subbed or is just one of possible two diagrams that could be subbed?No, 5 sets are planned out Tuesday and Friday as it stands, just that 1 diagram on Wednesday and Thursday.
As good as a definite it'll be that one unfortunately. With HD01 being on the lathe it's Crewe that will be a set short.On Wed is it definitely the diagram which involves the 0853 CDF-MAN that will be subbed or is just one of possible two diagrams that could be subbed?
The main reason for me wanting to upgrade was to experience the cooked breakfast. So it will just have to wait for another time if thats the case. At least if i know for sure I can take a sandwich with me as all the trolley will have is crisps and snacks if indeed there is a trolley!
Looks like it's there until Wednesday now when it will head down to the ETD for its appointment at the lathe.HD01 with 67017 is at Crewe ATC at the moment.
Ah okay. Id rather know in advance as at least it wont be so disappointing on the day. And looking on the bright side ive saved the costs (although will do it at some point no doubt!) as would likely only buy a coffee and a snack off the trolley.As good as a definite it'll be that one unfortunately. With HD01 being on the lathe it's Crewe that will be a set short.
HD02 coming to Crewe depot for it's A exam.HD02 has been surprisingly trouble free recently (hopefully not just jinxed it)! HD02 will be out of service on Wednesday and Thursday but should be back Friday. Saturday as things stand should have 6 sets available with a spare at Crewe, 4 normal diagrams plus the rugby special.
Yes, it's stopped Wednesday and Thursday for that.HD02 coming to Crewe depot for it's A exam.
The rare situation where the 1st class advance was cheaper than the standard today between Port Talbot and Cardiff on 1W13. Back to standard the rest of the way north though. Sadly the catering doesn't start that early, but it is a nice seat.
Always good to have a Mk4, but the 197s are perfectly good as long as they have more than 2 carriages.
No catering as in no free tea or coffee? I can understand them not having the full restaurant service at that time in the morning but when selling first class tickets they really should provide the basics, hot drinks and snacks. No wonder the ticket was cheap if all you are getting is a nicer seat!
I understand its difficult but from a customers point of view it just seems poor and doesnt really encourage people to upgrade to First class on certain journeys unless the advance ticket is the same or cheaper than standard.The Mk4 catering staff are based at Newport (and Manchester, but Newport for 1W13) and have no way of getting to Swansea for that run. It is a shame there is some gaps in catering for certain runs, 1V31 is the same from Crewe of a morning, but without extra outstations of catering crews it’s as good as possible at the moment.
It makes me wonder if the Swansea service is really worth the effort given the issues with the catering, overnight engineering works sometimes meaning its replaced by a unit as the ECS goes via the VOG and the issue with Canton not being able to take the evening Swansea ECS at the same time as the 1830 arrival from Manchester. The 05xx is also a bit early for most people unless its a day trip and even then its a bit too early for most people. The Sunday timetable is better as it offers 2 trains in each direction but I know this is only possible as there are far fewer diagrams on a Sunday and therefore not the 2 hourly pattern between Cardiff and Manchester.IF someone is determined to get a first-class experience then the GWR will have catering and a connection can be made at Cardiff/Newport with few problems.
It is still the case that most operators of the full-service first class would have catering depots at all ends of their routes. In GWR case that would probably mean Swansea rather than Carmarthen though.
There is probably a note in the timetable about 1W13, but it wasn't something I would have checked as I was just getting whatever was the cheapest ticket. Interestingly Stockport to Manchester Piccadilly was also cheaper than a single and the splitting tickets told me to buy that. However, I now realise that TfW limits to 4 tickets per transaction and it hadn't completed. So no upgrading for the final 10 minutes today.
My last attempt at first-class north of Newport ended with cancellations and having to go via Birmingham. Got a big refund for that one.
HD01 has had some attention and is now permitted to run prior to it visiting the lathe so there are now 5 sets expected out both Wednesday and Thursday so all workings should now be covered so you should now get a Mk4 after all.Im really hoping my journey tomorrow isnt overcrowded, I remember when it used to run from Milford Haven and arrive in Neath around 8am to go to Manchester it was the Neath-Cardiff part that was busy and overcrowded especially as it called at the likes of Pyle and Llanharan and people we having a 9am start in Cardiff. It used to ease off after Cardiff and only really get busy again after Shrewsbury. It was usually a 3 car however
Planned back to TfW tomorrow along with 67022. 014 should replace 67017 on HD01 tomorrow night, re-entering service on Thursday while 022 should replace 015 on HD05.0G20 & 0K21, 67014 test run
Crewe to Stafford & Rtn
Excellent.news, thanks very much for letting me know! Keeping my fingers crossed no last minute failures tomorrow morning!HD01 has had some attention and is now permitted to run prior to it visiting the lathe so there are now 5 sets expected out both Wednesday and Thursday so all workings should now be covered so you should now get a Mk4 after all.
No problem. Hopefully not! Hope its a good trip.Excellent.news, thanks very much for letting me know! Keeping my fingers crossed no last minute failures tomorrow morning!
Thank you!No problem. Hopefully not! Hope its a good trip.
Planned back to TfW tomorrow along with 67022. 014 should replace 67017 on HD01 tomorrow night, re-entering service on Thursday while 022 should replace 015 on HD05.
015 and 017 will then head back to Crewe ETD for maintenance.
Yes. They could just move the train a bit earlier and run it as a 197. As long as the connection at Cardiff works. When I did it last week it was tight because the 197 was running in the current path, but presumably it could go back to being 05:36 from Cardiff (or even 05:32 as it was for a while).It makes me wonder if the Swansea service is really worth the effort given the issues with the catering, overnight engineering works sometimes meaning its replaced by a unit as the ECS goes via the VOG and the issue with Canton not being able to take the evening Swansea ECS at the same time as the 1830 arrival from Manchester. The 05xx is also a bit early for most people unless its a day trip and even then its a bit too early for most people. The Sunday timetable is better as it offers 2 trains in each direction but I know this is only possible as there are far fewer diagrams on a Sunday and therefore not the 2 hourly pattern between Cardiff and Manchester.
Yes if someone really wanted first class throughout and was prepared to pay for a non advance ticket they could use GWR/Crosscounty via Birmingham or GWR and then TFW from Newport.
Im really hoping my journey tomorrow isnt overcrowded, I remember when it used to run from Milford Haven and arrive in Neath around 8am to go to Manchester it was the Neath-Cardiff part that was busy and overcrowded especially as it called at the likes of Pyle and Llanharan and people we having a 9am start in Cardiff. It used to ease off after Cardiff and only really get busy again after Shrewsbury. It was usually a 3 car however.
I know it's very wishful thinking but a 5 coach MK4 set would be great for me at Llanharan, even though I'm well aware that isn't possible, one can dream...Im really hoping my journey tomorrow isnt overcrowded, I remember when it used to run from Milford Haven and arrive in Neath around 8am to go to Manchester it was the Neath-Cardiff part that was busy and overcrowded especially as it called at the likes of Pyle and Llanharan and people we having a 9am start in Cardiff. It used to ease off after Cardiff and only really get busy again after Shrewsbury. It was usually a 3 car however.