I suspect all the easy platform extensions have been done now, and SWR are not capable of clever diagramming as we've seen over the past few months.
There is that(!)
I was living in and commuting from Epsom at the time, and I also seem to remember the platform extensions when the 456s were brought in didn’t exactly go smoothly, admittedly that was NR’s responsibility, rather than SWT (as was).
It rather feels like the unions are sitting there, arms folded, saying "we don't like that" at every attempt to get these trains into service.
The issue is that the goalposts keep being moved and problems are arising which are either insurmountable or conflicting with other issues: a case in point is ten car trains, with no intermediate cabs, now needing to be guard dispatched because the lighting isn’t right for the DCO method both unions long since agreed to.
Remember the unions’ role is to protect their members. It would be quite wrong to compromise that by agreeing to “fudges” that cover for the employer’s frankly embarrassing failures to sort lighting, shortcomings in train spec etc. DCO was agreed to, so the unions had done “their bit”, and seemingly the only thing stopping it has been a failure to implement it safely.
I won't often defend unions actions but, in this case,
in the face of unworkable proposals from SWR management (&or DfT - who knows?), someone has to stand up and say it won't work, with the power to stop it happening. The tragedy here is that all the expertise isn't collaborating to find something workable, instead of the veto tennis we seem to be seeing.
Indeed.
Unions will back down once the 455 cab doors start falling off
Let’s hope it doesnt reach that stage(!) but, if it did, The union response would be to insist on urgent repairs to cab doors rather than saying: “The old trains are unsafe so we will agree to a method of working that’s also unsafe on the new ones”.