Windermere screams at me for a 25kV OHLE/Battery hybrid -and I say that as an out and out OHLE enthusiast.
I reckon that makes sense. This is my logic:
  1. All new EMUs should be fitted with at least a small traction battery - say 100kWh for a 4-car EMU. Enough to self rescue from an extended neutral section. (And enough to get it up to 100mph a couple of times, or to climb a 100m hill, and/or absorb the kinetic energy of braking from linespeed to zero.) Would save a lot of capital expenditure on electrification projects by allowing many more neutral sections under low bridges, and the cost of wiring sidings and depots etc.
  2. Once you've got a 100kWh battery in the design, it costs very little extra to provide a decent sized traction battery - say 1MWh per four car unit. Enough to provide 50-80 miles of range, judging from the ~500kWh battery used in 802207 on the TPE battery trial.
  3. Some of these longer range BEMUs should be fitted with a small diesel range extender, capable of running on HVO biodiesel. A 100kW diesel (small family car size) would be enough on a 4-car BEMU to give unlimited operating range. Perhaps two such engines, for redundancy.
We should then focus electrification on those routes that can't be serviced by an BEMU fleet meeting the above. This means in order:
  1. High speed lines (125mph running, e.g. Chippenham-Box, Birmingham-Derby);
  2. High intensity lines (6 or 8tph, e.g. Didcot-Oxford, Filton Bank).
  3. City centre stations as recharging hubs for local BEMU services (e.g. Sheffield, Bristol TM)
  4. Longer routes with higher speed running (110mph+, e.g. MML north; Berks & Hants)
  5. Battery Recharging sections on longer provincial routes with lower speeds (e.g. Newton Abbot to Penzance)
  6. Lines where freight speed up gradients is an important constraint (e.g. Felixstowe)
Windermere doesn't figure on this list. Sorry.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,961
Location
Airedale
I'd take closing Heysham to passengers in return for wiring and a clockface half hourly service from Lancaster to Morecambe. ...
Wire to Barrow too and that would get rid of all the diesel islands round there.
So treating Windermere as part of a package of works, which is surely correct, rather than as an isolated bit of infrastructure.

Trouble is, you then have an awful lot of expensive wiring to do - or you could buy a batch of BEMUs instead to serve all 3 routes
 

Mgameing123

Member
Joined
29 Apr 2023
Messages
1,052
Location
Denmark
Or it makes sense to use batteries eliminating the capital cost of the overheads given that there are already overheads available to charge at one end of the route.
And increase maintenance costs? Why are you so anti overhead lines?
 

Class 317

Member
Joined
7 Jul 2020
Messages
567
Location
Cotswolds
And increase maintenance costs? Why are you so anti overhead lines?
I'm not anti overheads I just have a balanced view that future electrification should be based on deployment of both Battery bi modes and OHLE as appropriate to the route rather than preferring one over the over.

I'm all for expanding OHLE on the likes of transpennine, MML to Sheffield etc. I also don't think it's worth spending millions on electrification of a lower use branch line where battery trains can do the job freeing funding for other lines instead.

If we want to replace all diesel trains we will need to use both technologies to achieve it. Battery bi modes allow the expansion of the benefits of any future OHLE over a much expanded area greatly increasing the BCR making future schemes more likely.

Turning the question around, it seems so many on here view battery trains as somehow a bad thing which I don't understand at all. Both technologies have a place in the future off making railways better, cheaper and greener.

In terms of maintenance costs they are cheaper for a BEMU than a DMU and only marginally more expensive than an EMU.

== Doublepost prevention - post automatically merged: ==

Depends on the relative costs of maintaining batteries and maintaining wires.
I know the costs for batteries from grid storage sites and it's quite low. I can't imagine that the cost of maintaining a few battery packs is higher than 10 miles of OHLE and associated equipment.
 

Mgameing123

Member
Joined
29 Apr 2023
Messages
1,052
Location
Denmark
I'm not anti overheads I just have a balanced view that future electrification should be based on deployment of both Battery bi modes and OHLE as appropriate to the route rather than preferring one over the over.

I'm all for expanding OHLE on the likes of transpennine, MML to Sheffield etc. I also don't think it's worth spending millions on electrification of a lower use branch line where battery trains can do the job freeing funding for other lines instead.

If we want to replace all diesel trains we will need to use both technologies to achieve it. Battery bi modes allow the expansion of the benefits of any future OHLE over a much expanded area greatly increasing the BCR making future schemes more likely.

Turning the question around, it seems so many on here view battery trains as somehow a bad thing which I don't understand at all. Both technologies have a place in the future off making railways better, cheaper and greener.

In terms of maintenance costs they are cheaper for a BEMU than a DMU and only marginally more expensive than an EMU.

== Doublepost prevention - post automatically merged: ==


I know the costs for batteries from grid storage sites and it's quite low. I can't imagine that the cost of maintaining a few battery packs is higher than 10 miles of OHLE and associated equipment.
Well then you also got to consider the additional weight trains will have to hold thanks to all those batteries. With overhead wires this wouldn’t be a problem and you would be able to run trains without batteries on the line. Batteries work best on branch lines without through service or lines with low ridership.
 

Mgameing123

Member
Joined
29 Apr 2023
Messages
1,052
Location
Denmark
Yes. I have looked at it and thought about for many hours over the last 5 years or so. It is fairly low down on my list of priorities for spending money.
Understandable but when you have opportunities like this where there is already a project planned on nearby rail line then they may aswell include electrification to Windermere.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,510
Location
Preston Lancs
Understandable but when you have opportunities like this where there is already a project planned on nearby rail line then they may aswell include electrification to Windermere.
Look, I swear to you, if it were to happen I would be leaping for joy and by then I will be retired back to the UK and I would photograph the hell out of the project and also leap for joy. However, I am trying to be a realist not an optimist!
 

Mgameing123

Member
Joined
29 Apr 2023
Messages
1,052
Location
Denmark
Look, I swear to you, if it were to happen I would be leaping for joy and by then I will be retired back to the UK and I would photograph the hell out of the project and also leap for joy. However, I am trying to be a realist not an optimist!
Well I try to be an optimist. The UK can never get anything done thanks to it’s pessimism.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
Decades of carting around unnecessary and expensive to maintain equipment, just to avoid electrifying the last few percent of a largely electrified route.

Such a policy is lunacy.
Exactly. Having to change from 25kv to battery then back several times a day each time the Windermere branch is used is not failsafe whereas continuous 25kv is almost 100% failsafe.
It is only a few miles of single line low cost tram wire electrification not needing additional feeding stations taking 3 months at most to wire. Get on with it and convert the Manchesters to EMUs that Northern already have now costing less than a roundabout on the A1079 near Hull. (£43M)
Does anybody know the real cost of extending 25kv to Windermere?
 

Class 317

Member
Joined
7 Jul 2020
Messages
567
Location
Cotswolds
Well then you also got to consider the additional weight trains will have to hold thanks to all those batteries. With overhead wires this wouldn’t be a problem and you would be able to run trains without batteries on the line. Batteries work best on branch lines without through service or lines with low ridership.
Well the Hitachi 80x testing would suggest it's no worse than DMU'S given the weight was the same for a standard 80x versus their battery modified one.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
How many bridges need rebuilding that is not cheap
NON. It was formerly dual track until singled in the 1970s when the line was centred on the formation where there was an arched bridge. That is another positive to electrification that I didn't consider. It lowers the cost even more.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,824
Decades of carting around unnecessary and expensive to maintain equipment

The additional maintnenace cost of traction batteries on trains is, essentially, nil. The cost of maintaining OLE, even the simplest stuff, is more.

Absolutely agree 100%, such a quick win and so much easier than fitting a load of batteries to the trains.

It isn‘t.


and I guess St Albans Abbey, which was done, is a similar example to Windermere).

To be honest the north-south bias shows quite clearly when you see that they did St Albans Abbey but not Windermere despite Windermere having far more traffic potential (e.g. for through services from Euston for tourists, particularly in the 80s when far more of that went on) but being otherwise similar. (St Albans Abbey carries tiny loadings - a 153 would be plenty, indeed despite the wires I think Class 150s did show up from time to time in Silverlink days, but a 4-car EMU is used because it's easier).

St Albans Abbey was electrified to remove an island of disesel operation in an otherwise entirely electric area. Even then it needed Chris Green to force it through with some, ahem, creative accounting. This isn’t the case for Windermere.


It hasn't been confirmed and in the current climate I doubt batteries would be approved because of the cost in doing so

Id be very surprised if the new Northern order did not include a quantity of battery trains.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,361
Location
Yorks
Id be very surprised if the new Northern order did not include a quantity of battery trains.

Even if the Northern order includes "a quantity" of battery trains, would it not be better to use those on routes with little sensible alternative to battery operation, rather than a stub of a largely electrified route that could be done easily.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,392
Location
The Fens
Windermere screams at me for a 25kV OHLE/Battery hybrid -and I say that as an out and out OHLE enthusiast.
Five years ago I was an out and out overhead line electrification (OHLE) enthusiast too, now I'm in favour of limited/discontinuous OHLE and OHLE/battery hybrid trains. Windermere is ideal for OHLE/battery hybrid trains, with plenty of opportunity to recharge on through running to/from Preston or further.

The UK has finite resources, both financial and people with the necessary skills to do OHLE projects. Installation of OHLE is very expensive and should only be done where it delivers lots of bang for each buck, contributing significantly to UK economic growth. OHLE might help boost the sales of a few cake chops in Windermere, but it is not going contribute significantly to UK economic growth. The same benefit to those cake shops can be achieved with OHLE/battery hybrid trains that have a much lower upfront capital cost and don't tie up skilled OHLE people who could be working on more worthwhile projects.

One point not mentioned so far is that about half of the Windermere branch is in the Lake District National Park. The first ever NIMBY was the Lakeland poet William Wordsworth, and he wrote this poem about 180 years ago, before the line was constructed:

Is then no nook of English ground secure
From rash assault? Schemes of retirement sown
In youth, and 'mid the busy world kept pure
As when their earliest flowers of hope were blown,
Must perish; — how can they this blight endure?
And must he too the ruthless change bemoan
Who scorns a false utilitarian lure
'Mid his paternal fields at random thrown?
Baffle the threat, bright Scene, from Orrest-head
Given to the pausing traveller's rapturous glance:
Plead for thy peace, thou beautiful romance
Of nature; and, if human hearts be dead,
Speak, passing winds; ye torrents, with your strong
And constant voice, protest against the wrong.

There will be more OHLE, but it won't be to Windermere.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,617
Location
Greater Manchester
Even if the Northern order includes "a quantity" of battery trains, would it not be better to use those on routes with little sensible alternative to battery operation, rather than a stub of a largely electrified route that could be done easily.
Lot 1 - EMU
Phase 1
11 x 3 car
Phase 2
34 x 3 car
16 x 4 car
These may be ordered under Lot 2 or Lot 3 as direct built to EMUs.
Lot 2 - Multimode Multiple Unit (Diesel + Battery + Electric with potential to convert or direct build to Electric + Battery Electric)
Phase 1
44 x 3 car
66 x 4 car
Phase 2
30 x 3 car
20 x 4 car
Lot 3 - Battery EMU (Battery + Electric with poential to convert or direct build to Electric)
Phase 1
6 x 4 car
Phase 2
26 x 4 car

These may be ordered under Lot 2 as direct built to BEMUs.
The Northern order is mostly battery trains (especially phase 1, where only 7.3% of the carriages are under lot 1, which could be battery units ordered under lot 2 anyway!)

Edit 23:09 16/01/2025 - Had Lot 2 Phase 1 3 cars at 33 instead of 44, now corrected
 
Last edited:

Class 317

Member
Joined
7 Jul 2020
Messages
567
Location
Cotswolds
Five years ago I was an out and out overhead line electrification (OHLE) enthusiast too, now I'm in favour of limited/discontinuous OHLE and OHLE/battery hybrid trains. Windermere is ideal for OHLE/battery hybrid trains, with plenty of opportunity to recharge on through running to/from Preston or further.

The UK has finite resources, both financial and people with the necessary skills to do OHLE projects. Installation of OHLE is very expensive and should only be done where it delivers lots of bang for each buck, contributing significantly to UK economic growth. OHLE might help boost the sales of a few cake chops in Windermere, but it is not going contribute significantly to UK economic growth. The same benefit to those cake shops can be achieved with OHLE/battery hybrid trains that have a much lower upfront capital cost and don't tie up skilled OHLE people who could be working on more worthwhile projects.

One point not mentioned so far is that about half of the Windermere branch is in the Lake District National Park. The first ever NIMBY was the Lakeland poet William Wordsworth, and he wrote this poem about 180 years ago, before the line was constructed:



There will be more OHLE, but it won't be to Windermere.
That sums up my views much more eloquently than I probably could put it

I don't get why people seem so willing to spend limited resources on a very poor case for OHLE.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,361
Location
Yorks
The Northern order is mostly battery trains (especially phase 1, where only 7.8% of the carriages are under lot 1, which could be battery units ordered under lot 2 anyway!)

Even then they will only be a part of the Northern fleet.

With pressure to remove diesel units, these will be needed elsewhere surely.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,617
Location
Greater Manchester
With pressure to remove diesel units, these will be needed elsewhere surely.
Based on that the Wigan-Bolton electrification (a much shorter distance than to Windermere) will have taken 4 years by the time trains actually start runing (green light given Sep 2021), and the fact that the 755s only took 3 years from order (August 2016) to operation (July 2019), it could well be possible that even if Windermere electrification was given the green light today, the new units would arrive and be operating first.
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,480
Location
Sheffield
Well I try to be an optimist. The UK can never get anything done thanks to it’s pessimism.

If Vincent Raven's electrification plans hadn't come to a halt after WW1 I doubt we'd be having this conversation. Shildon to Teesside electrified by 1915 with more to have come - 110 years ago.

However the technology has moved on and practical battery options combined with wired sections seem to be more suitable for the Windermere line. Reading between the tender lines Northern appear to be keeping options open. As any new stock won't be deployed in force before 2030, and in service until 2060/70, a lot can have happened by then.

Hopefully MML electrification will have reached Sheffield by the late 2030s so BEMU would suit Nottingham - Leeds. Other deployment options will become possible. I note the Hope Valley route was optimistically being promised electrification by the previous government. That's unlikely to happen soon but bring in BEMUs with limited wiring and that becomes a possibility.

My objection to overhead wiring is the seemingly frequent occasions when wires are brought down blocking all traffic for hours. With a decent capacity battery more trains can potentially move round such obstructions.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,333
The weight of a megawatt hour of traction batteries (or more!) is not going to significantly change the weight of the train. I would not expect it to make a measurable difference to track wear or other maintenance requirements.

If we were in the 1980s and electrification was cheap, I would see the advantages of just electrifying and being done with it.

Unfortunately we don't live in that world any more, 25kV electrification is expensive now.
 

geoffk

On Moderation
Joined
4 Aug 2010
Messages
3,931
Location
Exeter
Absolutely agree 100%, such a quick win and so much easier than fitting a load of batteries to the trains.
Could be a test bed for using wooden catenary poles (which were used on the Lancaster - Morecambe - Heysham line).
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,824
Until you give a reason for your disagreement, I won’t be changing my stance. Saying “it isn’t” just won’t convince me I’m afraid.
Well, I’ve done electrification projects. Planned, managed, done work on site. I’ve also maintained OLE. And dealt with the consequences when the stuff has come down.

I’ll freely admit I haven’t put batteries on trains, nor bought or maintained battery trains. But I have been in factories where trains are (or were) built and plenty of other places seeing them maintained, and seen for myself what is hard about building and maintaining them. And I do know people who have been involved in battery trains, including someone at Hitachi involved in the 802 trial (which I like to think came about because I suggested such a trial to him 4 years ago, but I’m fairly sure they had their own idea!).

So:

1) OLE is not a quick win. It needs designing. It will need some tricky discussions and potentially planning approvals from the local authorities and National Park. Most importantly it would cost at least £30m, and that would make it by far the cheapest electrification in this country per single track km for over a decade, even if you forget about inflation (of which we have had much in that time). And to persuade the Treasury to spend £30m they would want to know it was value for money, and, very importantly, if they could get a similar benefit for lower cost. Which is where battery trains come in.

2) ‘Fitting batteries to trains’ is not difficult, nor expensive. Every train in service today has batteries, albeit mostly not for traction. Fitting some more, albeit larger ones, would just be another part of construction. Compared to the other parts of train construction, such as wiring up a cab or installing all the wiring looms and connecting them up, fitting bigger batteries and an extra set of control electronics is frankly straightforward. And once in, they essentially need zero maintenance.

I really am no expert, but if the additional cost of a decent traction battery on a new 4 car EMU is £1m, and that feels pessimistic*, then you could buy 30 battery equipped EMUs (compared to new EMUs), use half a dozen on the Windermere service, and still have another 24 to electrify whole other lines of route in the north, and therefore be well up on the deal.

*You can buy the batteries needed for a 4 car EMU to have c100km range for about half a million pounds, and they come gift wrapped in a dozen brand new Teslas.

== Doublepost prevention - post automatically merged: ==

What kind of structures (e.g. low bridges) would cause difficulties fully electrifying on the Windermere line?

A quick google suggests around a dozen overbridges, some of which will be clear, but some definitely won’t be. There’s also several level crossings (highway, footpath, bridleway and private), and lots and lots of trees.
 
Last edited:

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,532
Location
"Marston Vale mafia"
St Albans Abbey was electrified to remove an island of disesel operation in an otherwise entirely electric area.

Except it isn't really. It would have been perfectly possible to operate it using a Bletchley DMU (indeed I think on occasions it still was even after electrification - on occasions the DMUs even did Sunday morning Bletchley-Euston locals, though sadly I never managed to ride one). Though perhaps the view then was that the Marston Vale was likely to close and the GOBLIN be electrified (as it eventually was) then it really would be a diesel island?

Even then it needed Chris Green to force it through with some, ahem, creative accounting. This isn’t the case for Windermere.

Perhaps more "CG wanted it to be so, and it was so". He had a lot of power!
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,824
Except it isn't really. It would have been perfectly possible to operate it using a Bletchley DMU (indeed I think on occasions it still was even after electrification - on occasions the DMUs even did Sunday morning Bletchley-Euston locals, though sadly I never managed to ride one). Though perhaps the view then was that the Marston Vale was likely to close and the GOBLIN be electrified (as it eventually was) then it really would be a diesel island?



Perhaps more "CG wanted it to be so, and it was so". He had a lot of power!

I did wonder whether it would be you or @ChiefPlanner that picked me up on this, I guess the latter is having an early night!
 

MisterSheeps

Member
Joined
12 Jun 2022
Messages
316
Location
Kendal, England
With a decent capacity battery more trains can potentially move round such obstructions
what possible relevance is this on a single track branch line with no passing loop?

Batteries work best on branch lines without through service or lines with low ridership.
add to this "and limited gradient changes". The ascent from Kendal to Oxenholme is steep (as is Plumpton to Lindal for those battery advocates of the Barrow line.
Genuine question ... could a battery loco feasibly be used to drag an EMU between Oxenholme and Windermere? Or abandon through services, simply have EMU to Manxhester, and battery unit between Oxenholme and Windermere.
 