swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,237
A recent discussion about Middlesbrough P3 concluded that the sign pointing towards it in the refurbished subway is about the only visible progress so far:Really hope Middlesbrough does get the long awaited increase in its one a day LNER service. No idea what the stance is on platform 3 at the moment tho
Middlesbrough railway station masterplan
That appears different from what I was expecting. I was under the impression a new platform was getting built on the north side (down Saltburn slow line). That concept was part of the previous Middlesbrough Council led masterplan. The real world site constraints meant that a new platform and...
Last edited:
