DarloRich
Veteran Member
fairly certain an NR test train ran along E-W recently - does any have any evidence or confirmation?
fairly certain an NR test train ran along E-W recently - does any have any evidence or confirmation?
cheers - duff gen then ( word locally was that the 950 had been down the line)If you mean the one seen at Bletchley High Level, as far as I know it didn't venture any further west than the flyover. The only non-engineering train that has traversed the line so far is inspection saloon 'Caroline'.
cheers - duff gen then ( word locally was that the 950 had been down the line)
cheers - semi duff gen thenI believe it was booked to, however due to the line still being a worksite it wasn't possible.
Correct - it reversed using the crossover at Bletchley West Junction, by the cemetery.If you mean the one seen at Bletchley High Level, as far as I know it didn't venture any further west than the flyover.
Good news for a number of reasons.East West Rail has received formal ORR acceptance for service on thier webpage.
Ages, it doesn't exist.Good news for a number of reasons.
Anyone know when the first train will visit 'Claydon' for Calvert HS2 IMD?
Of course, but for construction?Ages, it doesn't exist.
It may be used to deliver rail, OLE etc, but that is still a number of years away.Of course, but for construction?
I was under the impression that before the IMD is constructed a railhead will be built on the same site.
This to allow some materials needed to construct HS2 and for the IMD to be by train.
The railhead then to be converted into the IMD when no longer required.
Quainton is the railhead at present with lorries carrying materials along the trackbed north of Quainton Road station. I don't see that changing until tracklaying starts.Of course, but for construction?
I was under the impression that before the IMD is constructed a railhead will be built on the same site.
This to allow some materials needed to construct HS2 and for the IMD to be by train.
The railhead then to be converted into the IMD when no longer required.
It may be used to deliver rail, OLE etc, but that is still a number of years away.
Thanks both. I will be interested to see what unfolds in due course.Quainton is the railhead at present with lorries carrying materials along the trackbed north of Quainton Road station. I don't see that changing until tracklaying starts.
nothing documented yet - as soon as it is i will postI'm a little confused. Have you seen any specific documented evidence of the service introduction in mid-May 2025?
Quainton is the railhead at present with lorries carrying materials along the trackbed north of Quainton Road station. I don't see that changing until tracklaying starts.
The haul road they use goes nowhere near the Railway Centre, it’s diverted well away to the southwest of the NR line and joins the HS2 route’s future trackbed. They effectively have a private road network for this sort of material delivery. It’s not really an EWR construction issue however.how does this work around the Quainton Railway Center - and their ability to use the old calvet line through the platforms?
nothing documented yet - as soon as it is i will post
Yes - see posts #1791-4 (26th August)There is a railtour slated to take in the line next month: https://www.pathfindertours.co.uk/events/the-verney-venturer/

Re-dated - Now 15 FebThere is a railtour slated to take in the line next month: https://www.pathfindertours.co.uk/events/the-verney-venturer/
East West Rail: Signalling commissioning is now due at 06.00 Sun 20 Oct 2024.
Re-dated - Now 15 Feb
The Branch Line Society's Branchline News issue 1457.2337 says:
Thanks @Snow1964 for posting. From the video I notice there is what appears to be a separate walkway either side of the track bed on the EWR line bridge over HS2 - as in outside of the main beams (at 1m00s). I am comparing it to the next (concrete ?) bridge to the West (?, at 1m30s).
Thanks. I wondered why it appeared to be absent at the next bridge. Probably simply a wider span there accommodating the the walkway/cable-trough ?. Interesting difference.That is the trackside cabling housed in troughing which forms a lineside walking route. A very useful feature which is also found along the track from Bicester Village towards Oxford.
If it was a Rail Operations Group loco then my guess is that it was route learning and the stop may have been for the driver to take notes.(Please delete if not in appropriate forum)
I was walking on Tuesday afternoon along the footpath that runs beside the line from Bow Brickhill level crossing to the bridge where one can go under the line to Caldecotte Lake when a single engine came along, at fairly slow speed, and then stopped, presumably at a signal.
The engine then continued on its way towards Bletchley - sorry I didn't think to take a photo nor am I able to recognise classes but I did notice it had a sign on it saying it was called Cassiopeia.
I did wonder if it was checking out something for the E-W rail route but a bit of goggling suggests it was may have been Rail Operations Group BR Class 37 37800.
Isn't that on the Bletchley - Bedford section though, rather than the "new" railway from Bicester to Bletchley? Could still be route learning of course as some freight still trundles that way.If it was a Rail Operations Group loco then my guess is that it was route learning and the stop may have been for the driver to take notes.
yes it is the Bedford to Bletchley section but my thought was to wonder whether it was route learning for when Bletchley to Oxford opens.Isn't that on the Bletchley - Bedford section though, rather than the "new" railway from Bicester to Bletchley? Could still be route learning of course as some freight still trundles that way.