fairly certain an NR test train ran along E-W recently - does any have any evidence or confirmation?

If you mean the one seen at Bletchley High Level, as far as I know it didn't venture any further west than the flyover. The only non-engineering train that has traversed the line so far is inspection saloon 'Caroline'.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,887
Location
Fenny Stratford
If you mean the one seen at Bletchley High Level, as far as I know it didn't venture any further west than the flyover. The only non-engineering train that has traversed the line so far is inspection saloon 'Caroline'.
cheers - duff gen then ( word locally was that the 950 had been down the line)
 

eastdyke

Established Member
Joined
25 Jan 2010
Messages
2,058
Location
East Midlands
Ages, it doesn't exist.
Of course, but for construction?
I was under the impression that before the IMD is constructed a railhead will be built on the same site.
This to allow some materials needed to construct HS2 and for the IMD to be by train.
The railhead then to be converted into the IMD when no longer required.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,634
Of course, but for construction?
I was under the impression that before the IMD is constructed a railhead will be built on the same site.
This to allow some materials needed to construct HS2 and for the IMD to be by train.
The railhead then to be converted into the IMD when no longer required.
It may be used to deliver rail, OLE etc, but that is still a number of years away.
 

DavidGrain

Established Member
Joined
29 Dec 2017
Messages
1,488
Of course, but for construction?
I was under the impression that before the IMD is constructed a railhead will be built on the same site.
This to allow some materials needed to construct HS2 and for the IMD to be by train.
The railhead then to be converted into the IMD when no longer required.
Quainton is the railhead at present with lorries carrying materials along the trackbed north of Quainton Road station. I don't see that changing until tracklaying starts.
 

eastdyke

Established Member
Joined
25 Jan 2010
Messages
2,058
Location
East Midlands
It may be used to deliver rail, OLE etc, but that is still a number of years away.

Quainton is the railhead at present with lorries carrying materials along the trackbed north of Quainton Road station. I don't see that changing until tracklaying starts.
Thanks both. I will be interested to see what unfolds in due course.
 

IanH440

Member
Joined
11 Oct 2017
Messages
37
Quainton is the railhead at present with lorries carrying materials along the trackbed north of Quainton Road station. I don't see that changing until tracklaying starts.

how does this work around the Quainton Railway Center - and their ability to use the old calvet line through the platforms?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
how does this work around the Quainton Railway Center - and their ability to use the old calvet line through the platforms?
The haul road they use goes nowhere near the Railway Centre, it’s diverted well away to the southwest of the NR line and joins the HS2 route’s future trackbed. They effectively have a private road network for this sort of material delivery. It’s not really an EWR construction issue however.
 
Last edited:

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,022
Location
West Wiltshire
New drone video, of the East West rail where it crosses HS2, showing the area where the rail line crosses the bridge over the under construction line.

Not my video, but recently uploaded on you tube

 
Last edited:

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,588
Location
Croydon
Thanks @Snow1964 for posting. From the video I notice there is what appears to be a separate walkway either side of the track bed on the EWR line bridge over HS2 - as in outside of the main beams (at 1m00s). I am comparing it to the next (concrete ?) bridge to the West (?, at 1m30s).
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
Thanks @Snow1964 for posting. From the video I notice there is what appears to be a separate walkway either side of the track bed on the EWR line bridge over HS2 - as in outside of the main beams (at 1m00s). I am comparing it to the next (concrete ?) bridge to the West (?, at 1m30s).

That is the trackside cabling housed in troughing which forms a lineside walking route. A very useful feature which is also found along the track from Bicester Village towards Oxford.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,588
Location
Croydon
That is the trackside cabling housed in troughing which forms a lineside walking route. A very useful feature which is also found along the track from Bicester Village towards Oxford.
Thanks. I wondered why it appeared to be absent at the next bridge. Probably simply a wider span there accommodating the the walkway/cable-trough ?. Interesting difference.
 
Joined
19 Jul 2023
Messages
342
Location
Milton Keynes
(Please delete if not in appropriate forum)

I was walking on Tuesday afternoon along the footpath that runs beside the line from Bow Brickhill level crossing to the bridge where one can go under the line to Caldecotte Lake when a single engine came along, at fairly slow speed, and then stopped, presumably at a signal.

The engine then continued on its way towards Bletchley - sorry I didn't think to take a photo nor am I able to recognise classes but I did notice it had a sign on it saying it was called Cassiopeia.

I did wonder if it was checking out something for the E-W rail route but a bit of goggling suggests it was may have been Rail Operations Group BR Class 37 37800.

 

DavidGrain

Established Member
Joined
29 Dec 2017
Messages
1,488
(Please delete if not in appropriate forum)

I was walking on Tuesday afternoon along the footpath that runs beside the line from Bow Brickhill level crossing to the bridge where one can go under the line to Caldecotte Lake when a single engine came along, at fairly slow speed, and then stopped, presumably at a signal.

The engine then continued on its way towards Bletchley - sorry I didn't think to take a photo nor am I able to recognise classes but I did notice it had a sign on it saying it was called Cassiopeia.

I did wonder if it was checking out something for the E-W rail route but a bit of goggling suggests it was may have been Rail Operations Group BR Class 37 37800.

If it was a Rail Operations Group loco then my guess is that it was route learning and the stop may have been for the driver to take notes.
 
Joined
26 Aug 2022
Messages
28
Location
Buckingham
If it was a Rail Operations Group loco then my guess is that it was route learning and the stop may have been for the driver to take notes.
Isn't that on the Bletchley - Bedford section though, rather than the "new" railway from Bicester to Bletchley? Could still be route learning of course as some freight still trundles that way.
 
Joined
19 Jul 2023
Messages
342
Location
Milton Keynes
Isn't that on the Bletchley - Bedford section though, rather than the "new" railway from Bicester to Bletchley? Could still be route learning of course as some freight still trundles that way.
yes it is the Bedford to Bletchley section but my thought was to wonder whether it was route learning for when Bletchley to Oxford opens.
 