Reading - Paddington route set for overhaul - BBC report

Status
Not open for further replies.

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,484
Location
Gomshall, Surrey
To be boringly pedantic, decimation is actually reducing by one tenth (the Roman practice of killing every tenth soldier to encourage the others).

Of course it isn't used that way now :D
I almost posted the same thing, but my dictionary also states that the accepted modern usage means to reduce or damage greatly.

== Doublepost prevention - post automatically merged: ==

Yesterday Network Rail confirmed exactly the points that Bald Rick states.
Compared with 2018-19 there are now 17% more trains on this stretch of track, 14% more station stops and 38% more tonnage.
Indeed but, I wonder, was that situation taken into account with maintenance plans? Or was the inevitable failure escalation just accepted as inevitable and to be 'lived with'?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

nickswift99

Member
Joined
7 Apr 2013
Messages
283
I almost posted the same thing, but my dictionary also states that the accepted modern usage means to reduce or damage greatly.

== Doublepost prevention - post automatically merged: ==


Indeed but, I wonder, was that situation taken into account with maintenance plans? Or was the inevitable failure escalation just accepted as inevitable and to be 'lived with'?
When NR approve TOCs timetables, does anyone actually stop to think about infrastructure impact, or do they just focus on whether a timetable will "work"?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,718
When NR approve TOCs timetables, does anyone actually stop to think about infrastructure impact, or do they just focus on whether a timetable will "work"?
Yes, there are various risk processes to go through. It used to be called TCRAG (Timetable Change Risk Assessment Group), but has another fancy title now I can't remember.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,910
When NR approve TOCs timetables, does anyone actually stop to think about infrastructure impact, or do they just focus on whether a timetable will "work"?

Yes, there are various risk processes to go through. It used to be called TCRAG (Timetable Change Risk Assessment Group), but has another fancy title now I can't remember.

TP-RAP (Train Plan Risk Assurance Panel).
 

Tomos y Tanc

Member
Joined
1 Jul 2019
Messages
917
To be boringly pedantic, decimation is actually reducing by one tenth (the Roman practice of killing every tenth soldier to encourage the others).

Of course it isn't used that way now :D
To be boringly pedantic, you're wrong.

Now back to the topic.
 

Thames99

Member
Joined
11 Sep 2023
Messages
335
Location
Reading
To be boringly pedantic, you're wrong.

Thanks Tomos - your link contains the brilliant Life of Brian Latin grammar lesson which is always good to watch again!
 

mtmikethom

Member
Joined
6 Sep 2011
Messages
168
Location
Essex
Overhead line issues for the second day running today around Ealing, doesn’t to be the same place today as yesterday, much disruption to Elizabeth line with down trains running fast Ealing Bdy to West Drayton/Heathrow this afternoon, been a unit stuck at Ealing Bdy for a few hours on the down relief it looks.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,623
Location
Northampton
Overhead line issues for the second day running today around Ealing, doesn’t to be the same place today as yesterday, much disruption to Elizabeth line with down trains running fast Ealing Bdy to West Drayton/Heathrow this afternoon, been a unit stuck at Ealing Bdy for a few hours on the down relief it looks.
Fairly sure yesterday's incident at Ealing Broadway was nothing to do with the maintenance of the infrastructure.
 

mtmikethom

Member
Joined
6 Sep 2011
Messages
168
Location
Essex
Fairly sure yesterday's incident at Ealing Broadway was nothing to do with the maintenance of the infrastructure.
An only going by what seemed to put out yesterday evening, GWR were using the relief lines though, TfL seem to be very poor with info on the Elizabeth line when it’s disrupted.
 

Acton1991

Member
Joined
20 Jan 2019
Messages
391
Seems to still be having issues at nearly 2200 this evening. Anyone have any updates? Yet another day of big delays.
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,530
Fairly sure yesterday's incident at Ealing Broadway was nothing to do with the maintenance of the infrastructure.

Monday was nothing to do with infra/maintenance.

Tuesday was OLE damage on the Down Main at Ealing

Wednesday has been OLE damage on the Down Relief near Ealing, and now a nasty points failure at Southall.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,012
Location
London
Tuesday and Wednesday have both been OLE related.

Monday, whilst not being OLE related did necessitate an emergency switch off of power which took a prolonged period of time to restore.

Extra overnight engineering works have been taking place since 2200 the last few weeks in response to the major Thames Valley problems over the last 12 months, although that has mainly been for ground-based asset management.

== Doublepost prevention - post automatically merged: ==

An only going by what seemed to put out yesterday evening, GWR were using the relief lines though, TfL seem to be very poor with info on the Elizabeth line when it’s disrupted.

Was related to a rather serious trespasser event.
 

apbj

Member
Joined
18 May 2023
Messages
70
Location
London
Paddington-Reading will now be closed until Sunday afternoon at the earliest https://twitter.com/GWRHelp/status/1773388868168888527

== Doublepost prevention - post automatically merged: ==

Compared with 2018-19 there are now 17% more trains on this stretch of track, 14% more station stops and 38% more tonnage.
All of which has been known and anticipated for literally decades. Crossrail wasn't exactly a secret or a surprise!
 

Acton1991

Member
Joined
20 Jan 2019
Messages
391
More disruption this morning between Heathrow/Reading and Paddington due to a track fault at Hayes.
Totally appreciate that a lot of work needs to be done to bring the infrastructure up to scratch, but it is concerning to me that there are continued faults being found.

Elizabeth line was in meltdown during my commute, so I gave up and came home - a common occurrence!
 

Jamiescott1

Member
Joined
22 Feb 2019
Messages
1,116
Disruption expected until the end of the day.
I've lost count of number of recent delays but definitely Saturday, Sunday, last night and today.
The usual contingency in place with didcot stoppers cancelled.
The EL train i took this morning from Maidenhead (started at Reading) was full and standing from Slough
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,012
Location
London
You might forgive it if there was a one-off event, but it is without hyperbole that weekly (if not several times a week) a critical bit of infrastructure fails between Slough and Paddington necessitating a rather severe contingency plan. Sometimes more than one at a time!

The overnight engineering works (Project Brunel) have finished for now - not that they appear to have had the required impact - pending negotiations between all parts on getting line access again.
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,326
Location
London
You might forgive it if there was a one-off event, but it is without hyperbole that weekly (if not several times a week) a critical bit of infrastructure fails between Slough and Paddington necessitating a rather severe contingency plan. Sometimes more than one at a time!

The overnight engineering works (Project Brunel) have finished for now - not that they appear to have had the required impact - pending negotiations between all parts on getting line access again.
Certainly it seems the contingency has also given up spinning at Reading as they used to do. The fact that they can get away with cancelling services over in Bristol because of a points failure in Hayes shocks me
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,012
Location
London
Certainly it seems the contingency has also given up spinning at Reading as they used to do. The fact that they can get away with cancelling services over in Bristol because of a points failure in Hayes shocks me

That is certainly a shame. GWR's struggles to apply the contingency well seems to involve running extra trains through to Paddington outside contingency (not good, causing more congestion for all) or just outright cancelling (not good, people held back down the line). I can understand not wanting to block up Reading and all the crew relief at Paddington, but they can be moved down the line as required.
 

Acton1991

Member
Joined
20 Jan 2019
Messages
391
The EL train i took this morning from Maidenhead (started at Reading) was full and standing from Slough
Tried boarding one of the very few that stopped at Acton Main Line and it was a no go. No one could board, with the next service cancelled most of us gave up and went home!
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,012
Location
London
Tried boarding one of the very few that stopped at Acton Main Line and it was a no go. No one could board, with the next service cancelled most of us gave up and went home!

During the contingency plans affecting anything east of Heathrow Junction, Acton Main Line, West Ealing and Hanwell are all reduced to 2tph (if they can even be served if the issue is on the Relief lines). Naturally services are already busy (Ealing goes from 10tph to 4tph) so this is naturally an unavoidable consequence (especially in AM where Acton Main Line is the last GWML stop) with little to zero chance of additional stops.
 

Jamiescott1

Member
Joined
22 Feb 2019
Messages
1,116
Southall area seems to be a particularly issue.
There has been issues in this area past few months and today one of the lines in the area is closed (don't know which line) for emergency repairs
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,012
Location
London
Southall area seems to be a particularly issue.
There has been issues in this area past few months and today one of the lines in the area is closed (don't know which line) for emergency repairs

Cracked crossing (yes, again).
 