baz962

Established Member
Joined
8 Jun 2017
Messages
3,664
I am guessing it will be a fairly similar regime to that of the Avanti 805s and 807s, however I am guessing a lot of EMR drivers will need training on OLE.
Maybe a few but not many. Most of us already drive 360's . All of the London and Kettering drivers do and quite a few Derby. Just some Derby drivers that might not , but it's part of the normal rules anyway.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,374
I am guessing it will be a fairly similar regime to that of the Avanti 805s and 807s, however I am guessing a lot of EMR drivers will need training on OLE.
A lot more testing is required with the 810s, due to the different carriage length, new engines etc.
A 810 is about 70% a different train compared to all other 8Xx variants.
 

Supercoss

Member
Joined
5 Jun 2016
Messages
466
First trip Into St Pancras planned today at lunchtime as 5Q45/46
then overnight testing CorbyTo Luton 5Q41/42/43/44 circuits
Diesel Throughout
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,164
Location
West Wiltshire
First trip Into St Pancras planned today at lunchtime as 5Q45/46
then overnight testing CorbyTo Luton 5Q41/42/43/44 circuits
Diesel Throughout

If it is not silly question, if they are doing tests on diesel, why do it on a busy electrified line, not the unelectrified section.

Similiarly if testing platforms and clearances, surely would want to do it it in mode train will normally be working in the area, not in alternative power for non electrified areas
 
Last edited:

800001

Established Member
Joined
24 Oct 2015
Messages
7,374
If it is not silly question, if they are doing tests on diesel, why do it on a busy electrified line, not the unelectrified section.

Similiarly if testing platforms and clearances, surely would want to do it it in mode train will normally be working in the area, not in degraded version.

Why is diesel mode classed as degraded version? These units are able to achieve and keep to time operating at 125mph, so doesn’t matter which mode it operates in.
 
Last edited:

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
If it is not silly question, if they are doing tests on diesel, why do it on a busy electrified line, not the unelectrified section.

Similiarly if testing platforms and clearances, surely would want to do it it in mode train will normally be working in the area, not in degraded version.
I imagine it's all part of testing. You'd need to check platforms and other interfere issues in both modes.

Not sure if the Pan-Down signs for 810s are in place yet. (Until the knitting on the MML is upgraded)
 

DaveyJones

Member
Joined
12 Mar 2023
Messages
217
Location
UK
Why is diesel mode classed as degraded version? These units are able to achieve and keep to time operating at 125mph, so doesn’t matter which mode it operates in.
Is the linespeed still higher in Diesel? (I seem to recall this was the case?)
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,523
Yes it is, and will likely remain so until the OLE125 works are complete - in late 2025 as things currently stand.
 

dosxuk

Established Member
Joined
2 Jan 2011
Messages
2,439
Which means if it's running in a 222 path, or to timings based on a 222, it will need to run on diesel into St Pancras to keep to time.
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,523
Which means if it's running in a 222 path, or to timings based on a 222, it will need to run on diesel into St Pancras to keep to time.
The tenor of this thread suggests that might no longer be a concern when the first 810s actually enter passenger service!
 

dosxuk

Established Member
Joined
2 Jan 2011
Messages
2,439
The tenor of this thread suggests that might no longer be a concern when the first 810s actually enter passenger service!

Yes, but we're talking about whether it should be using the OHLE on the test runs that were scheduled for today.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,374
Yes, but we're talking about whether it should be using the OHLE on the test runs that were scheduled for today.
It can’t use the OHL for the test runs, as it is not authorised for use in electric mode anywhere on the midland mainline.

As the carriage lengths are different to previous, it is currently undergoing pantograph testing on the ECML, so all tests, when they do start on Midland mainline (now tonight Old Dalby to Luton), will be in diesel mode for the time being.

Unknown when electric operation will be allowed on the Midland.
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,504
Location
DTOS A or B
I imagine it's all part of testing. You'd need to check platforms and other interfere issues in both modes.

Not sure if the Pan-Down signs for 810s are in place yet. (Until the knitting on the MML is upgraded)
Signs in place, but covered over.
 

Northerngirl

Member
Joined
16 Aug 2023
Messages
513
Location
Wirral
Sorry if its been asked before, but why do they have to perfectly match the performance of the 222s, surely the couple of minutes lost on the diesel section can be made up on electric, much like with the avanti 805s.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,374
Sorry if its been asked before, but why do they have to perfectly match the performance of the 222s, surely the couple of minutes lost on the diesel section can be made up on electric, much like with the avanti 805s.
To maintain the pathing on the congested southern section of the midland mainline where they share with Thameslink?
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,374
Surely they would be on electric at that point though
When the wires are able to be used at 125mph yes.
But as they are not ready, the intention was to operate in diesel to maintain 125.

However as the wires may actually be upgraded and ready prior to passenger introduction, at that time then they will be able to operate on electric at 125mph.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,602
Location
Northampton
When the wires are able to be used at 125mph yes.
But as they are not ready, the intention was to operate in diesel to maintain 125.

However as the wires may actually be upgraded and ready prior to passenger introduction, at that time then they will be able to operate on electric at 125mph.
Is there a thread on the 125mph OLE upgrade?
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,374
Is there a thread on the 125mph OLE upgrade?
A quick search on the Infrastructure section of the forum brings up the below thread, I presume that includes about the upgrade of the southern section.

 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
A quick search on the Infrastructure section of the forum brings up the below thread, I presume that includes about the upgrade of the southern section.

That thread includes discussion of the upgrades to the OLE south of Bedford, interspersed with discussion of the extension of the OLE north of Kettering. There's no separate thread. You may have to look through a lot of pages to find relevant posts.

Furthermore the work south of Bedford is part of two different programmes - not all of it is for 125 mph.
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,523
Is there a thread on the 125mph OLE upgrade?
If you search for "OLE125" or "OLE 125" you'll find many of the more recent posts (primarily within the afore-linked thread) on that topic.
 

QSK19

Member
Joined
29 Dec 2020
Messages
1,144
Location
Leicestershire
I thought the eventual plan, once electric running along the MML is authorised, was to run pan up between Cricklewood and STP because the line speed isn’t above 100mph and so as to eliminate diesel under the wires when standing at STP?
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,523
More of an interim stage, but yes. Supercoss has previously mentioned plans to install APCO balises (and/or pan up/down boards) just NW of Cricklewood station, whilst [Scratch or Boreham]wood has also been suggested as such a location by industry press.
 

Supercoss

Member
Joined
5 Jun 2016
Messages
466
Class 810 specific signage has been installed that requires pantographs to be lowered ( on the move) going North around the ‘Apex Corner’ area, where the M1 motorway runs parallel ( between Mill Hill Broadway & Elstree Tunnel) but this signage is still sheeted over , the actual location where line speed increases above 100 mph is back at Cricklewood so a 4 1/2 Mile ‘void’ exists where obtainable line speed ‘pan up’ exceeds the current 100 mph limit on pantograph raised obtainable speed.
I’d guess this location has been chosen as a “ straight bit” of track and catenary.
The only way round the issue is to acknowledge signage is in wrong place Or Instruct drivers to obey “ EMU 100” permanent speed restriction signage until they get to pan down location
Are 810s to be treated as an EMU or HST with regards to speed signage ?
in summary , read from top to bottom attached graphic IMG_0674.jpeg
 