Well each will have to clock up a certain number of miles of fault free running. Then there will be driver trainingDoes anyone know if each of the 33 units require months pf testing or is it just the first few?
Well each will have to clock up a certain number of miles of fault free running. Then there will be driver trainingDoes anyone know if each of the 33 units require months pf testing or is it just the first few?
I am guessing it will be a fairly similar regime to that of the Avanti 805s and 807s, however I am guessing a lot of EMR drivers will need training on OLE.Well each will have to clock up a certain number of miles of fault free running. Then there will be driver training
Maybe a few but not many. Most of us already drive 360's . All of the London and Kettering drivers do and quite a few Derby. Just some Derby drivers that might not , but it's part of the normal rules anyway.I am guessing it will be a fairly similar regime to that of the Avanti 805s and 807s, however I am guessing a lot of EMR drivers will need training on OLE.
A lot more testing is required with the 810s, due to the different carriage length, new engines etc.I am guessing it will be a fairly similar regime to that of the Avanti 805s and 807s, however I am guessing a lot of EMR drivers will need training on OLE.
First trip Into St Pancras planned today at lunchtime as 5Q45/46
then overnight testing CorbyTo Luton 5Q41/42/43/44 circuits
Diesel Throughout
If it is not silly question, if they are doing tests on diesel, why do it on a busy electrified line, not the unelectrified section.
Similiarly if testing platforms and clearances, surely would want to do it it in mode train will normally be working in the area, not in degraded version.
I imagine it's all part of testing. You'd need to check platforms and other interfere issues in both modes.If it is not silly question, if they are doing tests on diesel, why do it on a busy electrified line, not the unelectrified section.
Similiarly if testing platforms and clearances, surely would want to do it it in mode train will normally be working in the area, not in degraded version.
Is the linespeed still higher in Diesel? (I seem to recall this was the case?)Why is diesel mode classed as degraded version? These units are able to achieve and keep to time operating at 125mph, so doesn’t matter which mode it operates in.
The tenor of this thread suggests that might no longer be a concern when the first 810s actually enter passenger service!Which means if it's running in a 222 path, or to timings based on a 222, it will need to run on diesel into St Pancras to keep to time.
The tenor of this thread suggests that might no longer be a concern when the first 810s actually enter passenger service!
It can’t use the OHL for the test runs, as it is not authorised for use in electric mode anywhere on the midland mainline.Yes, but we're talking about whether it should be using the OHLE on the test runs that were scheduled for today.
Signs in place, but covered over.I imagine it's all part of testing. You'd need to check platforms and other interfere issues in both modes.
Not sure if the Pan-Down signs for 810s are in place yet. (Until the knitting on the MML is upgraded)
To maintain the pathing on the congested southern section of the midland mainline where they share with Thameslink?Sorry if its been asked before, but why do they have to perfectly match the performance of the 222s, surely the couple of minutes lost on the diesel section can be made up on electric, much like with the avanti 805s.
Surely they would be on electric at that point thoughTo maintain the pathing on the congested southern section of the midland mainline where they share with Thameslink?
The wires between Bedford and London are only rated for 100 mph.Surely they would be on electric at that point though
When the wires are able to be used at 125mph yes.Surely they would be on electric at that point though
Is there a thread on the 125mph OLE upgrade?When the wires are able to be used at 125mph yes.
But as they are not ready, the intention was to operate in diesel to maintain 125.
However as the wires may actually be upgraded and ready prior to passenger introduction, at that time then they will be able to operate on electric at 125mph.
A quick search on the Infrastructure section of the forum brings up the below thread, I presume that includes about the upgrade of the southern section.Is there a thread on the 125mph OLE upgrade?
That thread includes discussion of the upgrades to the OLE south of Bedford, interspersed with discussion of the extension of the OLE north of Kettering. There's no separate thread. You may have to look through a lot of pages to find relevant posts.A quick search on the Infrastructure section of the forum brings up the below thread, I presume that includes about the upgrade of the southern section.
MML Electrification: progress updates
https://www.linkedin.com/posts/dan-butler-29a42b2b5_ready-for-the-last-wire-run-at-market-harborough-activity-7204745464418635778-daNC?utm_source=share&utm_medium=member_desktop Dan Butler We completed the final wire run on L2W last night And there you have it - the final L2W wire run has...www.railforums.co.uk
If you search for "OLE125" or "OLE 125" you'll find many of the more recent posts (primarily within the afore-linked thread) on that topic.Is there a thread on the 125mph OLE upgrade?
Certainly Bedford to Kentish Town on diesel anyway, until all the OHLE is upgraded.Which means if it's running in a 222 path, or to timings based on a 222, it will need to run on diesel into St Pancras to keep to time.