Bletchleyite
Veteran Member
I wasn't advocating removing calls, only that they don't need quite so many non-stops, i.e. all should stop at Watford and some one of Hemel/Berko also.
Not a great idea as they'd end up overcrowded.
I wasn't advocating removing calls, only that they don't need quite so many non-stops, i.e. all should stop at Watford and some one of Hemel/Berko also.
The all shacks would have to be overtaken at International or they would stuff the Cov corridor up. Presumably they also stop at Stechford and Adderley Park as you havent noted them. Rugby Parkway and possibly an extra station at Cov will be open by the time a recast happens.Ahh I must have overlooked that flow. I guess you could have a fast Birmingham - Northampton service that only calls at BHI, COV and RUG however. Speaking of which…
How about 4tph between London and Birmingham via Northampton:
2tph Watford Junction, Hemel Hempstead, Leighton Buzzard, Bletchley, MKC, Wolverton, Northampton, Long Buckby, Rugby, Coventry, Birmingham International, Birmingham New Street
2tph Milton Keynes Central, Wolverton, Northampton, Long Buckby, Rugby, Coventry, Canley, Tile Hill, Berkswell, Hampton in Arden, Birmingham International, Marston Green, Lea Hall, Birmingham New Street
Hardly "world class" for Europe.........
Especially I need the timings of the Birmingham services to be reduced as they are too slow.
The second Liverpool service is possible without HS2. Im not sure I get the desire for lower fares as trains have been slowed down and then saying Birmingham needs speeding up. We had this discussion a few weeks back, HS2 speeds them up.I would like to see significantly lower fares, the services will become slower so we need compensating for this. I also would like to see a second Liverpool service. Especially I need the timings of the Birmingham services to be reduced as they are too slow.
Touché, it will do. Although will be more expensive than todayHS2 does that nicely for you.
Next years tickets will be more expensive than today as well.Touché, it will do. Although will be more expensive than today
Touché, it will do. Although will be more expensive than today
What do you mean a normalised basis? Without even thinking about inflation and price rises, journeys on HS2 will more a lot more expensive with the difference justified as recovering the cost of building the line. Freeing up capacity on the WCML is a good thing and faster journeys are even better don't get me wrong. But higher fares are not ideal for anyonereasonably sure that won’t be the case on a normalised basis.
Maybe a Northampton Fast service being Euston-Watford Junction-Leighton Buzzard-Milton Keynes-Northampton-Long Buckby-Rugby with it terminating in the Down Bays.Northampton should be 3 or 4 tph to London, not 2 as at present.
There also should be a second Trent Valley service, ideally via Northampton, so maybe fast to Northampton, then all stations to Crewe.
Hasn't it been pointed out many times that a) HS2 will have a lot of capacity, b) the existing non stop services are being moved across, c) the operational costs of HS2 will be lower, d) there is a need for it not to be a 'white elephant and e) the same operator will run services on HS2 and the residual fast WCML, such that fares should be expected to be around the same level charged by Avanti in real terms.What do you mean a normalised basis? Without even thinking about inflation and price rises, journeys on HS2 will more a lot more expensive with the difference justified as recovering the cost of building the line. Freeing up capacity on the WCML is a good thing and faster journeys are even better don't get me wrong. But higher fares are not ideal for anyone
That makes no sense whatsoever. The slower option should always be cheaper. Otherwise, everybody (well, most) will use that instead of HS2.Hasn't it been pointed out many times that a) HS2 will have a lot of capacity, b) the existing non stop services are being moved across, c) the operational costs of HS2 will be lower, d) there is a need for it not to be a 'white elephant and e) the same operator will run services on HS2 and the residual fast WCML, such that fares should be expected to be around the same level charged by Avanti in real terms.
If anything, the fares for through journeys on the residual WCML services should be pushed up to encourage people to use HS2 instead and free up capacity for intermediate journeys.
Yes, the slower option is LNWR not Avanti.That makes no sense whatsoever. The slower option should always be cheaper.
It's a mix if maximising yield but making sure people take the intended train.Otherwise, everybody (well, most) will use that instead of HS2.
This isn't great for Hemel and Berko - both around the LB usage level, and more than double Tring. In reality, Tring is a turnback, not an interchange. People don't need to change there today northbound, so that would be a massive downgrade.I suppose you could go to a pattern like:
4 Euston-Tring all stations
4 Euston-MKC WFJ, Tring then all stations (maybe half miss Cheddington, though I'd personally vote to put a large housing development next to it instead) running just in front
2 Euston-WFJ, LBZ, BLY, MKC, WOL, NMP then semifast to Brum
2 Euston-MKC, NMP then semifast to Brum
The present situation with the Tring stoppers being overlaid semifasts instead so they can just be pulled for a 2 track timetable is clever enough, but post HS2 probably not necessary.
I wouldn't call that fast! But it's not a bad semi-fast pattern. I don't think Northampton needs 4tph going to Birmingham slow. 2tph could run via Weedon and serve Rugby/Coventry faster (via Avanti type service) - or one could form a slower TV service.Maybe a Northampton Fast service being Euston-Watford Junction-Leighton Buzzard-Milton Keynes-Northampton-Long Buckby-Rugby with it terminating in the Down Bays.
What do you mean a normalised basis?
The slower option should always be cheaper.
I suppose you could go to a pattern like:
4 Euston-Tring all stations
4 Euston-MKC WFJ, Tring then all stations (maybe half miss Cheddington, though I'd personally vote to put a large housing development next to it instead) running just in front
2 Euston-WFJ, LBZ, BLY, MKC, WOL, NMP then semifast to Brum
2 Euston-MKC, NMP then semifast to Brum
The present situation with the Tring stoppers being overlaid semifasts instead so they can just be pulled for a 2 track timetable is clever enough, but post HS2 probably not necessary.
I wouldn't call that fast! But it's not a bad semi-fast pattern. I don't think Northampton needs 4tph going to Birmingham slow. 2tph could run via Weedon and serve Rugby/Coventry faster (via Avanti type service) - or one could form a slower TV service.
Oh yes I think Northampton should comfortably have 4tph minimum to London (and MK) - 2 can terminate.I don't think 4tph Northampton - Birmingham is needed - but Northampton should have more than 2tph to London - so my view would be 3tph with one northbound heading up the TV to Stoke & Crewe. It would mean Birmingham departures would have a 20/40 minute split rather than 30/30 from Northampton, but I don't think that's a huge issue.
I think the fasts would be better terminating at Rugby as it has a Bay facing Northampton, has better connections for further north than Birmingham and Long Buckby is a main railhead as Northampton has no parking so services need to go past Northampton to reach it.Oh yes I think Northampton should comfortably have 4tph minimum to London (and MK) - 2 can terminate.
I think there would be four standard patterns:
Euston - all stations to Watford/Tring (4tph)
Euston - Watford - Hemel - all stations to Bletchley/MKC/Northampton (2tph, Cheddington 1tph?)
Euston - Watford - LB - Bletchley - MKC - Northampton/Brum (2tph via Northampton and semi-fast to Birmingham)
Euston - Watford - MKC - wherever (actual fasts - inc 2tph Northampton shuttle, 2tph Rugby/TV, 2tph Coventry/Brum x2 - Wolves/onward option)
The Northampton fast shuttles could arguably skip Watford I suppose, would depend on what value it had as a future interchange hub and jobs.
Northampton has a large car park!Northampton has no parking
I was thinking they could run semi-fast between International and New Street, with trains alternating between calling at Marston Green and Lea Hall.The all shacks would have to be overtaken at International or they would stuff the Cov corridor up. Presumably they also stop at Stechford and Adderley Park as you havent noted them. Rugby Parkway and possibly an extra station at Cov will be open by the time a recast happens.
Northampton has a large car park!
Large car park at Long Buckby these days as well.And has done for a long time - Long Buckby has virtually nothing.
Are you keeping the TfW? That would be 11tph between International and New St. I dont think that would fit. You have 9tph now with effectively 7 fast (3 Avanti, 2 WMT, 1 XC and 1 TfW). You replace an Avanti with a XC and you are adding in another two fast. If it works you just end up with a flight of fasts.I was thinking they could run semi-fast between International and New Street, with trains alternating between calling at Marston Green and Lea Hall.
Basically the Coventry Corridor would look like this:
2tph XC Birmingham NS - South Coast
2tph Birmingham NS - London fast (International, Coventry, MKC, Watford Jcn only)
2tph Birmingham NS - London via Northampton. Alternating trains call at Marston Green and Lea Hall. Subsequently calls at all stations east of International to Northampton, then Wolverton and MKC only.
2tph Birmingham NS - London via Northampton. Calls at International, Coventry, all stations to Leighton Buzzard then Hemel and Watford.
2tph Birmingham NS - International (all stations stopper)
Ahh that’s probably a retrograde step then. Does Northampton need 4tph to Birmingham? If not, curtail 2tph of the Via Northampton services at Rugby and put the Rugby stop back in the Euston - New Street fasts. The other Northampton service could even be split there if Long Buckby still gets a direct train to London with the Rugby terminator. This then gives you:Are you keeping the TfW? That would be 11tph between International and New St. I dont think that would fit. You have 9tph now with effectively 7 fast (3 Avanti, 2 WMT, 1 XC and 1 TfW). You replace an Avanti with a XC and you are adding in another two fast. If it works you just end up with a flight of fasts.
The TFW services could probably terminate at New Street or even Wolverhampton P6, I know from experience that they can be quite empty from Birmingham International to New street and is probably due to the LNR service 4 minutes Infront.Are you keeping the TfW? That would be 11tph between International and New St. I dont think that would fit. You have 9tph now with effectively 7 fast (3 Avanti, 2 WMT, 1 XC and 1 TfW). You replace an Avanti with a XC and you are adding in another two fast. If it works you just end up with a flight of fasts.