When GWR received their first class 387s, 387130-131 arrived late evening, had overnight driver training and the 2 units went into service the next day!The 507s might not have been a new design entirely, but they certainly were new to Merseyside staff. Even the 313s, which pioneered this design, the first second-generation EMU and novel in many ways, took less than six months from first delivery to service introduction. The PEPs (i.e. the actual PEPs, the 445/6s) were substantially different from the production-run design as well.
Despite the advancements in technology, it still shouldn't be the case that the 777s are as unreliable as this over three years since the first was delivered.
I can only assume that as totally new units, less local enthusiasm? or creative paperwork delays matters!