Is there any benefit in ordering tilting trains though that won't ever tilt?
This route would benefit from tilt. I thought you were suggesting that there should be a large 390 order to replace diesel trains on all the lines to be electrified. Not all of these lines would benefit from tilt.To run from Birmingham and Manchester to Edinbrugh and Glasgow, yes
This route would benefit from tilt. I thought you were suggesting that there should be a large 390 order to replace diesel trains on all the lines to be electrified. Not all of these lines would benefit from tilt.
East Coast - Proberbly need to keep 5 diesel sets for their extended services, Aberdeen, Inverness and Hull Paragon. So they can loose 10 HSTs = 10 Sets
Would it be possible to timetable a London to Aberdeen or Inverness service as a single train (only in the public timetable as they would have to remain separate in the WTT) but with passengers required to change units at Edinburgh? That way the onward service from Edinburgh would not leave until the service from London has arrived.
No, these connections don't have to be held. What I'm suggesting is timetable it as a single service with a change of unit at Edinburgh. That way your connection is guaranteed. If it was simply an onward connection then in the interest of the passengers wanting to travel from Edinburgh to Aberdeen or Inverness then it may not be held.You mean like many operators currently do anyway on their public timetables, showing onward connections on their main timetables?
No, these connections don't have to be held. What I'm suggesting is timetable it as a single service with a change of unit at Edinburgh. That way your connection is guaranteed.
There are some disadvantages to not running beyond Edinburgh. Not everyone can change trains as easily as others, dissabled, elderly and people with heavy luggage have to be taken into account. I also expect some people would transfer to air if through services were withdrawn.
Basically, we don't need a new Bi-Mode train, if wires go up at a steady pace in the right places, not the politically correct ones.
If we need bi-mode trains we can use 220/221/222 units cascaded off diesel routes by new wires, (or buying enough 390s), with the addition of Pantograph carrages, without paying billions to the japs, just millions to Derby...
No, these connections don't have to be held. What I'm suggesting is timetable it as a single service with a change of unit at Edinburgh. That way your connection is guaranteed. If it was simply an onward connection then in the interest of the passengers wanting to travel from Edinburgh to Aberdeen or Inverness then it may not be held.
i'm another bi-mode man myself. Fit pantograph trailer to all voyager, maridian and adilantay and at the same gut the 220 and 221 internally and rebuild sorting the many problems and as has also been said, lets have some shorter 6 car 390s, again with maybe some design faults looked at, the whole managed by bombardia darby.
1)
4) The 390 Pendilino is not built in Derby, or by Bombardier, the're built by Alstom in Italy. And I don't think the French would want the British arm of a Canadian company managing one of their building projects in Italy.
1) Fitting a pantograph 180s, my overtired mistake. was more thinking of the 6 car units as replacements for TPE to run on the manchester Scotland, yes we do need some 8 Carage sets also. Alstom made a hash of so many projects that it might have been worth considdering a 390 design but ammended to be UK built by somebody else. as this is unlikely to happen however, to me the Bi mode option does make sense if they insist on doing it but hoping the sound proofing of underfloor engines is looked at as this is one of my favourite niggles with the Voyagers but doesnt seam to be so much of ann issue on units like the 222s. OK then move the voyager seating around but I was more thinking along the lines of solving the luggage situasion, providing more space for the "Gangway passenger", tipup seats etc and perhaps addressing the fantastic arae of bangs, rattles and shudders which seam to prevent work, sleap etc. some decent mobile phone enhancers would be a plan on the XC sets. and transformer to a Class 180 Aldente would be pointless, it's a diesel mechanical/hydrolic unit.
2) The voyagers don't need an internal re-build, they need the seats moving into the correct place
3) a 6 car 390 would not improve capacity on the Northern end terminating WCML, idealy it would be an order for 7 or 8 car units.
4) The 390 Pendilino is not built in Derby, or by Bombardier, the're built by Alstom in Italy. And I don't think the French would want the British arm of a Canadian company managing one of their building projects in Italy.
Though the first batch of Pendolinos were built in Birmingham (at the now closed MetroCammell factory)
Alstom and Bombardier have worked together though. The ICN is a Pendolino built by Bombardier in Switzerland (with Alstom, Bombardier and Pininfarina logos displayed on the sides of the driving cars) The NINA and Lotschberger units for BLS are another joint venture and some of the S-Bahn units for DB were a joint Adtranz/Alstom build
No. EC services are prime candidates for trimming back to eliminate the need for diesels running under the wires.
You run the Aberdeen/Inverness services all-electric to Edinburgh and terminate the electric set there, but have a guaranteed connecting diesel service (displaced Voyagers...?) for onward travel. Hull services could be given up altogether with a payment made to Northern/TPE/EMT/Hull Trains to operate a connecting shuttle service. The distance off the mainline is modest enough to allow that one to slide.
EC really should be an all-electric operator, as should VT. Given the distances that each of these operators run their diesel services under the wires both of these TOC's really don't have any excuse to operate their services in such a way.
O L Leigh
If you are scrapping the direct link from Hull/ Aberdeen/ Dundee etc to London, and asking people to change at Doncaster/Edinburgh onto an electric service then why not do the same with the GWML? Electrify to Cardiff/Bristol and ask people to change there? Or electrify to Swansea/ Exeter (or Plymouth) and get people to change there... then there's no need for "diesels under the wires" or "drags" or "IEP" or any of this. The reason there's this debate is because the GWML has more branches. If these don't all need a direct London link then you simplify the "problem"

So electrification of the MML and XC would release enough diesel stock, actually, yeah.
Ordering more Class 390s would release a significant amount of 221s from Virgin West Coast, replacing the 221s on Birmingham - Scotland, for Manchester - Scotland the 185s would be needed elsewhere in TPE anyway.
Midland Mainline would release all of the stock from it if done completly, 27 sets released.
Birmingham - Oxford would release all the Manchester - Reading sets. I think thats 8 or 9 sets.
Birmingham - Bristol Parkway, another load of ex. Manchester - Bristol sets. another 9 or 10 if I'm thinking right
So, order more trains and free 12 units, throw some wires up and free up upto another 50
There's been a lot of talk in this thread of doing what's best for passengers - making them change trains (particularly if they're heading down to the south west with large amounts of luggage) most emphatically is not. You simply the problem, but at the cost of providing a good service - many passengers would probably prefer no electrification at all to having to change trains on a journey where previously a direct service was offered. I'm still going with a change of traction at the station where the wires end myself - be it from electric loco to diesel loco, or EMU to diesel loco.
EDIT: Ooh, 1000 posts at last![]()
There's been a lot of talk in this thread of doing what's best for passengers - making them change trains (particularly if they're heading down to the south west with large amounts of luggage) most emphatically is not. You simply the problem, but at the cost of providing a good service - many passengers would probably prefer no electrification at all to having to change trains on a journey where previously a direct service was offered.
I think that with some targetted electrification elsewhere (and wiring from London to Oxford) I can find enough 125mph DMUs to replace GWML HSTs on a "one for one" basis though
This is the problem with talking about targetted rail electrification, IEP and generally bringing the railway kicking and screaming into the 20th Century (no, that isn't a mistake).
I say it again, we need rail electrification and bi-mode IEP will just be used as an excuse not to do it putting our rail infrastructure even further back into the Dark Ages. Ideally I would like to see the entire GW intercity network wired and the existing services preserved, but if we can only do some routes then we should be targetting those that would return the greatest benefit. If that means that some of the more lightly used portions of the routes are temporarily downgraded to diesel operated feeder services.
And this need not mean a reduction in the speed or convenience of the service. By preserving limited stopping patterns and high running speeds, particularly with the advantages of electric traction, journey times need not be any longer than now.
O L Leigh
I'm not advocating the current GWML scheme, but a much grander vision. These schemes are next to totally pointless and won't provide the improvements and benefits intended.
The GWML is a complicated set of routes but with the right vision and impetus there is no reason why they can't all be wired. Heck, if we could do the WCML and all it's various routes in the 1960's and 1970's and provide an electrified suburban network for (parts of) the North West, West Mids and Strathclyde then we can surely do the same again. Ideally that's the sort of vision I'm talking about. Wire up the MML, the GWML network, XC routes from, say, Oxford through to Brum, Derby and Sheffield to Leeds, York and the ECML, and then in-fill to link up places like Manchester and Sheffield. Also, lets see some wires going up north of Edinburgh and Glasgow too.
O L Leigh
I can't see the wires ever going beyond Plymouth. The largest conurbation beyond there is the Camborne/Redruth conurbation with a population of about 40000. I just can't see electrification justified. If Cornwall had independence or devolution like other Celtic nations though.....Finally, electrify to Swansea & Plymouth (or even Penzance?)